Launch Date
Completion Date
RERA ID
28.450696340265424
79.43639040280182
Done
R.C.C & Brick work Structure with MS railing & with Plaster Finish & paint. As per Plan
2 layer WBM, CC Pavers on top and Kerb stone etc
Pavers over a base of PCC
Water supply through Bore Well/ Municipal supply collected in under ground water tank and pumped to Overhead water tank, further distribution from Over Head tank to individual units under gravity
Sewer system with RCC NP2 pipes connected to STP, treated water will be used for gardening and flushing, excess treated water would be disposed in Municipal line.
Storm water Drain System with RCC NP2 pipes connected to Rain water harvesting pits.
Parks will be provided as per approved plan
Tree planting will be provided as per approved plan
Electrical supply including street light (GI poles) will be provided as per the Scheme approval.
NA
Sewer system with RCC NP2 pipes connected to STP, treated water will be used for gardening and flushing, excess treated water would be disposed in Municipal line.
Would be provided as per guidelines given in EC approval.
Rain water harvesting pits are planned (as required) for recharging of under ground water aquifers
Solar panel will be used as far as possible for energy conservation. CFL/ LED bulbs would be used for common area lighting.
Fire Hydrant would be provided as per norms
Would be provided as per guidelines given in EC approval
NA
Boundary wall and main gate would be constructed for security of the complex, CCTV camera would be used on main gate for visitor monitoring
Total Area
56045.70 m²
603270.31 ft²