ONGOINGActive

ELDECO ACCOLADE

GURUGRAM, SOHNA
05-08-2019
Launch Date
ONGOING
Type
2025-06-30
Completion Date

Overview

Launch Date

05-08-2019

Completion Date

2025-06-30

RERA ID

RERA-GRG-247-2019

Basic Details

Project NameELDECO ACCOLADE
Project IDRERA-GRG-247-2019
Project TypeONGOING
Applicant TypeCompany
Submission Date05-08-2019 10:42:14 AM
Builder NameELDECO SOHNA PROJECTS LIMITED
CINU45200HR2006PLC073744
PANXXXX260N
Emailsecretarial@eldecoproperties.com
Websitehttps://www.eldecogroup.com
Phone (Mobile)9811802349
Phone (Landline)01140655000
Registered AddressCORPORATE ADDRESS-201-212, SPLENDOR FORUM, SECOND FLOOR, JASOLA DISTRICT CENTER, NEW DELHI-110025 REGISTERED ADDRESS- S-16, ELDECO STATION-1,SITE NO.1,SECTOR-12, FARIDABAD, HARYANA 121007
Project AddressVILLAGE SOHNA, SECTOR-2, SOHNA
DistrictGURUGRAM
TehsilSOHNA

Bank Details

Bank NameHDFC BANK LTD, JASOLA
Account Number57500000062839
IFSC CodeHDFC0000923
MICR Code110240122
Branch Code923

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Mr. Anil Kumar Dhandha, Address: 36C, Nilgiri-1, Scetor-34, Noida, Uttar Pradesh-201301
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Certificate and Board Resolution Attached

Development Details

Land Area13.216 (Acre)
Proposed FAR174.86
Permissible FAR175
Total Licensed Land13.218 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS6429.018
CONSTRUCTION OF ROADS5974.5
PAVEMENTS4281
PARKS AND PLAYGROUNDS18374.1
GREEN BELTS3233.441
VEHICLE PARKINGS4187.5
ELECTRICITY SUB-STATION0
CLUB HOUSE1378.53
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
NURSERY SCHOOL AND OTHER OPEN AREAS9636.294
Total53494.383

Cost Details

Land Cost15813 Lakhs
Other Cost23875 Lakhs
Estimated Project Cost63521 Lakhs
Estimated Infrastructure Cost5510 Lakhs
Estimated Apartment Construction Cost18323 Lakhs

Documents

DIFFERENTIAL REG FEES

Uploaded on: 14-02-2020

FOURTH QUARTERLY REPORT

Uploaded on: 14-02-2020

RENEWAL OF LICENSE SOHNA

Uploaded on: 14-02-2020

FOREST NOC

Uploaded on: 14-02-2020

AAI NOC

Uploaded on: 14-02-2020

DD-1

Uploaded on: 14-02-2020

ELDECO SOHNA - ACH

Uploaded on: 14-02-2020

ZONING PLAN

Uploaded on: 14-02-2020

LICENSE TRANSFER DTCP

Uploaded on: 14-02-2020

MAPSKO LICENSE

Uploaded on: 14-02-2020

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 14-02-2020

LOI

Uploaded on: 14-02-2020

BOARD RESOLUTION-AUTHORISATION

Uploaded on: 14-02-2020

EC-SOHNA-GURGAON

Uploaded on: 14-02-2020

SITE PLAN

Uploaded on: 14-02-2020

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 14-02-2020

BR III (DTCP APPROVED)

