NEWActive

ELAN THE STATEMENT

GURUGRAM, GURGAON
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
14-11-2025
Launch Date
NEW
Type
2033-09-30
Completion Date

Overview

Launch Date

14-11-2025

Completion Date

2033-09-30

Configurations

4 BHK

Sizes

4285 - 7395 sq.ft.

Project Size

5 Buildings - 360 units

Total Floors

36

Launch Price

23900 /sq.ft

RERA ID

RERA-GRG-2069-2025

Basic Details

Project NameELAN THE STATEMENT
Project IDRERA-GRG-2069-2025
Project TypeNEW
Applicant TypeCompany
Submission Date14-11-2025 03:11:12 PM
Builder NameELAN ENCLAVE PRIVATE LIMITED
CINU70109HR2021PTC099477
PANXXXX780E
Emailelancoordination@elanlimited.com
WebsiteHttps://elanlimited.com
Phone (Mobile)9311134842
Phone (Landline)1244101100
Registered Address15TH FLOOR,TWO HORIZON CENTER DLF PHASE V SECTOR43,GOLF COURSE ROAD, GURGAON, GURUGRAM, HARYANA, INDIA,122002
Project AddressSECTOR 49, GURUGRAM
DistrictGURUGRAM
TehsilGURGAON

Location

Elan The Statement Sector 49 Location
Elan The Statement Sector 49 Location

Layout

Loading
Elan The Statement Masterplan
Elan The Statement Masterplan

Payment Plans

Loading
Elan The Statement Payment Plan
Elan The Statement Payment Plan

Floor Plan

Loading
Configuration
Super Area
Unit Details
Carpet Area
2586 sq.ft
Built Up Area
3006 sq.ft
Carpet Efficiency
60%
Built Up Efficiency
70%
Parkings
2

Brochures

Loading

Walkthrough

Loading

Bank Details

Bank NameINDUSIND BANK LTD, DR. GOPAL DAS BHAWAN, 28 BARAKHAMBA ROAD, NEW DELHI - 110001
Account Number256000500096
IFSC CodeINDB0000005
MICR Code110234002
Branch Code000005

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Mr. Akash Kapoor and Mr. Ravish Kapoor both R/o - 1910A, The Magnolias, Golf Course Road, Sector 42, Gurgaon, Haryana 122009, and Gaurav Khandelwal R/o- 65-A, Bank Colony, Madhuvan, Alwar, Rajashthan 301001
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)YES

Development Details

Land Area5.875 (Acre)
Proposed FAR4.825
Permissible FAR5.12
Total Licensed Land5.875 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.7472
CONSTRUCTION OF ROADS1.265
PAVEMENTS0.440
PARKS AND PLAYGROUNDS0.5518
GREEN BELTS0.832
VEHICLE PARKINGS0.096
ELECTRICITY SUB-STATION0.074
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0.114
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
WATER0.326
STORM0.496
STREET0.049
ELECTRICITY0.247
SECURITY0.096
RENEWABLE0.148
UNDERGROUND0.213
RAIN0.037
STP0.143
Total5.875

Cost Details

Land Cost142486.9 Lakhs
Other Cost50768.44 Lakhs
Estimated Project Cost279015.2 Lakhs
Estimated Infrastructure Cost5230 Lakhs
Estimated Apartment Construction Cost80529.86 Lakhs

