EMAAR BUSINESS DISTRICT 75A

GURUGRAM, BADSHAHPUR ST
06-09-2022
Launch Date
NEW
Type
2027-08-23
Completion Date

Overview

Launch Date

06-09-2022

Completion Date

2027-08-23

RERA ID

RERA-GRG-1135-2022

Basic Details

Project NameEMAAR BUSINESS DISTRICT 75A
Project IDRERA-GRG-1135-2022
Project TypeNEW
Applicant TypeCompany
Submission Date06-09-2022 02:01:59 PM
Builder NameEMAAR INDIA LIMITED
CINU45201DL2005PLC133161
PANXXXX308B
Emailcoordination.in@emaar.ae
Websitehttps://in.emaar.com/en/
Phone (Mobile)9810697239
Phone (Landline)01244421155
Registered AddressEMAAR BUSINESS PARK, MG ROAD, SIKANDERPUR, SECTOR- 28, GURUGRAM - 122001
Project AddressVILLAGE - BEGAMPUR KHATOLA, SECTOR 75A, GURUGRAM
DistrictGURUGRAM
TehsilBADSHAHPUR ST

Bank Details

Bank NameAXIS BANK, DLF CYBER CITY, DLF PHASE-III, GURGAON, HARYANA-122002
Account Number922020019136568
IFSC CodeUTIB0004761
MICR Code110211350
Branch Code4761

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Rahul Bindle E303, Park View City 1, Sector 48, Sohna, Gurugram
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Attached

Development Details

Land Area4.55625 (Acre)
Proposed FAR1.5
Permissible FAR1.5
Total Licensed Land4.55625 (Acre)

Land Usage

PLOTS TO BE SOLD1.5947
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0
CONSTRUCTION OF ROADS2.27537
PAVEMENTS0
PARKS AND PLAYGROUNDS0.25205
GREEN BELTS0
VEHICLE PARKINGS0.33977
ELECTRICITY SUB-STATION0.06301
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0.00642
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
UGT0.00642
TOILET0.01853
Total4.55627

Cost Details

Land Cost1754 Lakhs
Other Cost3744 Lakhs
Estimated Project Cost8143 Lakhs
Estimated Infrastructure Cost2645 Lakhs
Estimated Apartment Construction Cost0 Lakhs

Documents

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 26-08-2022

LOI

Uploaded on: 26-08-2022

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 30-08-2022

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 30-08-2022

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 30-08-2022

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 30-08-2022

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 30-08-2022

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 30-08-2022

DEMARCATION PLAN

Uploaded on: 31-08-2022

DEMARCATION SUPERIMPOSED ON LAYOUT

Uploaded on: 31-08-2022

ASSURANCE APPROVAL OF STORM WATER AND SEWERAGE

Uploaded on: 31-08-2022

BBA DRAFT

Uploaded on: 31-08-2022

STANDARD PLAN SUBMISSION-D2

Uploaded on: 15-06-2023

STANDARD PLAN SUBMISSION-B09 & B11

Uploaded on: 15-06-2023

SIJRA & REVENUE DOCS (EBD-75A)

