NewActive

EMERALD GULISTAN PHASE-III

Kanpur Nagar, Uttar Pradesh
01-12-2020
Launch Date
New
Type
31-03-2022
Completion Date

Overview

Launch Date

01-12-2020

Completion Date

31-03-2022

RERA ID

UPRERAPRJ542474

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)24534
Project NameEMERALD GULISTAN PHASE-III
Registration Fee (in Rs.)128000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)16
DistrictKanpur Nagar
Original Start Date-
TehsilKanpur
Proposed Start Date01-12-2020
Sanctioning Competent AuthorityKanpur Development Authority
Project Cost (in Lacs)1162
Proposed Completion Date31-03-2022

Location

Latitude

26.420244493250706

Longitude

80.40985129414257

Bank Details

Account no.0090102000042732
Name Of Account HolderJ.K. COTTON LIMITED RERA DESIGNATED ACCOUNT FOR EMERALD GULISTAN PHASE-III
Bank NameIDBI BANK
Branch AddressM. G. ROAD, KANPUR
Branch NameM.G. ROAD KANPUR
IFSC CodeIBKL0000090

Development Works

Demarcation of Plots

Grubbing/Clearing and Filing, Identification of plots of demarcation of benchmarks with level of 450 mm down from the Road Level. Plot Corner will demarcate with four numbers of brick work pillars.

Boundary Wall

From Phase-II to UGR and OTH side boundary wall/ retaining wall.

Road Work

RCC Road.

Footpaths

Interlocked Pavers and curve stones.

Water Supply Including Drinking Water Facilities

MDPE domestic water supply pipelines to plots from OHT or UGR. OHT/UGR will feed from municipal water supply.

Sewer System

RCC NP3 hume pipes distribution network to STP (outside project domain in Township)

Drain

Saucer drains/catch basins NP3 Hume pipes to RWH structures. Overflow to Municipal drain.

Parks

Provision of Park-6 (P-6), Totlots (P-12) and Totlots (P-13) as per Bye laws/ Sanctioned Plan from KDA.

Tree Planting

Provision of Tree Planting is as per Bye Laws/ Sanctioned Plan from KDA.

Design For Electric Supply Including Street Lighting

Service connections to plots from captive Substations. Street and Park Lighting 6.5/9 meters electric poles as per layout.

Community Buildings

N.A.

Treatment and Disposal System of Sewage and Sullage water

Treated water used for horticulture and road washing. Connectivity to STP in Township (Beyond project boundaries)

Solid Waste Management And Disposal System

Door to Door collection from plots to common segregation and disposal unit near Vendor Zone. Final disposal by Municipal system.

Water Conservation System

RWH structures to harvest rain water suitably located in parks/open spaces as per design.

Energy Management System Including Use of Renewable Energy

N.A.

Fire Protection And Fire Safety System

N.A.

Social Infrastructure And Other Public Amenities Including Public Health Services

Four shops required shall be provided in future in a common cluster within the Emerald Gulistan Township.

Emergency Evacuation Services

N.A.

Other Miscellaneous Work

Filling, signage, toe wall, benches for parks etc.

Documents

Registry Document

No: 528 | Date: 14-02-2011

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

CA CERTIFICATE

Details of Encumbrances

Uploaded: 23-10-2020

Commencement Certificate

Uploaded: 23-10-2020

Proforma of Application Form

Uploaded: 23-10-2020

Proforma of Allotment Letter

Uploaded: 23-10-2020

Proforma of Conveyance Deed

Uploaded: 23-10-2020

Waste Disposal Plan

Uploaded: 23-10-2020

Water Supply Plan

Uploaded: 23-10-2020

Electricity Supply Plan

Uploaded: 23-10-2020

Development Work Plan

Uploaded: 23-10-2020

Affidavit

Uploaded: 23-10-2020

CA CERTIFICATE

Uploaded: 12-11-2020

ARCHITECT CERTIFICATE

Uploaded: 23-10-2020

ENGINEERS CERTIFICATE

Uploaded: 23-10-2020

Permits

Orignal Permit No1055/BHAWAN/ONLINE/2018-19
Orignal Permit Date29-06-2019
Valid Upto28-06-2024
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto28-06-2025
End Date31-03-2022
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)RITU INFRACON BUILDS LIMITED
Contractor Address117/K/13, GUTAIYA, KANPUR-208025
Architect NameSAMIR KUMAR CHAKRAVORTY
Architect Address87, DEEN DAYAL NAGAR, KANPUR
Architect Licence NumberCA 81-06388
Structural Engineer NameNA
Structural Engineer AddressNA
Mobile number(Project Co-ordinator)8009551300

Land Details

Plot

Showing 1 blocks with 3 units

Property Summary

Total Carpet Area

0.00

0.00 ft²

Total Units

0

1 different types

Blocks & Floors

1

1 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:NaN
Balconies:0
Parking ratio:NaN per unit

Block undefined

3 units

Khasra Details

Total Area

24534.46

264086.47 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoPART OF PLOT NO. 2, SCHEME NO. 39, JAJMAU, KANPUR
Area(In Sq. Mt.)24534.46

Account Closure Details

Processing Time

717 days

From application to approval

Application Submitted

16-04-2022

Application Approved

02-04-2024

Other Details

Contractor Name (if any)RITU INFRACON BUILDS LIMITED
Contractor Address117/K/13, GUTAIYA, KANPUR-208025
Architect NameSAMIR KUMAR CHAKRAVORTY
Architect Address87, DEEN DAYAL NAGAR, KANPUR
Architect Licence NumberCA 81-06388
Structural Engineer NameNA
Structural Engineer AddressNA
Mobile number(Project Co-ordinator)8009551300