Documents

NEC

Uploaded on: 21-09-2025

ELECTRICAL LOAD

Uploaded on: 21-09-2025

JAMABANDI

Uploaded on: 21-09-2025

COLLABORATION AGREEMENT

Uploaded on: 21-09-2025

ASSURANCE OF SEWERAGE CONNECTION

Uploaded on: 21-09-2025

AKS SHIJRA

Uploaded on: 21-09-2025

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 21-09-2025

MUTATION

Uploaded on: 21-09-2025

ASSURANCE OF STORM WATER

Uploaded on: 21-09-2025

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 21-09-2025

HUDA CONSTRUCTION WATER NOC

Uploaded on: 21-09-2025

LC-IV

Uploaded on: 21-09-2025

ASSURANCE OF WATER SUPPLY

Uploaded on: 21-09-2025

FOREST NOC

Uploaded on: 21-09-2025

LOI

Uploaded on: 21-09-2025

AAI NOC

Uploaded on: 21-09-2025

ROAD ACCESS PERMISSION

Uploaded on: 07-11-2025

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 08-12-2025

TREE CUTTING

Uploaded on: 12-11-2025

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 14-11-2025

ZONING PLAN

Uploaded on: 14-11-2025

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 14-11-2025

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 08-12-2025

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 14-11-2025

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 08-12-2025

DEMARCATION PLAN

Uploaded on: 08-12-2025

A-T5-03 TOWER-5 1ST LVL LAYOUT & AREA_COMPRESSED

Uploaded on: 17-12-2025

SITE PLAN SEWERAGE SCHEME

Uploaded on: 17-12-2025

BASEMENT 3

Uploaded on: 17-12-2025

A-T4-04 TOWER-4 TYPICAL LVL LAYOUT (LEVEL 2ND TO 15,17,23,25,32 & 34 TO 37 FLOOR & AREA DETAIL_COMPRESSED

Uploaded on: 17-12-2025

EWS-02 EWS 10 TO 16 FLOOR PLANS & AREA_COMPRESSED

Uploaded on: 18-12-2025

A-T4-01 TOWER-4 GF LVL AREA DEATIL_COMPRESSED

Uploaded on: 17-12-2025

30 ALLOTMENT LETTER ELAN THE STATMENT

Uploaded on: 17-12-2025

ELE-01 TOWER 1,2,3 & 5 ELEVATION 1 & 2_COMPRESSED

Uploaded on: 18-12-2025

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 09-12-2025

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 09-12-2025

BBA ELAN THE STATMENT

Uploaded on: 17-12-2025

APPLIED SERVICE PLAN ESTIMATE

Uploaded on: 17-12-2025

A-T2-01 TOWER-2 & CONVENIENT SHOPPING GF

Uploaded on: 17-12-2025

A-T3-03 TOWER-3 1ST LVL LAYOUT & AREA_COMPRESSED

Uploaded on: 17-12-2025

A-T3-09 TOWER-3 UNIT CARPET AREA_COMPRESSED

Uploaded on: 17-12-2025

A-T4-09 TOWER-4 UNIT CARPET AREA_COMPRESSED

Uploaded on: 17-12-2025

A-T4-03 TOWER-4 (LEVEL-1ST) & AREA DETAIL_COMPRESSED

Uploaded on: 17-12-2025

SEC-01- TOWER 1,2,3,&5 SECTION A&B_COMPRESSED

Uploaded on: 17-12-2025

A-T2-05 TOWER-2 16,24,33, LVL PLAN (REFUGE FLOOR)_COMPRESSED

Uploaded on: 17-12-2025

SITE DRAINAGE PLAN

Uploaded on: 17-12-2025

COMMUNITY BUILDING PLAN 2

Uploaded on: 17-12-2025

A-T2-07 TOWER-2 PENTHOUSE LVL-2 LAYOUT (LEVEL 39TH FLOOR)_COMPRESSED

Uploaded on: 17-12-2025

A-T5-08 TOWER-5 TERRACE PLAN, MUMTY, MACHINE ROOM PLAN & AREA_COMPRESSED

Uploaded on: 17-12-2025

A-T3-01 TOWER-3 & CONVENIENT SHOPPING GF LVL AREA_COMPRESSED

Uploaded on: 17-12-2025

D-04- COMMUNITY BUILDING GF LVL AREA_COMPRESSED

Uploaded on: 17-12-2025

A-T3-08 TOWER-3 TERRACE LVL PLAN, MUMTY,MACHINE ROOM PLAN & AREA_COMPRESSED

Uploaded on: 18-12-2025

ELE-02 TOWER-4 ELEVATION 1 & 2_COMPRESSED

Uploaded on: 18-12-2025

EWS-01- EWS 1ST FLOOR TO 9TH FLOOR PLAN & AREA_COMPRESSED

Uploaded on: 17-12-2025

A-T1-09 TOWER-1 UNIT CARPET AREA_COMPRESSED

Uploaded on: 17-12-2025

BANK UNDERTAKING ELAN THE STATEMENT

Uploaded on: 17-12-2025

29 4(2)(L)(D)

