Gaur Siddhartham

Ghaziabad, Uttar Pradesh
01-03-2018
Launch Date
New
Type
27-08-2022
Completion Date

Overview

Launch Date

01-03-2018

Completion Date

27-08-2022

RERA ID

UPRERAPRJ3935

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)48750
Project NameGaur Siddhartham
Registration Fee (in Rs.)249000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)54
DistrictGhaziabad
Original Start Date-
TehsilGhaziabad
Proposed Start Date01-03-2018
Sanctioning Competent AuthorityU.P. Awas Evam Vikas Parishad
Project Cost (in Lacs)74781
Proposed Completion Date27-08-2022

Location

Latitude

28.65443106616418

Longitude

77.40501267413292

Bank Details

Account no.06230200000216
Name Of Account HolderCurrent Account
Bank NameBank of Baroda
Branch AddressK.G Marg, New Delhi-110001
Branch NameKasturba Gandhi Marg
IFSC CodeBARB0CURZON

Development Works

Demarcation of Plots

Designated plots is demarcated as per the Lease plan issued by the authority

Boundary Wall

Boundary wall has already been constructed on site

Road Work

Internal roads designed of different R.O.W. as per requirement

Footpaths

Footpaths is provided as per the Layout plan

Water Supply Including Drinking Water Facilities

Municipal water supply is used for drinking purpose.

Sewer System

Sewerage system is used with STP as per the design calculation

Drain

Separate drainage line is used as per the design requirement

Parks

Landscape area is provided as per Local Building Bye-laws

Tree Planting

No. of trees as per the approved drawings & requirements.

Design For Electric Supply Including Street Lighting

Electric supply including street lighting is provided as per the Layout plan.

Community Buildings

Designed for community facilities as per the design requirement

Treatment and Disposal System of Sewage and Sullage water

Disposal system of Sewage and Sullage water is being used through STP which is used for Landscape and flushing purpose.

Solid Waste Management And Disposal System

All the solid waste managed as per the biogradible waste converted in to compost and non biogradible delivered to registered recyclable agencies.

Water Conservation System

Low flow water fixtures being used for water conservation and STP water is used for landscape and flushing purpose.

Energy Management System Including Use of Renewable Energy

Specific U-value glass is used for energy management and for roof insulation light colour tiles is used, and for renewable energy Solar photovoltic energy is used for common areas.

Fire Protection And Fire Safety System

Fire system and fire safety system is installed in the buildings as per the NBC norms.

Social Infrastructure And Other Public Amenities Including Public Health Services

Social infrastructure and other public amenities including public health services are provided as per local Building Bye-laws

Emergency Evacuation Services

As per Enviornment management plan and Disaster management plan all provisions are made including assembly point

Other Miscellaneous Work

Other Miscellaneous work is provided as per the Layout Plan

Documents

Registry Document

No: 1502 | Date: 25-01-2016

Other Plan(If Any)

Other Plan(If Any)

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 03-09-2019

Commencement Certificate

Uploaded: 29-07-2018

Proforma of Application Form

Uploaded: 29-07-2018

Proforma of Allotment Letter

Uploaded: 29-07-2018

Proforma of Conveyance Deed

Uploaded: 29-07-2018

Waste Disposal Plan

Uploaded: 29-07-2018

Water Supply Plan

Uploaded: 29-07-2018

Electricity Supply Plan

Uploaded: 29-07-2018

Development Work Plan

Uploaded: 29-07-2018

Affidavit

Uploaded: 29-07-2018

CA CERTIFICATE

Uploaded: 21-07-2021

ARCHITECT CERTIFICATE

Uploaded: 20-11-2020

ENGINEERS CERTIFICATE

Uploaded: 20-11-2020

Floor plans of all types

Uploaded: 29-07-2017

Other Plan(If Any)

Uploaded: 29-07-2017

Registry Document In Case of Own Land

Uploaded: 11-10-2017

Authentic copy of Approval of Project

Uploaded: 11-10-2017

Commencement Certificate

Uploaded: 11-10-2017

Proforma of Application Form

Uploaded: 11-10-2017

Proforma of Allotment Letter

Uploaded: 11-10-2017

Proforma of Conveyance Deed

Uploaded: 11-10-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 11-10-2017

Waste Disposal Plan

Uploaded: 11-10-2017

Water Supply Plan

Uploaded: 11-10-2017

Development Work Plan

Uploaded: 11-10-2017

Affidavit

Uploaded: 11-10-2017

Electricity Supply Plan

Uploaded: 11-10-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 11-10-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 11-10-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 11-10-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 11-10-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 11-10-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 11-10-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 11-10-2017

Floor plans of all types

Uploaded: 11-10-2017

Other Plan(If Any)

Uploaded: 29-11-2017

Other Plan(If Any)

Uploaded: 29-11-2017

Other Plan(If Any)

Uploaded: 29-11-2017

Other Plan(If Any)

Uploaded: 15-12-2017

Other Plan(If Any)

Uploaded: 19-12-2017

Other Plan(If Any)

Uploaded: 05-01-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 15-01-2018

Water Supply Plan

Uploaded: 16-01-2018

Water Supply Plan

Uploaded: 16-01-2018

Development Work Plan

Uploaded: 16-01-2018

Development Work Plan

Uploaded: 16-01-2018

Affidavit

Uploaded: 16-01-2018

Other Plan(If Any)

Uploaded: 22-01-2018

Permits

Orignal Permit No754/NP-40/2016-17/VN-5
Orignal Permit Date24-03-2017
Valid Upto23-03-2022
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto22-03-2025
End Date28-02-2022
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)J.K Projects
Contractor Address485/A opp. Street No-21, Main Road, Jafrabad, Delhi-110053
Architect NameKailash Aggarwal
Architect AddressGaur Biz Park, Plot No-1, Abhay Khand-II, Indirapuram, Ghaziabad (U.P)
Architect Licence NumberCA/86/10069
Structural Engineer NameVakil Mehta Sheth
Structural Engineer Address83/84, 8th Floor, Sakhar Bhawan, 230, Nariman Point, Mumbai-400021
Mobile number(Project Co-ordinator)9582279254

Land Details

AFS

Showing 11 blocks with 431 units

Property Summary

Total Carpet Area

169681.12 m²

1826430.61 ft²

Total Units

3068

5 different types

Blocks & Floors

11

33 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:55.31 m²
Balconies:585
Parking ratio:0.00 per unit

Block BLOCK-A

48 units

Block BLOCK-B

49 units

Block BLOCK-C

58 units

Block BLOCK-D

68 units

Block BLOCK-E

34 units

Block BLOCK-F

31 units

Block BLOCK-G

31 units

Block BLOCK-H

31 units

Block BLOCK-I

31 units

Block EWS-LIG BLOCK

42 units

Block SCHOOL BLOCK

8 units

Khasra Details

Total Area

48750.00 m²

524740.13 ft²

1 plot
Plot
TypePlot
Khasra/Plot No08-BS-01
Area(In Sq. Mt.)48750

Other Details

Contractor Name (if any)J.K Projects
Contractor Address485/A opp. Street No-21, Main Road, Jafrabad, Delhi-110053
Architect NameKailash Aggarwal
Architect AddressGaur Biz Park, Plot No-1, Abhay Khand-II, Indirapuram, Ghaziabad (U.P)
Architect Licence NumberCA/86/10069
Structural Engineer NameVakil Mehta Sheth
Structural Engineer Address83/84, 8th Floor, Sakhar Bhawan, 230, Nariman Point, Mumbai-400021
Mobile number(Project Co-ordinator)9582279254