Total Units
0
0 unit types
Carpet Area
0 ft²
0.00 m² · carpet only, excludes balcony
Blocks & Floors
0
0 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 0 ft² (0.00 m²)Balconies 0Parking per unit 0.004 of 4 rows list no units (1 floor is empty), so they add nothing to these totals
Showing 4 of 4 rows · 3 of 12 columns
| Block | Floor | Type |
|---|---|---|
| — | — | — |
| — | — | — |
| — | — | — |
| — | — | — |
Total Plot Area
3.10 acres
12,539.72 m² · plot area
Every plot has been demarcated through concrete markers/natural stone markers.
A boundary wall of approx 550 mtr running foot, 6 feet 1.80 mtr high and thickness of 9 inches, will be made to cover the boundaries of the project. Brick will be used as material to make the boundary wall. Pillars of about 10-12 feet will also be placed in between the running boundary wall to support the boundary walls.
A bitumen mix road of approx 3500 sq mtr will be laid off for easier connectivity through out the project. The width of the road will be approx 7.50 to 9 mtr wide with 100-150 mm (4-6 inches) base thickness. The top of road will be approx 40-55 mm thick bitumen mix.
Foothpaths of approx 1200 sq mtr will be made using interlocking tiles with 60-80 mm thick pavers on 50-75 mm thick sand bed.
water connectivity through pipe of approx 385 mtr of length will be installed for smoother water supply into each plot. Also, a pit to supply water facility to each plot, has already been made in Phase-I (Existing) which will be used in Phase-II (Proposed) also. However Underground water tank of extended 2.28 lac LTR capacity is already installed in Phase-I. CI, PVC, or PPR pipes of 50-150 mm sizes will be used.
DWC pipes of PVC of 200-300 mm with thickness of 2.5-3.5 mm will be laid through out the project to connect sewer waste of each plot with already installed STP of capacity of 90 KLD in Phase II (Existing)
Ditch of size of approx 8x12 inches will be laid throughout the project for easier bypass of rain water.
Parks of approx 1200 sq mtr will be made to enhance the green environment. The parks will be made with land scape features. Lush green lawns with a mix of sunny and shaded areas. Flower beds with seasonal flowers and shrubs will also be planted in the parks.
Tree plantation will be carried out within the project premises in accordance with approved landscape plans. Suitable native and climate-resilient species will be selected to ensure sustainability, low maintenance and ecological balance. Adequate spacing, soil preparation and provision for irrigation shall be ensured for healthy growth. Proper maintenance including watering, pruning and replacement of dead plants, shall be undertaken by the developer.
Two new transformers will be installed with a capacity of 400 KWA (approx) each. MS pipes will be used to make poles for street lighting. The height of the street light poles shall be approx 4-5 mtr of height. The poles shall be colored with black, gray or silver colors. The lights of the poles will be of approx 5000-15000 lumens comprises of LED, HPS or MH with power consumption of 50-200W.
Not Applicable
Phase-I (Existing) project has already been equipped with a fully functional STP with a capacity of 90 KLD which will be used for Phase-II (Proposed) also for the effective treatment and disposal of sewage and sullage water generated from the plots of the project. The capacity of STP installed in Phase-I (Existing) has already been approved through BDA Map for the use in Phase-II (Proposed) also. All wastewater from toilets, Kitchens and other domestic uses is collected through a dedicated drainage network and conveyed to the STP. Sludge generated from the treatment process is periodically removed and disposed of in an environmentally responsible manner. This system ensures sustainable water management and compliance with applicable environmental regulations.
The project is equipped with a STP and treated waste will be converted into manure.
Rain water harvesting system will be installed in parks to collect the rain water aimed at efficient utilization and sustainable management of water resources. Measures include reuse of treated wastewater for landscaping and flushing and optimized irrigation systems to minimize wastage. These initiatives collectively ensure reduced water consumption, improved resource efficiently and long term environmental sustainability of the development.
Not Applicable
Not Applicable
Public toilets of area around 23 mtr will be constructed within the project. The same has already been approved through BDA Map.
Not Applicable
Not Applicable
Gaj Green Extension is located in Bareilly.
Yes. Gaj Green Extension is registered under UPRERAPRJ326313/11/2026 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Gaj Green Extension is 1 October 2031.
Gaj Green Extension is developed by GAJKESARI INFRA DEVELOPERS.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.