Uploaded on: 14-02-2020

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 14-02-2020

ELECTRICAL SUBMISSION APPROVAL

Uploaded on: 14-02-2020

GIST TERMS ANNEXURE

Uploaded on: 14-02-2020

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 14-02-2020

ENCUMBRANCE DETAILS

Uploaded on: 14-02-2020

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 09-05-2019

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 08-06-2019

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 08-06-2019

SERVICE PLAN ESTIMATES

Uploaded on: 28-09-2020

OCCUPATION CERTIFICATE - ACCOLADE

Uploaded on: 28-09-2020

APPROVED ABSTRACT OF COST

Uploaded on: 28-09-2020

SUBMISSION DRAWING

Uploaded on: 14-02-2020

FIRE SCHEME APPROVAL

Uploaded on: 14-02-2020

DD-2

Uploaded on: 14-02-2020

DEMARCATION PLAN

Uploaded on: 14-02-2020

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 14-02-2020

AFFIDAVIT

Uploaded on: 14-02-2020

SERVICE PLAN ESTIMATES

Uploaded on: 14-02-2020

Statutory Approvals

ROADS AND PAVEMENT PLANDate: 10-10-2019Status: ALREADY BEEN OBTAINED
ELECTRICITY SUPPLY PLANDate: 23-10-2019Status: ALREADY BEEN OBTAINED
WATER SUPPLY PLANDate: 10-10-2019Status: ALREADY BEEN OBTAINED
SEWERAGE AND GARBAGE DISPOSAL PLANDate: 10-10-2019Status: ALREADY BEEN OBTAINED
STORM WATER DRAINAGEDate: 10-10-2019Status: ALREADY BEEN OBTAINED
LAYOUT PLANDate: 05-09-2014Status: ALREADY BEEN OBTAINED
ZONING PLANDate: 10-10-2013Status: ALREADY BEEN OBTAINED
FLOOR PLANDate: 05-09-2014Status: ALREADY BEEN OBTAINED
ELEVATION PLANDate: 05-09-2014Status: ALREADY BEEN OBTAINED
X-SECTION PLANDate: 05-09-2014Status: ALREADY BEEN OBTAINED
LANDSCAPE PLANDate: 05-09-2014Status: ALREADY BEEN OBTAINED
PARKING PLANDate: 05-09-2014Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: Yes
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: No
STREET LIGHTING PLANApproved: Yes
PARKING PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSSUBMITTED TO TOWN & COUNTRY PLANNING
WATER SUPPLY SYSTEMSUBMITTED TO TOWN & COUNTRY PLANNING
STORM WATER DRAINAGESUBMITTED TO TOWN & COUNTRY PLANNING
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALSUBMITTED TO TOWN & COUNTRY PLANNING
STREET LIGHTINGSUBMITTED TO TOWN & COUNTRY PLANNING
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERAS PER PROJECT REPORT
COMMUNITY FACILITIESAS PER PROJECT REPORT
EARTH WORKAS PER PROJECT REPORT
BOUNDARY WALL AND MAIN GATEAS PER PROJECT REPORT
BASEMENT VENTILATIONAS PER PROJECT REPORT
BASEMENT WATER PROOFING AND PROTECTIONAS PER PROJECT REPORT
DG'SAS PER PROJECT REPORT
DG STACKAS PER PROJECT REPORT
HORTICULTURE AND PLANTATIONAS PER PROJECT REPORT
PRAK AREAAS PER PROJECT REPORT
FIRE TENDER PATH WAYAS PER PROJECT REPORT
BIO CONVERTORAS PER PROJECT REPORT
BOOM BARRIERAS PER PROJECT REPORT
SMART ELECTRIC METER SYSTEMAS PER PROJECT REPORT
BASEMENT LED LIGHTINGAS PER PROJECT REPORT
SIGNAGEAS PER PROJECT REPORT
CCTVAS PER PROJECT REPORT
SWIMMING POOLAS PER PROJECT REPORT

NOC

ROADSProvider: PWD HARYANAApproval Status: Approved
WATER SUPPLYProvider: ADMINISTRATION,HUDAApproval Status: Approved
ELECTRICITYProvider: DAKSHIN HARYANA BIJILI VITRAN NIGAM, GURUGRAMApproval Status: Approved
SEWAGE DISPOSALProvider: NOT APPLICABLE FOR OUR PROJECT AS PER SERVICE ESTIMATEApproval Status: Approved
STORM WATER DRAINAGEProvider: NOT APPLICABLE FOR OUR PROJECT AS PER SERVICE ESTIMATEApproval Status: Approved

Project Team

Authorized Representative

RAJEEV KUMAR SINGH
Name
RAJEEV KUMAR SINGH
PAN
XXXX444P
Email
secretarial@eldecoproperties.com
Mobile
9811802349
Landline
01140655000
Address
H.NO.-N-349 Mefield Garden Sector-51 Gurgaon Haryana-12201

Managing Director/CEO

NA
Name
NA
PAN
XXXXLICA
Email
secretarial@eldecoproperties.com
Mobile
0000000000
Landline
0000000000
Address
NA

Directors

PARAG ARVIND GUPTA
Name
PARAG ARVIND GUPTA
PAN
XXXX285E
Email
secretarial@eldecoproperties.com
Mobile
9818682006
Landline
01140655000
Address
Supertech Avant Grade Flat No. 405 Plot no. 1 Sector - 5 Vaishali Uttar Pradesh-201011
SANJAY KUMAR SINGH
Name
SANJAY KUMAR SINGH
PAN
XXXX458G
Email
secretarial@eldecoproperties.com
Mobile
9818682008
Landline
01140655000
Address
E-308 Tower - II Ashiana Orchids Gamma II Greater NOIDA Greater NOIDA 201308 UP IN
NAVEEN KASHYAP
Name
NAVEEN KASHYAP
PAN
XXXX286K
Email
secretarial@eldecoproperties.com
Mobile
9810448439
Landline
01140655000
Address
30571 Top Floor Gali No. 5 South Patel Nagar Delhi - 110008

