NewActive

Eldeco City Courtyard

Lucknow, Uttar Pradesh
01-05-2026
RERA Received Date
New
Type
18-01-2031
Completion Date

Overview

RERA Received Date

01-05-2026

Completion Date

18-01-2031

RERA ID

UPRERAPRJ525838/04/2026

Location

Latitude

26.934085

Longitude

80.911104

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)6806
Project NameEldeco City Courtyard
Registration Fee (in Rs.)79000
AddressCommercial Plot S.C.O at Plot No -1, Integrated Housing scheme, Eldeco City, Hardoi Bye pass, Sitapur Road, Lucknow
Village/Locality/Sector etc.Eldeco City
StateUttar Pradesh
Project Duration (In month)57
DistrictLucknow
Original Start Date-
TehsilBakshi Ka Talab**
Proposed Start Date01-05-2026
Sanctioning Competent AuthorityLucknow Development Authority
Project Cost (in Lacs)425
Proposed Completion Date18-01-2031

Bank Details

Account Details
Name of the AccountM/S-EHIL-COL A/C FOR ELDECO CITY COURTYARD
Account Number99916999123456
Bank NameHDFC Bank
Branch NameVibhuti Khand,Gomti Nagar,Lucknow
Branch AddressTC-V-13-2/A, Vibhuti Khand, Gomti Nagar,Lucknow-226010
IFSC CodeHDFC0004805
Branch DistrictLucknow
Branch StateUttar Pradesh
Branch Email Address[email protected]
Separate Account Details
Name of the AccountM/S.EHIL-SEP A/C FOR ELDECO CITY COURTYARD
Account Number99914999123456
Bank NameHDFC Bank
Branch NameVibhuti Khand,Gomti Nagar, Lucknow
Branch AddressTC-V-13-2/A,Vibhuti Khand, Gomti Nagar, Lucknow-226010
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeHDFC0004805
Transaction Account Details
Name of the AccountM/S.EHIL-TRAN A/C FOR ELDECO CITY COURTYARD
Account Number99920999123456
Bank NameHDFC Bank
Branch NameVibhuti Khand,Gomti Nagar, Lucknow
Branch AddressTC-V-13-2/A,Vibhuti Khand,Gomti Nagar,Lucknow-226010
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeHDFC0004805

Development Works

Demarcation of Plots

Project site is part of an approved/developed layout and is very well marked and defined at site.

Boundary Wall

The site has a 2.5 mt high boundary wall on the west side. Being an open shopping complex, a 680 mm high MS railing has been proposed on other three sides to keep the complex visible.

Road Work

12 mt road network of RCC with 150 mm trimix over 100 mm WBM over 150 mm stone ballast have been planned and constructed. Site is approached by an existing 24 mt wide CC road.

Footpaths

A 1.2 mt wide footpath on both sides shall be part of internal 12 mt road width. Footpath shall be of 60 mm thick Granite/Cone. Blocks laid over 100 mm WBM over 150 mm Stone ballast.

Water Supply Including Drinking Water Facilities

A 25 mm potable water supply shall be available on all the floors through a terrace tank. of 100 lt. capacity . 5 taps of drinking water on all the floors shall be provided. All the terrace tanks shall be filled with underground water using 2 boring points and UGT of capacity 60 KLD.

Sewer System

A 150 dia HDPE sewer line is planned to be laid to collect soil water from the toilet area and connect it to the already laid township sewer line. The township sewer line is connected to the 400 KLD township STP.

Drain

A 280 mm wide CC U-channel along the edge of the site is planned to be developed to collect the site surface water and direct it to the drainage system of the township. However the rooftop collected strom water shall be directed to a 1500 mm dia recharge pit through a 200mm pipe.

Parks

Not applicable. However plantation along the south boundary wall is planned.

Tree Planting

Plantation of 3.5 mt high evergreen trees on one side of 12 mt. road at the rate of 6.00 mt C/c.

Design For Electric Supply Including Street Lighting

A 400 KVA connection is proposed to be applied to support 22 nos of SCOs, corridor lighting and outdoor lighting. 6 nos- 6 mt high street light poles with 60W LED are proposed for a general lighting along with the bollard lights

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

A central STP of 400 kld capacity has been provided with the township to take care of sewage treatment plant. This complex shall also be connected to this STP thru existing sewer system.

Solid Waste Management And Disposal System

To be coordinated with the local Municipal authority collection system.

Water Conservation System

All the roof top water shall be collected thru 6 no. 100 dia down pipes and shall be directed to a 1500mm dia recharge pit thru 200mm dia pipe.

Energy Management System Including Use of Renewable Energy

25 percent of the outdoor lights shall have solar backup.

Fire Protection And Fire Safety System

2 nos of fire hydrants have been proposed within the complex connected to supply line

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

All the SCO plots open directly on 12 mt wide road for an easy exit in caser of a fire emergency.

