Launch Date
Completion Date
RERA ID
28.588292486290417
77.40543314166412
Demarcation of plot done by Noida Authority
R.C.C. & Brick work structure with MS railing & with Plaster Finish & paint , As Per plan
Tremix flooring over WBM as shown in plan
Ploycrete tiles with granite bend on Border as per plan
water supply through noida jal board , further distribution through overhead tank, underground tank with pumps to individual units
Sewer system is laid inside the plot as per plan dual wastewater /sewer system from individual units thorugh main sewer line
Drain system with RCC NP2 pipes connected to rain water harvesting pit excess rain water disposed in authority drain
No parks are planned green area above basement roof planned
As per horticulture plan approved by authority
Electrical supply as per applicable norms
Club building Proposed
Sewage will be treated through 880 kld sewage treatment plant , excess treated water is disposed in authority drain, Rest used in flushing water & horticulture ,Drainage As above . Currently due to partial load only 400 KLD plant is operational
Door to Door /Garbage chute collection is planned ,Garbage will be collected in garbage room from there non biodegradable waste given to authorized vendor for recycling & biodegradable waste will be treated in compost machine and this compost will be used in horticulture work .
Rain harvesting pits are planned (as required ), Also treated water system is used in toilet flush and horticulture
Solar heaters and solar photovoltaic are planned on roof to compensate 50% load of street light
Fire fighting system planned as per fire scheme approval
NA
As per Fire Scheme
NA
Showing 5 blocks with 397 units
Total Carpet Area
41019.47 m²
441529.47 ft²
Total Units
614
4 different types
Blocks & Floors
5
25 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
58330.65 m²
627865.28 ft²
Processing Time
646 days
From application to approval
15-09-2021
23-06-2023