NewActive

Express One34

Gautam Buddha Nagar, Uttar Pradesh
01-04-2026
RERA Received Date
New
Type
23-07-2030
Completion Date

Overview

RERA Received Date

01-04-2026

Completion Date

23-07-2030

RERA ID

UPRERAPRJ816123/04/2026

Location

Latitude

28.505273

Longitude

77.384313

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)12580
Project NameExpress One34
Registration Fee (in Rs.)136000
AddressPlot No. 5A5B, Block No. P, Sector 134, Noida, UP
Village/Locality/Sector etc.Bajidpur, Sector 134
StateUttar Pradesh
Project Duration (In month)52
DistrictGautam Buddha Nagar
Original Start Date-
TehsilDadri
Proposed Start Date01-04-2026
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)8173
Proposed Completion Date23-07-2030

Bank Details

Account Details
Name of the AccountExpressway Hospitality Private Limited Collection A/c For Express One34
Account Number777705345148
Bank NameICICI Bank Ltd
Branch NameSector- 137, Noida
Branch Address104, Plot No GH-07A, Gulshan Vivante, Sector-137, Noida, U.P-201301
IFSC CodeICIC0003451
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
Branch Email Address[email protected]
Separate Account Details
Name of the AccountExpressway Hospitality Private Limited Separate Bank A/c For Express One34
Account Number777705345149
Bank NameICICI Bank Ltd
Branch NameSector-137, Noida
Branch Address104, Plot No GH-07A, Gulshan Vivante, Sector-137, Noida, U.P.- 201301
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeICIC0003451
Transaction Account Details
Name of the AccountExpressway Hospitality Private Limited RERA Transaction A/c For Express One34
Account Number777705345150
Bank NameICICI Bank Ltd
Branch NameSector-137, Noida
Branch Address104, Plot No GH-07A, Gulshan Vivante, Sector-137, Noida, U.P.-201301
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeICIC0003451

Development Works

Demarcation of Plots

As per lease plan

Boundary Wall

2.1m high boundary wall. Consists of finished brickwork up to 1.5m. Form 1.5m to 2.1m, is constructed out of MS members.

Road Work

6 m wide internal R.C.C roads with vacuum dewatering treatment at top.

Footpaths

Combination of greens and stone pavers as per landscape consultant.

Water Supply Including Drinking Water Facilities

An underground storage reservoir is used to collect the municipal water supply. Water must also be stored underground as a reserve for combating fires. Static storage for fire fighting is suggested in accordance with NBCs current needs. Water will overflow into the storage chamber for domestic use in order to avoid the water in the static storage tank becoming stagnant. Static storage would always be available for fire fighting thanks to this technology . One day of storage for the entire amount of water needed is suggested. it is suggested that the terrace be used for overhead storage tanks. According to the National Building Code, static storage would also be used for fire fighting. (1) Commercial Building - Fire tank -100 KL, Raw/ Domestic - 70KL (2) Banquet Hall - Fire tank - 370 KL, Raw/ Domestic 100KL

Sewer System

Under the basement ceiling, a single network of sewer pipes will collect soil and waste from the kitchen and toilets. It is proposed that a sewage treatment plant be built on the property to handle sewage. Length of sewer line 310M, Size of Sewer pipe - 200 mm Dia

Drain

The buildings terraces and balconies are planned to be drained by down take pipes, while open areas and roadways would be drained through drains. These drains are designed to be oriented along the Complex s roads in accordance with the landscape design. The down take pipes from terraces and balconies would discharge into or over an inlet to the complex s surface drains. The drains will be emptied into the municipal drainage system after passing via rainwater gathering and groundwater recharge devices. Length of Drain line 375 M, Size of Drain pipe - 250 mm Dia.

Parks

Landscaping of the parks with plantation including water features , evergreen trees, shrubs and ground covers with benches and walkways.

Tree Planting

As per landscape consultant

Design For Electric Supply Including Street Lighting

The State Electricity Board will provide power to the building. Due to the sources instability caused by frequent brownouts and blackouts, it is suggested that complete DG power backup to be offered. Certain essential loads, including emergency lighting and powered equipment of the ELV system, will require supplementary support through a UPS (Battery backup) system. lllumination for streets, parking lots, landscaped areas, and walkways (both shaded and open ) will be managed by a static timer for energy conservation. LEDs should be utilized in all shared spaces and outdoor lighting to decrease energy usage . No of Lighting Pole - 25 No Transformer - 3 No. Type of light - LED

Community Buildings

A wedding venue including dedicated banquet - related spaces such as ceremonial halls, pre-function/foyer area, outdoor lawns , pool deck , resting rooms for the guests , service areas, catering kitchen, and supporting amenities for hosting large and small community functions. Also there is a proposal for a dedicated complex for various support facilities such as coffee shops, restaurants etc.

