Grubbing/Clearing, Identification of Plots of Demarcation of Bench Marks Plot Corners will be demarcated with Brick Work Pillars.
We already have boundary, but it needs to be repaired with brick work and paint. Height of the Boundary wall is 2.1 Meter.
RCC Trimix Finish Road (M 25 Grade of Concrete).
Inter Locked pavers and Curb Stones.
MDPE Domestic Water Supply Pipe Lines to Plots from OHT or UGR. OHT/UGR will feed from Municipal Water Supply.
RCC Hume Pipes (NP 3 Grade) distribution network to STP ( Outside Project Domain in Township).
Saucer Drains/Catch Basins Hume Pipes (NP 3 Grade) to RWH Structures. Overflow to Municipal Drain.
As per Plan, We will provide Landscape and Foot Path inside the park.
As per Landscape Plan.
Service Connections to Plots from Captive Sub-Stations. Street and Park Lighting 6.5/9 Meters Electric Pole as per Layout.
Not Applicable
Treated water used for Horticulture and Road washing. Connectivity to STP in township (Beyond Project Boundaries).
Door to Door collection from Plots to common segregation and disposal unit near vendor zone. Final disposal by Municipal System.
RWH Structures to harvest rain water suitably located in parks/ open spaces.
Not Applicable.
Not Applicable.
Common facilities like community hall, schools and play ground obtain within the Emerald Gulistan Township of which phase is a part.
Not Applicable.
CCTV/Telephone/Security in Twonship (Beyond Project Boundaries). Theme wall on two sides of the project to enclose the project.
No: Book No. 1 Volume No. 5370 Page Nos. 51 to 68, at serial no. 528 | Date: 14-02-2011
Showing 1 blocks with 6 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
47515.59 m²
511453.06 ft²