NewActive

ELITE

Gorakhpur, Uttar Pradesh
24-08-2024
Launch Date
New
Type
21-07-2029
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

21-07-2029

RERA ID

UPRERAPRJ954073/10/2024

Basic Details

Project TypeNew
Project CategoryMixed
Total area in round figure (Sq.mt.)6889
Project NameELITE
Registration Fee (in Rs.)59250
AddressSonauli Road, Gorakhpur
Village/Locality/Sector etc.Lacchipur
StateUttar Pradesh
Project Duration (In month)59
DistrictGorakhpur
Original Start Date-
TehsilGorakhpur
Proposed Start Date24-08-2024
Sanctioning Competent AuthorityGorakhpur Development Authority
Project Cost (in Lacs)6631
Proposed Completion Date21-07-2029

Location

Latitude

26.791823

Longitude

83.354942

Bank Details

Account Details
Name of the AccountARDPL RERA COLLECTION ACCOUNT ELITE
Account Number0384102100000948
Bank NamePunjab National Bank
Branch NameBank Road, Gorakhpur
Branch AddressBank Road, Gorakhpur
IFSC CodePUNB0038410
Branch DistrictGorakhpur
Branch StateSelect
Branch Email Addressbo038410@pnb.co.in
Separate Account Details
Name of the AccountARDPL RERA SEPERATE AC ELITE
Account Number0384102900000010
Bank NamePunjab National Bank
Branch NameBank Road, Gorakhpur
Branch AddressBank Road, Gorakhpur
Branch StateUttar Pradesh
Branch DistrictGorakhpur
IFSC CodePUNB0038410
Transaction Account Details
Name of the AccountARDPL RERA TRANSACTION ACCOUNT ELITE
Account Number0384102100000957
Bank NamePunjab National Bank
Branch NameBank Road, Gorakhpur
Branch AddressBank Road, Gorakhpur
Branch StateUttar Pradesh
Branch DistrictGorakhpur
IFSC CodePUNB0038410

Development Works

Demarcation of Plots

We possess a plot measuring 6888.60 square meters with primary entrance gate that opens onto a 32-meter wide main road.

Boundary Wall

A 2-meter high, 230-mm thick brick wall with RCC columns and beams will be constructed. At the corner facing the road, the project logo will be displayed, creating an attractive, iconic design for the entrance gate.

Road Work

From the main entrance gate, there will be an interlocking brick or RCC road throughout the project, with a width starting at 6 meters.

Footpaths

We will not be providing any footpath.

Water Supply Including Drinking Water Facilities

We will install 2 pumps to meet the requirements of the blocks through underground pipelines.

Sewer System

An MBBR sewage treatment system will be installed. All sewage water will be directed to the STP, and any overflow from the STP will be connected to the municipal sewerage system once it is operational.

Drain

A storm water drainage system will be provided. Storm water from the roads and landscaped areas will be directed to the storm water drain channel and then to the rainwater harvesting pit to recharge the groundwater. Any overflow will be connected to the municipal drain line.

Parks

We will create a green area featuring various activities, including gaming facilities for children.

Tree Planting

We will plant various types of trees along the boundary wall and in the green areas.

Design For Electric Supply Including Street Lighting

We will design and implement the system in accordance with the local electricity boards regulations, incorporating a centralized transformer, HT panel, LT panel, feeder pillar, and DG backup for common services such as external lighting, fountains, STP, and the pump room.

Community Buildings

A clubhouse will be provided at ground floor level, featuring a gymnasium, a multipurpose hall, and a card room.

Treatment and Disposal System of Sewage and Sullage water

An MBBR sewage treatment system will be installed. All sewage water will be directed to the STP, and any overflow from the STP will be connected to the municipal sewerage system once it is operational.

Solid Waste Management And Disposal System

A designated area for proper garbage collection is provided for solid waste management.

Water Conservation System

We will install low-flow fixtures, dual flush cisterns, and a rainwater harvesting system to decrease water consumption and enhance groundwater levels.

Energy Management System Including Use of Renewable Energy

We will utilize LED lighting in external and common areas, along with solar lights in landscaped zones. All engineering equipment will be energy-efficient, and we will also recommend that individuals use LED lights and energy-efficient air conditioning systems.

Fire Protection And Fire Safety System

All norms of National Builing Code and Local Fire Authority recommendations will be complied with.

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

Staircases will be equipped with emergency exit doors.

Other Miscellaneous Work

NA

Documents

Registry Document

No: 1629 | Date: 08-02-2023

Extract of Khatauni

No: 1429-1434 | Date: -

Extract of Khatauni

No: Land division | Date: -

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 28-08-2024

Commencement Certificate

Uploaded: 28-08-2024

Proforma of Application Form

Uploaded: 28-08-2024

Proforma of Allotment Letter

Uploaded: 28-08-2024

Proforma of Conveyance Deed

Uploaded: 28-08-2024

Waste Disposal Plan

Uploaded: 28-08-2024

Water Supply Plan

Uploaded: 28-08-2024

Electricity Supply Plan

Uploaded: 28-08-2024

Development Work Plan

Uploaded: 28-08-2024

Affidavit

Uploaded: 28-08-2024

CA CERTIFICATE

Uploaded: 05-09-2024

ARCHITECT CERTIFICATE

Uploaded: 28-08-2024

ENGINEERS CERTIFICATE

Uploaded: 28-08-2024

Other

Uploaded: 28-08-2024

Proforma of Agreement for Sale

Uploaded: 28-08-2024

Permits

Orignal Permit NoGroup Housing/05829/GKDA/BP/23-24/1883/13032024
Orignal Permit Date22-07-2024
Valid Upto21-07-2029
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto21-07-2032
End Date21-07-2029
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)JKW Construction
Contractor AddressShop no 23-25, Third Floor, Cross road Mall, Bank Road Gorakhpur
Architect NameRanjit Sabikhi
Architect AddressB-6,W-43 Greater Kailash II, New Delhi 110048
Architect Licence NumberCA/75/54
Structural Engineer NameAjay Gupta
Structural Engineer AddressC-486, GROUND FLOOR, C.R. PARK, NEW DELHI - 110019
Mobile number(Project Co-ordinator)6388319578

Land Details

AFS

Showing 2 blocks with 151 units

Property Summary

Total Carpet Area

14067.99 m²

151426.44 ft²

Total Units

142

4 different types

Blocks & Floors

2

13 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:99.07 m²
Balconies:233
Parking ratio:0.00 per unit

Block Elite Heights

95 units

Block Elite Square

56 units

Khasra Details

Total Area

6888.60 m²

74148.20 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No619 Mi
Area(In Sq. Mt.)6888.6

Other Details

Contractor Name (if any)JKW Construction
Contractor AddressShop no 23-25, Third Floor, Cross road Mall, Bank Road Gorakhpur
Architect NameRanjit Sabikhi
Architect AddressB-6,W-43 Greater Kailash II, New Delhi 110048
Architect Licence NumberCA/75/54
Structural Engineer NameAjay Gupta
Structural Engineer AddressC-486, GROUND FLOOR, C.R. PARK, NEW DELHI - 110019
Mobile number(Project Co-ordinator)6388319578