Have queries on this Project?
26.809086
83.354366
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
No: COMPLETION APPLICATION TO GDA | Date: 22-05-2025
Total Area
11141.00 m²
119920.61 ft²
Proper Demarcation of plots with brickwork
230 mm/115mm thick boundary wall already made
9.00 Meter and 7.5 meter road already completed
1.0 meter footpath both side
pump including underground pipelines for all plots
Modular sewer system along with STP shall be provided
Storm water, rain Water harvesting and Ground water recharge system shall be provided
The park area shall be developed as per Sanctioned Drawings and as per UP Building Byelaws and Kids Play area shall be also provided
80 Nos. of tree shall be planted as per sanctioned plan
220 KV Substation if required, 33KV HT VCB panel, CSS, LT cable, Earthing, 33/11 KV transformer, HT LT cable, Electrical panel and street lighting shall be provided
Not Applicable
STP shall be provided
Garbage collection area shall be provided for solid waste management
Rain water harvesting shall be provided
Solar street lights shall be provided
All fire protection system shall be provided in common areas. The project is residential / plotted development
Drinking water facility shall be provided for common use.
shall be provided in case of emergency
NA