Contact Details

Project ContactEmail: secretarial@eldecoproperties.comMobile: 9811802349Landline: 01140655000
Project Contact PersonName: ARUN KUMAR SINGHEmail: arun.singh@eldecoproperties.comMobile: 9910482382Landline: 01140655000

Land Details

Land Area13.216 (Acre)
Proposed FAR174.86
Permissible FAR175
Total Licensed Land13.218 (Acre)

Land Usage

Land Cost15813 Lakhs
Other Cost23875 Lakhs
Estimated Project Cost63521 Lakhs
Estimated Infrastructure Cost5510 Lakhs
Estimated Apartment Construction Cost18323 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Street Light35
Shopping area0
Roads & Pavements220
Water Supply System100
Community Facilities0
Storm Water Drainage50
Parks and Playgrounds5
Renewable Energy System10
Electricity Supply System357
Security and fire fighting276
Clubhouse/community centres300
Sewerage treatment & garbage disposal100

Quarterly Infrastructure Expenditure

2019 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Basement Led Lighting----
Basement Ventilation-33-
Basement water proofing and Protection-2-2
Bio convertor----
Boom Barrier----
Boundary wall and main gate-5510
CCTV----
Clubhouse/community centres010814.95
Community facilities----
DG stack----
DG'S----
Earth work-8510
Electricity Supply System0123014.95
Fire tender Path way---10
Horticulture and Plantation--110
Other0000
Parking Area---1
Parks and Playgrounds0000.95
Renewable Energy System0523.6
Roads & Pavements013.5820.72
Security and Fire Fighting04822.95
Sewerage treatment & garbage disposal06109.95
Shopping area0000
Signage----
Smart electric meter system----
Storm Water Drainage05811
Street Lighting0524.95
Swimming Pool---0.85
Water Supply System06.52011.95
2020 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Basement Led Lighting----
Basement Ventilation5352
Basement water proofing and Protection25102
Bio convertor----
Boom Barrier----
Boundary wall and main gate20101.351
CCTV----
Clubhouse/community centres20304060
Community facilities0151515
DG stack---3
DG'S----
Earth work25--
Electricity Supply System40403030
Fire tender Path way1-5-
Horticulture and Plantation14108
Other0000
Parking Area---1
Parks and Playgrounds0000
Renewable Energy System2000
Roads & Pavements15201010
Security and Fire Fighting35273027
Sewerage treatment & garbage disposal10666
Shopping area0000
Signage--2-
Smart electric meter system----
Storm Water Drainage10000
Street Lighting2000
Swimming Pool----
Water Supply System151515.6515
2021 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Basement Led Lighting----
Basement Ventilation4403952
Basement water proofing and Protection5424060
Bio convertor10-5-
Boom Barrier--11
Boundary wall and main gate304028-
CCTV----
Clubhouse/community centres17000
Community facilities15---
DG stack210105
DG'S--3070
Earth work1018--
Electricity Supply System30000
Fire tender Path way1401711
Horticulture and Plantation10102040
Other0000
Parking Area10-40-
Parks and Playgrounds0000
Renewable Energy System0---
Roads & Pavements0000
Security and Fire Fighting30---
Sewerage treatment & garbage disposal6000
Shopping area0000
Signage---2
Smart electric meter system--20-
Storm Water Drainage0000
Street Lighting0---
Swimming Pool---10
Water Supply System0000
2022 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Basement Led Lighting----
Basement Ventilation----
Basement water proofing and Protection6054.655025
Bio convertor7---
Boom Barrier----
Boundary wall and main gate----
CCTV----
Clubhouse/community centres0000
Community facilities----
DG stack----
DG'S5020108
Earth work----
Electricity Supply System0114.8154.496.3
Fire tender Path way41---
Horticulture and Plantation2010.14-6
Other0000
Parking Area507-14
Parks and Playgrounds0000
Renewable Energy System----
Roads & Pavements091215
Security and Fire Fighting---25
Sewerage treatment & garbage disposal0000
Shopping area0000
Signage--4.89-
Smart electric meter system22---
Storm Water Drainage08.64.954.95
Street Lighting----
Swimming Pool-208-
Water Supply System05.855.856
2023 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Basement Led Lighting-368
Basement Ventilation----
Basement water proofing and Protection24.65150.35-
Bio convertor----
Boom Barrier---2
Boundary wall and main gate----
CCTV----
Clubhouse/community centres0000
Community facilities----
DG stack----
DG'S10.28152037
Earth work----
Electricity Supply System94.793.8396.6191.61
Fire tender Path way---30
Horticulture and Plantation-61014
Other0000
Parking Area18-2034
Parks and Playgrounds0000
Renewable Energy System----
Roads & Pavements11.5675151210
Security and Fire Fighting3035.167540.167520.1675
Sewerage treatment & garbage disposal0876
Shopping area0000
Signage----
Smart electric meter system-101014
Storm Water Drainage4.95000
Street Lighting-2.7352.7352.735
Swimming Pool----
Water Supply System5.8591112
2024 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Basement Led Lighting0---
Basement Ventilation----
Basement water proofing and Protection----
Bio convertor----
Boom Barrier----
Boundary wall and main gate----
CCTV07--
Clubhouse/community centres00.100
Community facilities----
DG stack----
DG'S0---
Earth work----
Electricity Supply System0500
Fire tender Path way0---
Horticulture and Plantation----
Other0000
Parking Area0---
Parks and Playgrounds05.7300
Renewable Energy System00.100
Roads & Pavements00.100
Security and Fire Fighting0000
Sewerage treatment & garbage disposal00.0500
Shopping area010.700
Signage-3.1--
Smart electric meter system0---
Storm Water Drainage0000
Street Lighting00.0500
Swimming Pool----
Water Supply System015.600
2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Basement Led Lighting8---
Basement Ventilation----
Basement water proofing and Protection----
Bio convertor----
Boom Barrier----
Boundary wall and main gate----
CCTV1---
Clubhouse/community centres0000
Community facilities----
DG stack----
DG'S20---
Earth work----
Electricity Supply System93.8325000
Fire tender Path way24---
Horticulture and Plantation----
Other0000
Parking Area24.645---
Parks and Playgrounds0000
Renewable Energy System-000
Roads & Pavements7.97000
Security and Fire Fighting62.6375000
Sewerage treatment & garbage disposal3.61000
Shopping area0000
Signage----
Smart electric meter system6---
Storm Water Drainage0000
Street Lighting2.735000
Swimming Pool----
Water Supply System15000