Uploaded on: 17-12-2025

A-T3-04 TOWER-4 TYPICAL LVL LAYOUT (LEVEL 2ND TO 15TH,17 TO 23, 25 TO 32 & 34 TO 37 FLOOR)_COMPRESSED

Uploaded on: 17-12-2025

A-T5-01 TOWER-5 LVL GF AREA

Uploaded on: 17-12-2025

A-T2-04 TOWER-2 TYPICAL LVL LAYOUT (LEVEL-2ND TO 15,17,TO 23,25 TO 32 & 34 TO 37 FLOOR)_COMPRESSED

Uploaded on: 17-12-2025

D-07B-COMMUNITY BUILDING SECTIONB_COMPRESSED

Uploaded on: 17-12-2025

A-T4-05 TOWER-4 16,24 & 33 LVL PLAN (REFUGE FLOOR) & AREA_COMPRESSED

Uploaded on: 17-12-2025

A-T1-06 TOWER-1 PENTHOUSE LVL-1 LAYOUT (LEVEL 38TH FLOOR)_COMPRESSED

Uploaded on: 17-12-2025

A-T1-08 TOWER-1 TERRACE LVL PLAN, MUMTY, MACHINE ROOM PLAN_COMPRESSED

Uploaded on: 17-12-2025

A-T4-06 TOWER-4 PENTHOUSE LVL-1 LAYOUT (LEVEL-38TH FLOOR) & AREA_COMPRESSED

Uploaded on: 17-12-2025

EWS-03 EWS 17 TO 20 AND MUMTY & TERRACE PLANS & AREA_COMPRESSED

Uploaded on: 17-12-2025

A-T1-03. TOWER 1 1ST LVL LAYOUT & AREA DETAIL_COMPRESSED

Uploaded on: 17-12-2025

A-T2-02 TOWER 3&4 GROUND COVERAGE AREA_COMPRESSED

Uploaded on: 17-12-2025

A-T5-02 TOWER-5 GROUND COVERAGE AREA

Uploaded on: 17-12-2025

SITE PLAN ROAD SCHEME

Uploaded on: 17-12-2025

A-T1-07. TOWER-1 PENTHOUSE LVL-2 LAYOUT (LEVEL 39TH FLOOR)_COMPRESSED

Uploaded on: 17-12-2025

NO LITIGATION PENDING

Uploaded on: 17-12-2025

EC SUBMISSION - 27-12-24

Uploaded on: 17-12-2025

A-T2-09 TOWER-2 UNIT CARPET AREA_COMPRESSED

Uploaded on: 17-12-2025

A-T2-06 TOWER-2 PENTHOUSE LVL-1 LAYOUT (LEVEL 38TH FLOOR) & AREA_COMPRESSED

Uploaded on: 17-12-2025

BA-04-2ND BASEMENT PLAN AREA DIAGRAM_COMPRESSED

Uploaded on: 17-12-2025

A-T4-07 TOWER-4 PENTHOUSE LVL-2 LAYOUT (LEVEL 39TH FLOOR) & AREA_COMPRESSED

Uploaded on: 17-12-2025

A-T4-08 TOWER-4 TERRACE LVL PLAN, MUMTY, MACHINE ROOM PLAN & AREA_COMPRESSED

Uploaded on: 17-12-2025

APPLIED FIRE

Uploaded on: 17-12-2025

SITE PLAN FLUSHING WATER SUPPLY SCHEME

Uploaded on: 17-12-2025

A-T1-05. TOWER-1 16,24,33 LVL PLAN (REFUGE FLOOR) & AREA_COMPRESSED

Uploaded on: 17-12-2025

A-T2-03 TOWER-2 1ST LVL LAYOUT & AREA DETAIL_COMPRESSED

Uploaded on: 17-12-2025

A-T2-08 TOWER-2 TERRACE LVL PLAN, MUMTY, MACHINE ROOM PLAN & AREA_COMPRESSED

Uploaded on: 17-12-2025

A-T5-06 TOWER-5 PENTHOUSE LVL-1 LAYOUT (LEVEL-38TH FLOOR) & AREA_COMPRESSED

Uploaded on: 17-12-2025

A-T3-05 TOWER-3 16,24, & 33 LVL PLAN (REFUGE FLOOR) & AREA_COMPRESSED

Uploaded on: 17-12-2025

A-T3-06 TOWER-3 PENTHOUSE LVL-1, LAYOUT (LEVEL-38TH FLOOR) & AREA_COMPRESSED

Uploaded on: 17-12-2025

