26.420244493250706
80.40985129414257
Total Units
0
0 unit types
Carpet Area
0 ft²
0.00 m² · carpet only, excludes balcony
Blocks & Floors
0
0 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 0 ft² (0.00 m²)Balconies 0Parking per unit 0.003 of 3 rows list no units (1 floor is empty), so they add nothing to these totals
Showing 3 of 3 rows · 3 of 12 columns
| Block | Floor | Type |
|---|---|---|
| — | — | — |
| — | — | — |
| — | — | — |
Total Plot Area
6.06 acres
24,534.46 m² · plot area
Grubbing/Clearing and Filing, Identification of plots of demarcation of benchmarks with level of 450 mm down from the Road Level. Plot Corner will demarcate with four numbers of brick work pillars.
From Phase-II to UGR and OTH side boundary wall/ retaining wall.
RCC Road.
Interlocked Pavers and curve stones.
MDPE domestic water supply pipelines to plots from OHT or UGR. OHT/UGR will feed from municipal water supply.
RCC NP3 hume pipes distribution network to STP (outside project domain in Township)
Saucer drains/catch basins NP3 Hume pipes to RWH structures. Overflow to Municipal drain.
Provision of Park-6 (P-6), Totlots (P-12) and Totlots (P-13) as per Bye laws/ Sanctioned Plan from KDA.
Provision of Tree Planting is as per Bye Laws/ Sanctioned Plan from KDA.
Service connections to plots from captive Substations. Street and Park Lighting 6.5/9 meters electric poles as per layout.
N.A.
Treated water used for horticulture and road washing. Connectivity to STP in Township (Beyond project boundaries)
Door to Door collection from plots to common segregation and disposal unit near Vendor Zone. Final disposal by Municipal system.
RWH structures to harvest rain water suitably located in parks/open spaces as per design.
N.A.
N.A.
Four shops required shall be provided in future in a common cluster within the Emerald Gulistan Township.
N.A.
Filling, signage, toe wall, benches for parks etc.
Processing Time
717 days
From application to approval
16-04-2022
02-04-2024
Emerald Gulistan Phase-Iii is located in Kanpur Nagar.
Yes. Emerald Gulistan Phase-Iii is registered under UPRERAPRJ542474 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Emerald Gulistan Phase-Iii is 31 March 2022.
Emerald Gulistan Phase-Iii is developed by J. K. COTTON LIMITED.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.