The land is clearly demarcated properly.
The entire boundary wall of land is complete.
The approach road till the project is complete.
Completed
Drinking water will be supplied through a bore well and the water supply of rest service will be managed through the bore well.
STP INSTALLED AT SITE.
Raim water drain constructed at the site.
Parks have been constructed as per the approved drawing.
Tree plantation completed at site.
All this work will be carried out as per architectural drawing.
not provided
STP CONSTRUCTED AT SITE.
Dalab ghar will be constructed at the site.
Rainwater harvesting system will be installed at the site.
not provided
Fire safety system as per approved drawing will be installed at site.
not provided
not provided
TEMPLE, FOUNTAIN E.T.C
Showing 1 blocks with 2 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
33590.00 m²
361559.40 ft²