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES / CERAMIC TILES
WALL FINISHING DETAILSTEXTURE PAINT / EMULSION / OIL BOUND DISTEMPER (OBD) / CERAMIC TILES
KITCHEN DETAILSCOUNTER - GRANITE OR EQUIVALENT FITTINGS AND FIXTURES - GOOD QUALITY C.P. FITTINGS, SINGLE BOWL SS SINK WITH DRAIN BOARD
BATHROOM FITTINGSCEILING - FALSE CEILING FITTINGS AND FIXTURES - GOOD QUALITY C.P. FITTINGS, ENGLISH TYPE WC AND WASH BASIN IN WHITE SHADE
WOOD WORK ETCHARD WOOD DOOR FRAME WITH FLUSH SHUTTER
DOORS AND WINDOS FRAMESINTERNAL DOORS - HARD WOOD DOOR FRAME WITH FLUSH SHUTTER IN TEAK FINISH/ PAINT OR SKIN MOULDED DOORS IN ENAMEL PAINT EXTERNAL DOORS/WINDOWS - POWDER COATED/ ANODIZED ALUMINUM / UPVC WITH ALUMINUM / UPVC SHUTTERS AND GLAZING.
GLASS WORKGLASS ON EXTERNAL DOOR/WINDOWS
ELECTRIC FITTINGSGOOD QUALITY MODULAR SWITCHES AND SOCKETS, COPPER WIRING. ( FITTINGS LIKE FANS, GEYSERS, ACS, LIGHT FIXTURES, APPLIANCES ETC. NOT PROVIDED.)
CONDUCTING AND WIRING DETAILSCOPPER / ALUMINUM – AS PER DESIGN
CUPBOARD DETAILSSPACE PROVIDED
WATER STORAGEU.G.T & O.H.T. PROVIDED
LIFT DETAILS2 LIFTS (13 PASSENGERS EACH) IN EACH TOWER
EXTERNAL GLAZINGSPOWDER COATED/ANODIZED ALUMINUM WITH ALUMINUM SHUTTERS AND GLAZING.
WINDOWS/GLAZINGSPOWDER COATED/ANODIZED ALUMINUM WITH ALUMINUM SHUTTERS AND GLAZING.
DOORSHARD WOOD DOOR FRAME WITH FLUSH SHUTTER IN TEAK FINISH/ PAINT OR SKIN MOULDED DOORS IN ENAMEL PAINT
MAIN DOORSHARD WOOD DOOR FRAME WITH FLUSH SHUTTER IN TEAK FINISH/ PAINT OR SKIN MOULDED DOORS IN ENAMEL PAINT
INTERNAL DOORSHARD WOOD DOOR FRAME WITH FLUSH SHUTTER IN TEAK FINISH/ PAINT OR SKIN MOULDED DOORS IN ENAMEL PAINT
AIR CONDITIONINGPROVISION AVAILABLE
ELECTRICAL FITTINGSGOOD QUALITY MODULAR SWITCHES AND SOCKETS, COPPER WIRING. (FITTINGS LIKE FANS, GEYSERS, ACS, LIGHT FIXTURES, APPLIANCES ETC. NOT PROVIDED)
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYAS PER VENDORS SPECIFICATION
EXTERNAL FINISHING/COLOUR SCHEMECOMBINATION OF TEXTURE PAINT / EXTERIOR EMULSION - AS PER DESIGN
INTERNAL FINISHINGOIL BOUND DISTEMPER (OBD)

