Launch Date
Completion Date
RERA ID
27'13'54.32'N
77'57'08.71'E
The land is clearly demarcated properly.
yes (Not possible since its already a part of entire project. The entire boundary wall of land is complete.
The approach road till the sub project (tower) is complete.
N/A
Drinking water will be supplied through bore well and water supply of rest services will be managed through bore well and treated water through STP.
STP will be installed at site.
Rain water drains will be contracted as per architectural drawings and rain water harvesting system will be installed.
Parks have been constructed as per approved drawing.
Tree plantation will be completed as per Architectrul drawing
All these work will be carried out as per architectural drawing
Club House along with Community facilities Like , Party hall , Gym , Games Room , ETC. Have been constructed as per site
phythorid Technology STP will be constructed at site which will be duly Approve by Neeri
Dalab Ghar will be constructed at site as per approval and nagar nigam would be responsible for lifting up solid wate from this dalab ghar
rainwater harvesting system with recharge pits will installed at site
Not applicable
Fire safety system as per approved drawing will be installed at site
not applicable
not applicable
Temple, Fountains, Childrens swings etc have also been provided at the site
Showing 2 blocks with 9 units
Total Carpet Area
7797.60 m²
83932.59 ft²
Total Units
108
1 different types
Blocks & Floors
2
7 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
63000.00 m²
678125.70 ft²