Launch Date
Completion Date
RERA ID
26.801592
81.026383
2.5 mt. high and 230 mm thick Boundary wall along with RCC columns to strengthen it has been proposed to be constructed along with entry gate complex.
Complete CC internal road along with paver pathways is proposed to be constructed as per CPWD specifications for required load and width. Roads shall have some patterns using granite pavers at junctions and BLOCK entry points.
All internal roads to have 0.75m wide footpath in 40- 60 mm thick concrete/granite pavers or equivalent finishes.
underground water to be supplied through terrace tank.
Centralized Sewerage system as per design shall be Provided. All Sewerage disposal shall be go to the STP for treatment and treated ,recycled water shall be used for gardening and complex washing. overflow from the STP shall be connected to the Municipal sewerage system.
Storm water system as per design shall be Provided. Storm water from terrace tops, Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pits to recharge the Ground water and overflow shall be connected to Municipal drainage on main 45 mt. road.
Highly enriched green parks with grass cover and plantation/shrubs have been proposed on approved location. Facilities like open Gym and children play equipments to be part of green areas.
"There are 5 type of trees proposed at site: which are kachnar, gulmauhar, amaltas, kusum and neem."
A well designed electricity distribution system, as per norms of electricity Board, will be in place along with centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting,STP,Pump room etc. 20% street lighting shall have solar panel.
Club Building With Basic Recreational Facilities Like Gym, Library And Common Room And Pool Facility. The Said Facility Will Be Shared By The Allottees Of Phase 2 Also.
Centralized Sewerage system shall be Provided. All Sewerage disposal shall be go to the STP for treatment and after treatment ,water shall be recycled and will used in gardening, washing and flushing system . Overflow from the STP shall be connected with the Municipal sewerage system.
"Proper garbage disposal/collection point has been proposed. Nagar Nigam to collect garbage from this point for the solid waste management."
A well designed rain water harvesting system has been planned along with 6 no. recharge pits for the whole building complex to conserve water. Rain water from internal roads, roof tops and gardens shall be directed towards recharge pits through drain channels and pipes.
We will use LED light fittings in external and common areas as well as 20% solar street lights. In STP and Pump room all the equipment shall have energy efficient motors/pumps.
Since the building is less than 45m in height all the fire norms shall be followed as NBC with the approval of fire department. A dedicated pipe line along with hydrants will be connected to wet risers. Terrace tanks shall have separate storage facility to store water for fire fighting.
A creche for the children of labors during construction period with play and study facility. Temporary toilets for workers during construction period and emergency medical kit.
Exits from each and every point has been planned and proposed as per norms in case of emergency.
N.A.
Showing 3 blocks with 26 units
Total Carpet Area
17687.64 m²
190387.99 ft²
Total Units
108
2 different types
Blocks & Floors
3
12 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
9813.54 m²
105631.96 ft²