Launch Date
Completion Date
RERA ID
26.939841599436302
80.91341379403961
DEMARCATED AT SITE
CONSTRUCTED
APPROACH ROAD AVAILABLE , 6M. INTERNAL ROAD CONSTRUCTED AS PER APPROVED LAYOUT.
1.2 - 1.5M. WIDE PAVING ALONG INTERNAL ROAD.
UNDERGROUND WATER THROUGH TERRACE TANKS/ U.G. TANK.
MAIN SEWER AVAILABLE CONNECTED TO TOWNSHIP ( ELDECO CITY ) S.T.P.
K.C./ U-DRAINS PROPOSED CONNECTED TO TOWNSHIP ( ELDECO CITY ) DRAINAGE
GREEN AREAS AS PER APPROVED LAYOUT
SHRUBS, GRASS & TREES UPTO6M. HIGH
SUPPLY FROM NEAR BY SUB-STATION AVAILABLE. EFFICIENT STREET LIGHTING
SMALL GYM AND MULTI PURPOSE HALL
TOWNSHIP ( ELDECO CITY ) S.T.P. AVAILABLE
NAGAR NIGAM, LUCKNOW
RAIN WATER HARVESTING ON SITE
50% OF STREET LIGHT TO HAVE SOLAR ENERGY BACK-UP
AS PER FIRE N.O.C. DRAWING
NA
3 NO. FIRE ESCAPE (ONE IN EACH TOWER)
NA
Showing 4 blocks with 102 units
Total Carpet Area
14146.96 m²
152276.46 ft²
Total Units
148
3 different types
Blocks & Floors
4
13 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
15970.00 m²
171899.48 ft²
Processing Time
586 days
From application to approval
19-01-2022
28-08-2023