Have queries on this Project?
26.514600
81.00040
Showing 4 blocks with 82 units
Total Carpet Area
45635.48 m²
491215.74 ft²
Total Units
789
3 different types
Blocks & Floors
4
30 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
21215.00 m²
228356.14 ft²
This is a hotel-cum-commercial development, wherein three towers of SCO Blocks (High Street Retail) development are being constructed. Apart from this, there is a high-rise twin-tower building being developed, while in the smaller-height block there is a hotel development with the Radisson Blu brand. The larger building block has a mix of serviced apartments, office spaces, and hotel units, which will be offered for sale to the general public.
2.1 m high and rcc work in column and beam. At the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall.
From the main entrance gate we have 80 mm thick interlocking brick /RCC road through out the project. Whose wideness starts from 8 mtr.
We will provide footpaths on both side of the roads.
We will provide Two nos. of pump for the requirement of blocks through underground pipelines.
Modular Sewerage system shall be Provided.(Capicity 560 KLD) All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.when come into force.
Storm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.
"We will provide green area with the different activities and the green area will have gaming facilities for kids."
We will provide many type of trees all along the boundary wall & green area
We will design & implement the system as per local electricity Board and will consider centralized Transformer, (Capicty 4X2500 KVA) HT panel, LT Panel, Feeder Pillar and DG (Capicity 2000x6) back for common service like External lighting, Fountain, STP, Pump room etc. we will design
NA
Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force.
There are a proper garbage collection area provided for the solid waste management.
We will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level. Capicity of water tank use for raw water (4 Lakh Litre + domestic (4 Lakh Litre) +fire (6 Lakh Litre)
We will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.
We will provide Fire Fighting facility in common areas while Individual owner can install their own system as per their and local authorities requirement.
NA
We will have staircases which will be provided with emergency exit doors and emergency exit gates
NA
Ganpati Capital Court is located in Lucknow.
Yes. Ganpati Capital Court is registered under UPRERAPRJ126611/06/2026 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Ganpati Capital Court is 23 November 2030.
Ganpati Capital Court is developed by LUCKNOW BUILDWELL PRIVATE LIMITED.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.