A-T5-09 TOWER-5 UNIT CARPET AREA_COMPRESSED

Uploaded on: 17-12-2025

A-T3-07 TOWER-3 PENTHOUSE LVL-2, LAYOUT (LEVEL-39TH FLOOR) & AREA_COMPRESSED

Uploaded on: 17-12-2025

NO SALE SFFIDAVIT BY VA AGRICULTURE

Uploaded on: 17-12-2025

A-T5-05 TOWER-5 16,24&33; LVL PLAN (REFUGE FLOOR) & AREA_COMPRESSED

Uploaded on: 17-12-2025

A-T5-07 TOWER-5 PENTHOUSE LVL-2 LAYOUT (LEVEL 39TH FLOOR) & AREA_COMPRESSED

Uploaded on: 17-12-2025

D-05-COMMUNITY BUILDING 1ST FLOOR & TERRACE LVL AREA_COMPRESSED

Uploaded on: 17-12-2025

D-06 COMMUNITY BUILDING ELEVATIONS_COMPRESSED

Uploaded on: 17-12-2025

D-07B COMMUNITY BUILDING SECTIONB_COMPRESSED

Uploaded on: 17-12-2025

EWS-04- EWS SECTIONS X & Y_COMPRESSED

Uploaded on: 17-12-2025

NO SALE SFFIDAVIT BY ELAN ENCLAVE

Uploaded on: 17-12-2025

SEC-02 TOWER-4 SECTION A&B_COMPRESSED

Uploaded on: 17-12-2025

SITE PLAN DOMESTIC WATER SUPPLY SCHEME

Uploaded on: 17-12-2025

SITE PLAN EXTERNAL FIRE HYDRANT SCHEME

Uploaded on: 17-12-2025

Statutory Approvals

ZONNINGDate: 21-11-2025Status: ALREADY BEEN OBTAINED
LOIDate: 08-02-2019Status: ALREADY BEEN OBTAINED
AAI NOCDate: 14-10-2024Status: ALREADY BEEN OBTAINED
ELECTRICAL LOADDate: 13-12-2024Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 27-10-2016Status: ALREADY BEEN OBTAINED
ASSURANCE OF WATER SUPPLYDate: 10-12-2024Status: ALREADY BEEN OBTAINED
ASSURANCE OF STORM WATERDate: 10-12-2024Status: ALREADY BEEN OBTAINED
ASSURANCE OF SEWERAGE CONNECTIONDate: 10-12-2024Status: ALREADY BEEN OBTAINED
HUDA CONSTRUCTION WATER NOCDate: 13-03-2025Status: ALREADY BEEN OBTAINED
BR-IIIDate: 21-11-2025Status: ALREADY BEEN OBTAINED
LICENSEDate: 07-03-2019Status: ALREADY BEEN OBTAINED
SERVICE PLAN AND ESTIMATE APPROVALDate: 25-11-2025Status: APPLIED FOR BUT YET TO RECEIVE
FIRE FIGHTING SCHEME APPROVALDate: 07-11-2025Status: APPLIED FOR BUT YET TO RECEIVE
ENVIRONMENT CLEARANCE APPROVALDate: 27-12-2024Status: APPLIED FOR BUT YET TO RECEIVE
Lay out PlanApproved: No
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED
STPAS PER PROJECT REPORT
UNDERGROUND WATER TANKAS PER PROJECT REPORT
RAIN WATER HARVESTINGAS PER PROJECT REPORT
ELECTRICAL SUB STATIONAS PER PROJECT REPORT

NOC

ROADSProvider: NHAIApproval Status: Approved
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

GAURAV KHANDELWAL
Name
GAURAV KHANDELWAL
PAN
XXXX203L
Email
gaurav.khandelwal@elanlimited.com
Mobile
9582727222
Landline
1244101100
Address
65-A Bank Colony Madhuvan Alwar Rajashthan 301001

