NewActive

Eiffel Vivassa Estate Phase 2

Lucknow, Uttar Pradesh
01-07-2019
Launch Date
New
Type
24-06-2026
Completion Date

Overview

Launch Date

01-07-2019

Completion Date

24-06-2026

RERA ID

UPRERAPRJ929171

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)9624
Project NameEiffel Vivassa Estate Phase 2
Registration Fee (in Rs.)53500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)84
DistrictLucknow
Original Start Date-
TehsilMohanlalganj
Proposed Start Date01-07-2019
Sanctioning Competent AuthorityLucknow Development Authority
Project Cost (in Lacs)7072
Proposed Completion Date24-06-2026

Location

Latitude

26.801592

Longitude

81.026383

Bank Details

Account no.059105002847
Name Of Account HolderEIFFEL INFRADEVELOPERS PRIVATE LIMITED PHASE-2 RERA RETENTION ACCOUNT
Bank NameICICI Bank
Branch AddressIndranagar, Lucknow
Branch NameIndranagar, Lucknow
IFSC CodeICIC0000591

Development Works

Boundary Wall

2.5 mt. high and 230 mm thick Boundary wall along with RCC columns to strengthen it has been proposed to be constructed along with entry gate complex.

Road Work

Complete CC internal road along with paver pathways is proposed to be constructed as per CPWD specifications for required load and width. Roads shall have some patterns using granite pavers at junctions and BLOCK entry points.

Footpaths

All internal roads to have 0.75m wide footpath in 40- 60 mm thick concrete/granite pavers or equivalent finishes.

Water Supply Including Drinking Water Facilities

underground water to be supplied through terrace tank.

Sewer System

Centralized Sewerage system as per design shall be Provided. All Sewerage disposal shall be go to the STP for treatment and treated ,recycled water shall be used for gardening and complex washing. overflow from the STP shall be connected to the Municipal sewerage system.

Drain

Storm water system as per design shall be Provided. Storm water from terrace tops, Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pits to recharge the Ground water and overflow shall be connected to Municipal drainage on main 45 mt. road.

Parks

Highly enriched green parks with grass cover and plantation/shrubs have been proposed on approved location. Facilities like open Gym and children play equipments to be part of green areas.

Tree Planting

"There are 5 type of trees proposed at site: which are kachnar, gulmauhar, amaltas, kusum and neem."

Design For Electric Supply Including Street Lighting

A well designed electricity distribution system, as per norms of electricity Board, will be in place along with centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting,STP,Pump room etc. 20% street lighting shall have solar panel.

Community Buildings

Club Building With Basic Recreational Facilities Like Gym, Library And Common Room And Pool Facility. The Said Facility Will Be Shared By The Allottees Of Phase 2 Also.

Treatment and Disposal System of Sewage and Sullage water

Centralized Sewerage system shall be Provided. All Sewerage disposal shall be go to the STP for treatment and after treatment ,water shall be recycled and will used in gardening, washing and flushing system . Overflow from the STP shall be connected with the Municipal sewerage system.

Solid Waste Management And Disposal System

"Proper garbage disposal/collection point has been proposed. Nagar Nigam to collect garbage from this point for the solid waste management."

Water Conservation System

A well designed rain water harvesting system has been planned along with 6 no. recharge pits for the whole building complex to conserve water. Rain water from internal roads, roof tops and gardens shall be directed towards recharge pits through drain channels and pipes.

Energy Management System Including Use of Renewable Energy

We will use LED light fittings in external and common areas as well as 20% solar street lights. In STP and Pump room all the equipment shall have energy efficient motors/pumps.

Fire Protection And Fire Safety System

Since the building is less than 45m in height all the fire norms shall be followed as NBC with the approval of fire department. A dedicated pipe line along with hydrants will be connected to wet risers. Terrace tanks shall have separate storage facility to store water for fire fighting.

Social Infrastructure And Other Public Amenities Including Public Health Services

A creche for the children of labors during construction period with play and study facility. Temporary toilets for workers during construction period and emergency medical kit.

Emergency Evacuation Services

Exits from each and every point has been planned and proposed as per norms in case of emergency.

Other Miscellaneous Work

N.A.

Documents

Sale Deed

No: 18456 | Date: 08-10-2018

Sale Deed

No: 6279 | Date: 27-03-2019

Sale Deed

No: 12015 | Date: 29-06-2018

Sale Deed

No: 9932 | Date: 29-05-2018

Sale Deed

No: 517 | Date: 11-01-2018

Sale Deed

No: 15002 | Date: 08-11-2017

Sale Deed

No: 11764 | Date: 11-09-2017

Sale Deed

No: 11039 | Date: 29-08-2017

Sale Deed

No: 11040 | Date: 28-08-2017

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 02-08-2019

Commencement Certificate

Uploaded: 02-08-2019

Other Plan(If Any)

Uploaded: 02-08-2019

Proforma of Application Form

Uploaded: 06-08-2019

Proforma of Allotment Letter

Uploaded: 22-08-2019

Proforma of Conveyance Deed

Uploaded: 22-08-2019

Waste Disposal Plan

Uploaded: 02-08-2019

Water Supply Plan

Uploaded: 02-08-2019

Electricity Supply Plan

Uploaded: 22-08-2019

Development Work Plan

Uploaded: 02-08-2019

Affidavit

Uploaded: 02-08-2019

CA CERTIFICATE

Uploaded: 22-08-2019

ARCHITECT CERTIFICATE

Uploaded: 02-08-2019

ENGINEERS CERTIFICATE

Uploaded: 02-08-2019

Permits

Orignal Permit NoMAP 20180719104540210
Orignal Permit Date16-03-2019
Valid Upto15-03-2024
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto15-03-2024
End Date25-12-2025
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit NoMAP 20180719104540210
Orignal Permit Date16-03-2019
Valid Upto15-03-2024
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto15-03-2027
End Date24-06-2026
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)SN Tiwari
Contractor AddressPrabha Enterprises 182-C, Eldeco Udyan-1, Bangla Bazzar Lucknow 226002
Architect NameSanjay Kumar Gupta
Architect AddressVibhuti Khand, Lucknow
Architect Licence NumberCA/89/12382
Structural Engineer NameAkhilesh Kr. Singh
Structural Engineer AddressD 27 Indra Nagar Lucknow
Mobile number(Project Co-ordinator)7317000856

Land Details

AFS

Showing 3 blocks with 26 units

Property Summary

Total Carpet Area

17687.64

190387.99 ft²

Total Units

108

2 different types

Blocks & Floors

3

12 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:163.77
Balconies:72
Parking ratio:0.00 per unit

Block Cosmic

2 units

Block REGAL-1

12 units

Block REGAL-2

12 units

Khasra Details

Total Area

9813.54

105631.96 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No481, 480KA, 479KA, 477, 615, 614(part) 616(part), 617(part)
Area(In Sq. Mt.)9813.54

Other Details

Contractor Name (if any)SN Tiwari
Contractor AddressPrabha Enterprises 182-C, Eldeco Udyan-1, Bangla Bazzar Lucknow 226002
Architect NameSanjay Kumar Gupta
Architect AddressVibhuti Khand, Lucknow
Architect Licence NumberCA/89/12382
Structural Engineer NameAkhilesh Kr. Singh
Structural Engineer AddressD 27 Indra Nagar Lucknow
Mobile number(Project Co-ordinator)7317000856