Uploaded on: 15-06-2023

DRAINAGE SCHEME

Uploaded on: 15-06-2023

FLUSHING SCHEME

Uploaded on: 15-06-2023

ROAD SCHEME

Uploaded on: 15-06-2023

SERVICE ESTIMATE REPORT

Uploaded on: 15-06-2023

SEWERAGE SCHEME

Uploaded on: 15-06-2023

WATER SUPPLY SCHEME

Uploaded on: 15-06-2023

STANDARD PLAN SUBMISSION-A1

Uploaded on: 15-06-2023

STANDARD PLAN SUBMISSION-A2,A8,D7,D11

Uploaded on: 15-06-2023

STANDARD PLAN SUBMISSION-A3,A5,A9

Uploaded on: 15-06-2023

STANDARD PLAN SUBMISSION-C01

Uploaded on: 15-06-2023

STANDARD PLAN SUBMISSION-A4,A6

Uploaded on: 15-06-2023

STANDARD PLAN SUBMISSION-A7,D6,D12,D16

Uploaded on: 15-06-2023

STANDARD PLAN SUBMISSION-A10

Uploaded on: 15-06-2023

STANDARD PLAN SUBMISSION-B01 & C12A

Uploaded on: 15-06-2023

STANDARD PLAN SUBMISSION-B02, B08, B12,C02,C04,C06,C08,C12

Uploaded on: 15-06-2023

STANDARD PLAN SUBMISSION-B03, B05, C03,C5,C9,C11

Uploaded on: 15-06-2023

STANDARD PLAN SUBMISSION-B04, B06 & C10

Uploaded on: 15-06-2023

STANDARD PLAN SUBMISSION-B07, B12A & C07

Uploaded on: 15-06-2023

STANDARD PLAN SUBMISSION-B10

Uploaded on: 15-06-2023

STANDARD PLAN SUBMISSION-B14

Uploaded on: 15-06-2023

STANDARD PLAN SUBMISSION-B15

Uploaded on: 15-06-2023

STANDARD PLAN SUBMISSION-D1

Uploaded on: 15-06-2023

STANDARD PLAN SUBMISSION-D8,D10,D14

Uploaded on: 15-06-2023

LAND TITLE SEARCH REPORT

Uploaded on: 15-06-2023

STANDARD PLAN SUBMISSION-D3

Uploaded on: 15-06-2023

STANDARD PLAN SUBMISSION-D4

Uploaded on: 15-06-2023

STANDARD PLAN SUBMISSION-D5,D9,D12A,D15

Uploaded on: 15-06-2023

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 15-06-2023

STANDARD PLAN SUBMISSION-D17

Uploaded on: 15-06-2023

COLLABORATION AGREEMENT-AMAR GYAN DEVELOPMENTS - UP TO 31.12.2009

Uploaded on: 15-06-2023

COLLABORATION AGREEMENT-SNOW WHITE BUILDCON __REGD. ON 10.06.13

Uploaded on: 15-06-2023

SUPPLEMENTARY COLLABORATION AGREEMENT_75A

Uploaded on: 15-06-2023

NEC- 4.56 (EBD-75A)

Uploaded on: 15-06-2023

Statutory Approvals

LOI VIDE MEMO NO. LC-4755-JE(VA)/2022/19299Date: 07-07-2022Status: ALREADY BEEN OBTAINED
LICENSE APPROVED VIDE MEMO NO. 129 OF 2022Date: 24-08-2022Status: ALREADY BEEN OBTAINED
APPROVED LAYOUT VIDE DRAWING NO. DTCP 8566Date: 25-08-2022Status: ALREADY BEEN OBTAINED
ASSURANCE OF STORM WATER CONNECTIONDate: 29-08-2022Status: ALREADY BEEN OBTAINED
ASSURANCE OF SEWERAGE CONNECTIONDate: 29-08-2022Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: No
Building PlanApproved: No
Site PlanApproved: Yes
Floor PlanApproved: No
Apartment PlansApproved: No
Elevation SectionApproved: No
Detail of Permissible FARApproved: No
Detail of covered area achieved FARApproved: No

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERAS PER PROJECT REPORT
PARKINGAS PER PROJECT REPORT
STPAS PER PROJECT REPORT
UG TANKAS PER PROJECT REPORT
RAIN WATER HARVESTINGAS PER PROJECT REPORT
ELECTRICAL SUB STATION AND ANCILLIARY BUILDINGAS PER PROJECT REPORT
ELECTRICAL PANELSAS PER PROJECT REPORT
SIGNAGES PLOT DEMARCATIONAS PER PROJECT REPORT
SWITCHING STATION WORKSAS PER PROJECT REPORT
COMMERCIAL SIGNAGES LED SCREENAS PER PROJECT REPORT
EXTENSION PARTAS PER PROJECT REPORT
CONTINGENCIES LC GSTAS PER PROJECT REPORT

NOC

ROADSProvider: GMDAApproval Status: Approved
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Pending
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Contact Details

Project ContactEmail: coordination.in@emaar.aeMobile: 9953263515Landline: 01244421155
Project Contact PersonName: LAV PORWALEmail: coordination.in@emaar.aeMobile: 9953263515Landline: 01244421155

Land Details

Land Area4.55625 (Acre)
Proposed FAR1.5
Permissible FAR1.5
Total Licensed Land4.55625 (Acre)

