Have queries on this Project?
26.4701
81.0326
Showing 1 blocks with 78 units
Total Carpet Area
4009.98 m²
43163.02 ft²
Total Units
78
1 different types
Blocks & Floors
1
13 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3040.00 m²
32722.26 ft²
There is a single plot 3040 sq. mtr., having total 1 no. of entry gate and 1 no. of exit gate from the 30 Mtr wide front road Site as per proposed Master Plan
Brick Work of 9 inches and RCC work in column and beam may be used as per design. MS Broad entrance and exit
All internal roads will have concrete pavers or equivalent finishes
Wide footpath in thick concrete pavers or equivalent finishes
Ground Water Supply facility to be arranged
Centralized Sewerage system shall be Provided. Sewer pipes will be laid underground and disposal of sewage shall be done through municipal sewerage system.
Water from Roads and other landscape area shall be connected to the water drain channel and go to the Rain water harvesting Pit for recharge the Ground water.
There is one main park on the entrance with play area for children & with amphitheater
Several small and big plants and trees shall be put in the park and the surroundings
System has been designed as per local electricity Board and consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, etc.
N.A.
Centralized Sewerage system shall be Provided. STP shall be provided for treatment of sewerage disposal.
There are a proper garbage collection area provided. Nagar Nigam to collect garbage from this point.
Rain water harvesting system shall be provided for the whole building complex to conserve water
We will use LED lights fitting in external area . All equipments shall have energy efficient motors.
All the fire norms shall be followed as NBC and approval of fire department
N.A.
N.A.
N.A.
Excella Kutumb Phase-IV is located in Lucknow.
Yes. Excella Kutumb Phase-IV is registered under UPRERAPRJ541833 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Excella Kutumb Phase-IV is 19 February 2025.
Excella Kutumb Phase-IV is developed by EXCELLA INFRAZONE LLPM/S ABC INFRAPROMOTERS PRIVATE LIMITEDM/S WALSON INFRAREAL LLPMR. MANOJ KUMAR SHUKLAMR. RAJNIKANT MISHRA.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.