Launch Date
Completion Date
RERA ID
27.231784
77.952772
As per the approved sanctioned plan. This is a single plot having a total of 1no.of the entry gate and 1no. of the exit gate from the 60-foot wide road and 45 foot internal road.
2-meter height and 180 mm thick boundary wall designed or with MS railing as created by the designer. Brock work of 9 inches and RCC work in column and beam may be used. The Entrance and exit gate are already constructed at the site of the MS steel structure.
The approach road to the project and the inner road connecting the towers and projects have already been completed with RCC and cement block with a 60-foot wide road.
All footpaths are completed with well-designed and constructed RCC and cemented blocks with 20-foot footpaths.
A bore well will supply drinking water, and the bore well will manage the water supply for the rest of the service.
A centralized sewerage system shall be provided. All sewerage water shall go to the STP for treatment. After treatment, water shall be recycled and used in gardening flush tanks—vehicle washing. Whenever overflow from the STP is connected to the municipal sewerage system,
A drain water system shall be provided. Strom water from the road and other landscape areas shall be connected to the stormwater drain channel and recharged in the rainwater harvesting pit. Groundwater and overflow shall be associated with the municipal drain line.
All parks have been constructed with the best landscaping and greenery and look beautiful.
Tree plantation has been completed at the site as per designed by the landscaping architect.
All street light poles are installed at the site. Street poles cover the whole site. The electricity supply at the site started, and the supply of electric poles began.
The clubhouse was developed at the site with all amenities i.e. swimming pool, gym, kids playroom games room, etc.
STP was constructed at the site and running smoothly with 550 KLD
Dalab Ghar will be constructed at the site.
A rainwater harvesting system will be installed at the site.
Not to be provided.
The fire plan is clearly marked and indicates the complete fire protection arrangement at the site and the means of access/escape for the proposed building with suitable legend along with standard signs and symbols on the drawing.
Not to be provided.
A fire staircase with fire-resistant doors is provided in each building. A dedicated assembly area is also defined on the campus. Also, adequate signage shall be provided.
Temple, Fountain, etc.
Showing 4 blocks with 27 units
Total Carpet Area
20989.44 m²
225928.23 ft²
Total Units
412
2 different types
Blocks & Floors
4
10 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
29948.00 m²
322357.28 ft²