Other Miscellaneous Work

NA

Documents

Registry Document

No: 10016 | Date:

Lease Deed

No: 01 | Date:

Registry Document

No: 2680 | Date:

Sale Deed

No: 8726 | Date:

Extract of Khatauni

No: 1426-1431 | Date:

Extract of Khatauni

No: 1426-1431 | Date:

Extract of Khatauni

No: 1426-1431 | Date:

Extract of Khatauni

No: 1426-1431 | Date:

Extract of Khatauni

No: 1426-1431 | Date:

Registry Document

No: Consortium-1 | Date:

Registry Document

No: Consortium-2 | Date:

Registry Document

No: Undertaking-consortium and leasehold land | Date:

Registry Document

No: Consortium-Agreement-Amendment | Date:

Registry Document

No: Merger Order of Eldeco City | Date:

Registry Document

No: Resumption Land | Date:

Registry Document

No: Certified Copy-2680 | Date:

Registry Document

No: AMALGAMATION INTIMATION TO LDA | Date:

Registry Document

No: Land Area Chart | Date:

Details of Encumbrances

Uploaded: 18-04-2026

Commencement Certificate

Uploaded: 16-03-2026

Proforma of Application Form

Uploaded: 13-03-2026

Proforma of Allotment Letter

Uploaded: 02-04-2026

Proforma of Conveyance Deed

Uploaded: 16-03-2026

Proforma of Completion Certificate(Occupancy)

Uploaded: 16-03-2026

Waste Disposal Plan

Uploaded: 13-03-2026

Water Supply Plan

Uploaded: 13-03-2026

Electricity Supply Plan

Uploaded: 13-03-2026

Development Work Plan

Uploaded: 13-03-2026

Affidavit

Uploaded: 02-04-2026

CA CERTIFICATE

Uploaded: 10-04-2026

ARCHITECT CERTIFICATE

Uploaded: 13-03-2026

ENGINEERS CERTIFICATE

Uploaded: 16-03-2026

Proforma of Agreement for Sale

Uploaded: 02-04-2026

Permits

Orignal Permit NoCommercial Building/18075/LDA/LD/25-26/3630/19012026
Orignal Permit Date19-01-2026
Valid Upto18-01-2031
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto17-01-2034
End Date18-01-2031
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)Ms S.A constructions - Mr. Sarabjeet Singh
Contractor AddressD-2/46-47, 2nd Floor, Shyama Shiv Sqaure, Vibhuti Khand, gomti Nagar, Lucknow
Architect NameMs Espaces - Mr. Sanjay Kumar Gupta
Architect Address108, Eldeco CC-I, Vibhuti Khand, Gomti Nagar, Lucknow-226010
Architect Licence NumberCA/1989/12382
Structural Engineer NameATS Structural Consultants- Er.Akhilesh Kumar Singh
Structural Engineer AddressD-27, Indira Nagra,Lucknow
Mobile number(Project Co-ordinator)9670222298

Land Details

Plot

Showing 1 blocks with 2 units

Property Summary

Total Carpet Area

0.00

0.00 ft²

Total Units

0

1 different types

Blocks & Floors

1

1 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:NaN
Balconies:0
Parking ratio:NaN per unit

Block undefined

2 units

Khasra Details

Total Area

6806.48

73264.24 ft²

7 plots
Khasra
TypeKhasra
Khasra/Plot No305
Area(In Sq. Mt.)3206.667
Khasra
TypeKhasra
Khasra/Plot No241
Area(In Sq. Mt.)373.33
Khasra
TypeKhasra
Khasra/Plot No240
Area(In Sq. Mt.)140
Khasra
TypeKhasra
Khasra/Plot No315
Area(In Sq. Mt.)2506.48
Khasra
TypeKhasra
Khasra/Plot No312
Area(In Sq. Mt.)530
Khasra
TypeKhasra
Khasra/Plot No314
Area(In Sq. Mt.)20
Khasra
TypeKhasra
Khasra/Plot No316
Area(In Sq. Mt.)30

Other Details

Contractor Name (if any)Ms S.A constructions - Mr. Sarabjeet Singh
Contractor AddressD-2/46-47, 2nd Floor, Shyama Shiv Sqaure, Vibhuti Khand, gomti Nagar, Lucknow
Architect NameMs Espaces - Mr. Sanjay Kumar Gupta
Architect Address108, Eldeco CC-I, Vibhuti Khand, Gomti Nagar, Lucknow-226010
Architect Licence NumberCA/1989/12382
Structural Engineer NameATS Structural Consultants- Er.Akhilesh Kumar Singh
Structural Engineer AddressD-27, Indira Nagra,Lucknow
Mobile number(Project Co-ordinator)9670222298