Land Usage

Land Cost1754 Lakhs
Other Cost3744 Lakhs
Estimated Project Cost8143 Lakhs
Estimated Infrastructure Cost2645 Lakhs
Estimated Apartment Construction Cost0 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2022 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0-00
Commercial Signages LED Screen----
Contingencies LC GST0-8.4514.5
Electical Panels----
Electrical Panels----
Electrical Sub Station Ancilliary Building---8.5
Electrical Sub Station and Ancillary Building----
Electricity Supply System0-00
Extension Part----
Miscellaneous Works Horticulture Works Road Works MTC Repair Works----
Other0-00
Parking----
Parks and Playgrounds0-00
Rain Water Harvesting---0
Roads & Pavements0-00
STP---8.9
Security And Fire Fighting----
Security and Fire Fighting----
Sewerage0---
Sewerage treatment & garbage disposal0-19.814.8
Shopping area0-00
Signages Plot Demarcation----
Storm Water Drainage0-17.713.2
Street Light----
Switching Station Works---0
UG Tank---0
Water Supply System0-018.9
2023 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Commercial Signages LED Screen----
Contingencies LC GST58.1988.61139.34136.8
Electical Panels--119.747.9
Electrical Panels0119.7--
Electrical Sub Station Ancilliary Building----
Electrical Sub Station and Ancillary Building18.618.616.912.7
Electricity Supply System58.5785255.3
Extension Part0000
Miscellaneous Works Horticulture Works Road Works MTC Repair Works66101.492.2
Other0000
Parking--5.310.6
Parks and Playgrounds18.136.336.354.4
Rain Water Harvesting008.59.8
Roads & Pavements042.85765.6
STP17.830.240.835.5
Security And Fire Fighting--2.32
Security and Fire Fighting00--
Sewerage----
Sewerage treatment & garbage disposal9.912.314.814.8
Shopping area0000
Signages Plot Demarcation--3.62.9
Storm Water Drainage8.81113.213.2
Street Light--6.65.7
Switching Station Works105.921.2127.1169.5
UG Tank0000
Water Supply System14.19.411.814.1
2024 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Commercial Signages LED Screen035.370.670.6
Contingencies LC GST117.94.32.14.3
Electical Panels95.847.900
Electrical Panels----
Electrical Sub Station Ancilliary Building----
Electrical Sub Station and Ancillary Building12.7000
Electricity Supply System32.522.89.816.3
Extension Part0000
Miscellaneous Works Horticulture Works Road Works MTC Repair Works99.242.664.741.8
Other0000
Parking5.373.8364.2360.28
Parks and Playgrounds54.472.536.354.4
Rain Water Harvesting8.5000
Roads & Pavements39.942.814.322.8
STP17.83.13.12.3
Security And Fire Fighting2.68.78.76.6
Security and Fire Fighting----
Sewerage----
Sewerage treatment & garbage disposal12.312.312.30
Shopping area0000
Signages Plot Demarcation2.91.423.923.9
Storm Water Drainage1111110
Street Light7.41.83.53.5
Switching Station Works105.903.60
UG Tank08.98.98.9
Water Supply System14.111.811.811.8
2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres00--
Commercial Signages LED Screen3.82.5--
Contingencies LC GST45.337--
Electical Panels20.520.5--
Electrical Panels----
Electrical Sub Station Ancilliary Building----
Electrical Sub Station and Ancillary Building8.2---
Electricity Supply System3.96.5--
Extension Part23.323.3--
Miscellaneous Works Horticulture Works Road Works MTC Repair Works----
Other00--
Parking1.1---
Parks and Playgrounds30.524.4--
Rain Water Harvesting0.70.7--
Roads & Pavements13.80--
STP5.95.9--
Security And Fire Fighting0.30.5--
Security and Fire Fighting----
Sewerage----
Sewerage treatment & garbage disposal00--
Shopping area00--
Signages Plot Demarcation0.31.4--
Storm Water Drainage1.30--
Street Light2.94.3--
Switching Station Works46.546.5--
UG Tank4.94.9--
Water Supply System5.80--

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSENOT APPLICABLE
WALL FINISHING DETAILSNOT APPLICABLE
KITCHEN DETAILSNOT APPLICABLE
BATHROOM FITTINGSNOT APPLICABLE
WOOD WORK ETCNOT APPLICABLE
DOORS AND WINDOS FRAMESNOT APPLICABLE
GLASS WORKNOT APPLICABLE
ELECTRIC FITTINGSNOT APPLICABLE
CONDUCTING AND WIRING DETAILSNOT APPLICABLE
CUPBOARD DETAILSNOT APPLICABLE
WATER STORAGENOT APPLICABLE
LIFT DETAILSNOT APPLICABLE
EXTERNAL GLAZINGSNOT APPLICABLE
WINDOWS/GLAZINGSNOT APPLICABLE
DOORSNOT APPLICABLE
MAIN DOORSNOT APPLICABLE
INTERNAL DOORSNOT APPLICABLE
AIR CONDITIONINGNOT APPLICABLE
ELECTRICAL FITTINGSNOT APPLICABLE
CNG PIPE LINENOT APPLICABLE
PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
EXTERNAL FINISHING/COLOUR SCHEMENOT APPLICABLE
INTERNAL FINISHINGNOT APPLICABLE

Unit-wise Specifications

TOILET
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
COUNTERSNOT APPLICABLE
SANITARY WARE/CP FITTINGSNOT APPLICABLE
FIXTURESNOT APPLICABLE
KITCHEN
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
COUNTERSNOT APPLICABLE
FIXTURESNOT APPLICABLE
KITCHEN APPLIANCESNOT APPLICABLE
SIT-OUTS
FLOORNOT APPLICABLE
WALLS & CEILINGNOT APPLICABLE
RAILINGSNOT APPLICABLE
FIXTURESNOT APPLICABLE
BED ROOMS
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
WARDROBESNOT APPLICABLE
MASTER TOILET
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
COUNTERSNOT APPLICABLE
SANITARY WARE/CP FITTINGSNOT APPLICABLE
FITTING/FIXTURESNOT APPLICABLE
MASTER BEDROOM/DRESSROOM
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
MODULAR WARDROBESNOT APPLICABLE
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORNOT APPLICABLE
WALLS & CEILINGNOT APPLICABLE
TOILETNOT APPLICABLE
BALCONYNOT APPLICABLE

Fee Details

Payment 1
amount:1106500
cheque no:53734
draft date:24-08-2022
payable to:HRERA Gurugram
payee bank:KOTAK MAHINDRA BANK