Managing Director/CEO

RAVISH KAPOOR
Name
RAVISH KAPOOR
PAN
XXXX912R
Email
ravish@elanlimited.com
Mobile
9810008075
Landline
1244101100
Address
1901A The Magnolias Golf Course Road Sector-42 Gurugram Haryana 122009

Directors

AKASH KAPOOR
Name
AKASH KAPOOR
PAN
XXXX282G
Email
akash@elanlimited.com
Mobile
9810008242
Landline
1244101100
Address
1901A The Magnolias Golf Course Road Sector-42 Gurugram Haryana 122009
GAURAV KHANDELWAL
Name
GAURAV KHANDELWAL
PAN
XXXX203L
Email
gaurav.khandelwal@elanlimited.com
Mobile
9582727222
Landline
1244101100
Address
65-A Bank Colony Madhuvan Alwar Rajashthan 301001

Contact Details

Project ContactEmail: elancoordination@elanlimited.comMobile: 9623725675Landline: 1244101100
Project Contact PersonName: MR AJAY CHANDRASHEKHAREmail: Ajay@elanlimited.comMobile: 9623725675Landline: 1244101100

Land Details

Land Area5.875 (Acre)
Proposed FAR4.825
Permissible FAR5.12
Total Licensed Land5.875 (Acre)

Land Usage

Land Cost142486.9 Lakhs
Other Cost50768.44 Lakhs
Estimated Project Cost279015.2 Lakhs
Estimated Infrastructure Cost5230 Lakhs
Estimated Apartment Construction Cost80529.86 Lakhs

Total Infrastructure Expenditure

Infrastructure Total Expenditure

No total expenditure data is currently available for this project.

Quarterly Infrastructure Expenditure

2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical sub station----
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Rain water harvesting----
Renewable energy system----
Roads & Pavements25252525
STP-111111
Security and fire fighting---87.5
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Lighting----
Underground water tank-666
Water Supply System00040
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical sub station----
Electricity Supply System20202020
Other0000
Parks and Playgrounds15151515
Rain water harvesting2.52.52.52.5
Renewable energy system2222
Roads & Pavements25252525
STP11111111
Security and fire fighting87.587.587.587.5
Sewerage treatment & garbage disposal5555
Shopping area0000
Storm Water Drainage11.511.52323
Street Lighting6666
Underground water tank6666
Water Supply System40404080
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical sub station-606060
Electricity Supply System40404040
Other0000
Parks and Playgrounds30303030
Rain water harvesting5555
Renewable energy system4444
Roads & Pavements25255050
STP11111122
Security and fire fighting87.5175175175
Sewerage treatment & garbage disposal10101010
Shopping area0000
Storm Water Drainage23232323
Street Lighting12121212
Underground water tank66612
Water Supply System80808080
2030 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical sub station606060120
Electricity Supply System40404040
Other0000
Parks and Playgrounds30303030
Rain water harvesting5555
Renewable energy system4444
Roads & Pavements5050500
STP22222222
Security and fire fighting175175175175
Sewerage treatment & garbage disposal10101010
Shopping area0000
Storm Water Drainage2323230
Street Lighting12121212
Underground water tank12121212
Water Supply System8080800
2031 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0---
Electrical sub station120---
Electricity Supply System0---
Other0---
Parks and Playgrounds0---
Rain water harvesting----
Renewable energy system----
Roads & Pavements0---
STP----
Security and fire fighting----
Sewerage treatment & garbage disposal0---
Shopping area0---
Storm Water Drainage0---
Street Lighting----
Underground water tank----
Water Supply System0---