Unit-wise Specifications

TOILET
FLOORCERAMIC TILES
WALLSCERAMIC TILES /OIL BOUND DISTEMPER (OBD) - AS PER DESIGN
CEILINGFALSE CEILING
COUNTERSMARBLE / GRANITE – AS PER DESIGN
SANITARY WARE/CP FITTINGSGOOD QUALITY C.P. FITTINGS, ENGLISH TYPE WC AND WASH BASIN IN WHITE SHADE
FIXTURESGOOD QUALITY C.P. FITTINGS, ENGLISH TYPE WC AND WASH BASIN IN WHITE SHADE
KITCHEN
FLOORVITRIFIED TILES
WALLSCERAMIC TILES /OIL BOUND DISTEMPER (OBD) - AS PER DESIGN
CEILINGCEMENT PLASTER/GYPSUM PLASTER - AS PER DESIGN
COUNTERSMARBLE / GRANITE – AS PER DESIGN
FIXTURESGOOD QUALITY C.P. FITTINGS
KITCHEN APPLIANCESSINGLE BOWL SS SINK WITH DRAIN BOARD
SIT-OUTS
FLOORNA
WALLS & CEILINGNA
RAILINGSNA
FIXTURESNA
BED ROOMS
FLOORVITRIFIED TILES
WALLSCEMENT PLASTER
CEILINGCEMENT PLASTER
WARDROBESONLY SPACE PROVIDED
MASTER TOILET
FLOORCERAMIC TILES
WALLSCERAMIC TILES / OIL BOUND DISTEMPER (OBD) - AS PER DESIGN
CEILINGFALSE CEILING
COUNTERSMARBLE / GRANITE – AS PER DESIGN
SANITARY WARE/CP FITTINGSGOOD QUALITY C.P. FITTINGS, ENGLISH TYPE WC AND WASH BASIN IN WHITE SHADE
FITTING/FIXTURESGOOD QUALITY C.P. FITTINGS, ENGLISH TYPE WC AND WASH BASIN IN WHITE SHADE
MASTER BEDROOM/DRESSROOM
FLOORVITRIFIED TILES
WALLSCEMENT PLASTER
CEILINGCEMENT PLASTER/GYPSUM PLASTER - AS PER DESIGN
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILES
WALLSCEMENT PLASTER
CEILINGCEMENT PLASTER
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORUTILITY BALCONY - CERAMIC
WALLS & CEILINGUTILITY BALCONY - TEXTURE/ EXTERNAL EMULSION - AS PER DESIGN
TOILETNA
BALCONYFLOOR – CERAMIC TILES WALLS & CEILING- TEXTURE/EXTERNAL EMULSION - AS PER DESIGN

Fee Details

Payment 1
amount:535000
cheque no:6125
draft date:28-07-2017
payable to:HRERA Gurugram
payee bank:HDFC BANK LTD
Payment 2
amount:401000
cheque no:6139
draft date:29-07-2017
payable to:HRERA Gurugram
payee bank:HDFC BANK LTD
Payment 3
amount:657291
cheque no:26671
draft date:30-07-2018
payable to:HRERA Gurugram
payee bank:HDFC BANK LTD