Launch Date
Completion Date
RERA ID
28.4506
79.4363
Demarcation of Plot has been completed as per plan.
216 RMT RCC and BW structure with Plaster Finish and Paint as per plan.
100mm thick GSB, 100mm Thick WMM, 100mm Thick CC finish 80mm thick Concrete Pavers Finish on top and kerb stone are provided.
No Footpaths
Water Supply through bore well/ municipal supply collected in under ground water tank , further distribution from over head tank to individual units by gravity. Water Supply DI line UGT to EWS- LIG is 250m and 67m in EWS-LIG
Sewer System with DWC pipes of 200m connected to STP from EWS- LIG and 245m in EWS/LIG, treated water through UPVC pipes will be used for gardening and flushing, of length 200m from STP to EWS/ LIG and 165 m in EWS/ LIG excess treated water would be disposed in municipal line.
Storm Water Drain system with DWC pipes of 215 m connected to rain water harvesting pits.
NA
47 nos of trees has been planted as per approved plan
Electrical supply including street light (GI poles) 14 in number has been provided as per scheme approval.
NA
Sewer system with DWC pipes connected to STP, treated water will be used for gardening and flushing, excess treated water will be disposed in municipal lines
Would be provided as per guidelines as per EC approval.
1-Rain water harvesting pits has been executed ( as required) and used as manhole in horticulture.
NA
Fire hydrant would be provided as per norms and approved scheme.
NA
Would be provided as per guidelines as per norms
NA
Showing 2 blocks with 23 units
Total Carpet Area
3594.84 m²
38694.50 ft²
Total Units
108
1 different types
Blocks & Floors
2
5 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3537.00 m²
38071.91 ft²