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEMARBLE, ENGINEERED WOODEN FLOORING,VITRIFIED TILE, EPOXY PAINT FLOORING
WALL FINISHING DETAILSVITRIFIED TILE
KITCHEN DETAILSVITRIFIED TILE, PREMIUM GRADE ACRYLIC EMULSION, FULL HEIGHT WINDOWS- ALUMINIUM POWDERCOATED SECTIONS
BATHROOM FITTINGSVITRIFIED TILE
WOOD WORK ETCNO
DOORS AND WINDOS FRAMESFULL HEIGHT WINDOWS- ALUMINIUM PODERCOATED SECTIONS AND WOODEN FRAME WITHFLUSH DOOR WITH VENEER FINISH (ON BOTHSIDES) & ARCHITRAVES
GLASS WORKFULL HEIGHT WINDOWS- ALUMINIUM PODERCOATED SECTIONS
ELECTRIC FITTINGSLED, SWITCH BOARD-MODULER, CONDUIT-HEAVY DUTY
CONDUCTING AND WIRING DETAILSHEAVY DUTY , MODULAR
CUPBOARD DETAILSNA
WATER STORAGEYES
LIFT DETAILSNA
EXTERNAL GLAZINGSEXTRANL GRADE TEXTURE PAINT
WINDOWS/GLAZINGSFULL HEIGHT WINDOWS- ALUMINIUM PODERCOATED SECTIONS
DOORSWOODEN FRAME WITH FLUSH DOOR WITH LAMINATE FINISH (ON BOTH SIDES) & ARCHITRAVES
MAIN DOORSWOODEN FRAME WITH FLUSH DOOR WITH VENEER FINISH (ON BOTH SIDES) & ARCHITRAVES
INTERNAL DOORSWOODEN FRAME WITH FLUSH DOOR WITH LAMINATE FINISH (ON BOTH SIDES) & ARCHITRAVES
AIR CONDITIONINGVARIABLE RATE FLOW SYSTEM
ELECTRICAL FITTINGSHEAVY DUTY CONDUTING MODULAR SWITCHES,C CURVE MCB
CNG PIPE LINEYES
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE TEXTURE PAINT
INTERNAL FINISHINGPREMIUM GRADE ACRYLIC EMULSION

Unit-wise Specifications

TOILET
FLOORVITRIFIED TILES
WALLSPREMIUM ACRYLIC DISTEMPER EMULSION
CEILINGPREMIUM ACRYLIC DISTEMPER EMULSION
COUNTERSSINGLE LEVER COUNTER TOP
SANITARY WARE/CP FITTINGSSINGLE LEVER COUNTER TOP
FIXTURESSINGLE LEVER COUNTER TOP
KITCHEN
FLOORVITRIFIED TILE
WALLSPREMIUM ACRYLIC EMULSION
CEILINGPREMIUM ACRYLIC EMULSION
COUNTERSSINGLE LEVER COUNTER TOP
FIXTURESSINGLE LEVER COUNTER TOP
KITCHEN APPLIANCESSINGLE LEVER COUNTER TOP
SIT-OUTS
FLOORVITRIFIED TILES
WALLS & CEILINGPREMIUM ACRYLIC EMULSION
RAILINGSALUMINIUM POWDER COATING
FIXTURESNA
BED ROOMS
FLOORENGINEERED WOODEN FLOORING
WALLSPREMIUM GRADE ACRYLIC EMULSION
CEILINGPREMIUM GRADE ACRYLIC EMULSION
WARDROBESNO
MASTER TOILET
FLOORMARBLE/ VITRIFIED TILES
WALLSMARBLE
CEILINGPREMIUM ACRYLIC DISTEMPER
COUNTERSSINGLE LEVER COUNTER TOP
SANITARY WARE/CP FITTINGSSINGLE LEVER COUNTER TOP
FITTING/FIXTURESSINGLE LEVER COUNTER TOP
MASTER BEDROOM/DRESSROOM
FLOORLAMINATE WOODEN FLOORING MARBLE
WALLSPREMIUM GRADE ACRYLIC EMULSION
CEILINGPREMIUM GRADE ACRYLIC EMULSION
MODULAR WARDROBESNO
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORPREMIUM GRADE ACRYLIC EMULSION
WALLSPREMIUM GRADE ACRYLIC EMULSION
CEILINGPREMIUM GRADE ACRYLIC EMULSION
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORVITRIFIED TILES
WALLS & CEILINGOBD
TOILETVITRIFIED TILE, PREMIUM ACRYLIC DISTEMPER EMULSION
BALCONYPREMIUM ACRYLIC EMULSION

Fee Details

Payment 1
amount:6325011
cheque no:40490
draft date:01-12-2025
payable to:HRERA Gurugram
payee bank:HDFC BANK
Payment 2
amount:704200
cheque no:40430
draft date:14-11-2025
payable to:HRERA Gurugram
payee bank:HDFC BANK