Treatment and Disposal System of Sewage and Sullage water

The installation of a sewage treatment plant is suggested for the site manage sewage treatment. The amount of recycled water needed for flushing and horticulture must be treated to a tertiary level, and the remaining waste shall be released into the municipal drainage system following treatment. STP Capacities - 50KLD for Commercial and 100 KLD for Banquet

Solid Waste Management And Disposal System

Segregation of soild waste

Water Conservation System

a. Pumps will be operated using level sensors to prevent water waste and unnecessary equipment operation. b. Pumps and equipment will be selected based on their best energy efficiency. c. Water conservation measures will be implemented, including low flow fixtures and flow restrictors. d. Dual- flush flushing cisterns will save water. Water consumption in dual flush will be a maximum of 3 litres for low flush and 6 litres for high flush. e. Sensor-based urinals will be installed to ensure that flushing occurs only when needed, thereby reducing water consumption. f. A sewage treatment plant is proposed to treat all waste generated. g. Recycling treated effluent reduces the project s total net fresh water demand. This reduces dependence on municipal supply. h. Irrigation system management will be provided by providing the most recent irrigation system, such as sprinkler systems, time-based controllers, water metering, and so on , in order to reduce horticultural water consumption. i. Rainwater harvesting and groundwater recharge for both roof and non-roof areas are available. The total volumetric capacity of recharge structures must be as specified by the regulations. j. Water metering will be provided for landscape water consumption , treated waste water consumption, swimming pool and fountain consumption, and hot water consumption via the solar system, k. Irrigation system management will be provided the most recent irrigation systems, such as sprinkler systems, time based controllers, water metering, and so on , in order to reduce horticultural water consumption.

Energy Management System Including Use of Renewable Energy

UPPCL Power Supply ( Transformer of 1 into800 KVA +2into 1250 KVA) and Backup Power thru DG Set (750 KVA +2 into1010 KVA+1 into500 KVA ) Solar PV capacity (1percent of Demand load) 5 KWP for Commercial and 16 KWP for banquet

Fire Protection And Fire Safety System

Building will comprise of fire fighting system and fire alarm as per NCR guidelines and UP fire Department. No of Hydrant - 35 No. Fire Pumps- 4 No. ( 2 SETS ) UG tank 100 KL + 370 KL

Social Infrastructure And Other Public Amenities Including Public Health Services

Provided 63 shops with 10 offices in support facility and 60 resting rooms for the guests in banquet complex for user convenience.

Emergency Evacuation Services

Provided landscaped lawn at Ground and Terrace.

Other Miscellaneous Work

Work based on the nature of work ( example No of CCTV units, benches), beautification efforts, signage , aesthetic and utility elements. CCTV proposed as per project requirement.

Documents

Registry Document

No: 4229 | Date:

Registry Document

No: 4228 | Date:

Allotment Letter issued by Competent Authority

No: Possession Letter and NDC | Date:

Allotment Letter issued by Competent Authority

No: Plot No. 5A and 5B Merger Letter | Date:

Details of Encumbrances

Uploaded: 21-02-2026

Commencement Certificate

Uploaded: 27-01-2026

Other Plan(If Any)

Uploaded: 21-02-2026

Proforma of Application Form

Uploaded: 27-01-2026

Proforma of Allotment Letter

Uploaded: 27-01-2026

Proforma of Conveyance Deed

Uploaded: 27-01-2026

Waste Disposal Plan

Uploaded: 11-03-2026

Water Supply Plan

Uploaded: 11-03-2026

Electricity Supply Plan

Uploaded: 11-03-2026

Development Work Plan

Uploaded: 11-03-2026

Affidavit

Uploaded: 27-01-2026

CA CERTIFICATE

Uploaded: 27-01-2026

ARCHITECT CERTIFICATE

Uploaded: 21-02-2026

ENGINEERS CERTIFICATE

Uploaded: 21-02-2026

Other

Uploaded: 27-01-2026

Proforma of Agreement for Sale

Uploaded: 20-04-2026

Permits

Orignal Permit No2025/03/25/12192
Orignal Permit Date24-07-2025
Valid Upto23-07-2030
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto23-06-2035
End Date23-07-2030
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)Express Hospitality Pvt. Ltd.
Contractor Address325, Jagriti Enclave, East Delhi, Delhi-110092
Architect NameMr. Balraj Singh
Architect Address65, Regal Building, Connaught Place, New Delhi - 110001
Architect Licence NumberCA/2005/37210
Structural Engineer NameMr. Ashwini Kapoor
Structural Engineer Address65, Regal Building, Connaught Place, New Delhi - 110001
Mobile number(Project Co-ordinator)9582255151

Land Details

AFS

Showing 2 blocks with 140 units

Property Summary

Total Carpet Area

9486.11 m²

102107.54 ft²

Total Units

140

2 different types

Blocks & Floors

2

6 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:67.76 m²
Balconies:46
Parking ratio:0.00 per unit

Block SUPPORT FACILITY

74 units

Block BANQUET BLOCK

66 units

Khasra Details

Total Area

12580.00 m²

135409.86 ft²

1 plot
Plot
TypePlot
Khasra/Plot No5A and 5B, Block No. P, Sector 134, Noida
Area(In Sq. Mt.)12580

Other Details

Contractor Name (if any)Express Hospitality Pvt. Ltd.
Contractor Address325, Jagriti Enclave, East Delhi, Delhi-110092
Architect NameMr. Balraj Singh
Architect Address65, Regal Building, Connaught Place, New Delhi - 110001
Architect Licence NumberCA/2005/37210
Structural Engineer NameMr. Ashwini Kapoor
Structural Engineer Address65, Regal Building, Connaught Place, New Delhi - 110001
Mobile number(Project Co-ordinator)9582255151