Site is a single plot well demarcated at its location and approached by 45 mt. wide road on the south-east side. On the west side is an existing boundary of IIIT and on the east side is a proposed 18 mt. road.
2.5 mt. high and 230 mm thick Boundary wall along with RCC columns to strengthen it has been proposed to be constructed along with entry gate complex.
Complete CC internal road along with paver pathways is proposed to be constructed as per CPWD specifications for required load and width. Roads shall have some patterns using granite pavers at junctions and BLOCK entry points.
All internal roads to have 0.75m wide footpath in 40- 60 mm thick concrete/granite pavers or equivalent finishes.
underground water to be supplied through the terrace tank.
Centralized Sewerage system as per design shall be Provided. All Sewerage disposal shall go to the STP for treatment and treated, recycled water shall be used for gardening and complex washing. overflow from the STP shall be connected to the Municipal sewerage system.
A stormwater system as per design shall be Provided. Stormwater from terrace tops, Roads and other landscape areas shall be connected to the Stormwater drain channel and go to the Rainwater harvesting Pits to recharge the Groundwater and overflow shall be connected to Municipal drainage on main 45 mt. road.
Highly enriched green parks with grass cover and plantation/shrubs have been proposed on approved location. Facilities like open Gym and children play equipments to be part of green areas.
"There are 5 types of trees proposed at the site: which are kachnar, gulmauhar, amaltas, kusum and neem."
A well-designed electricity distribution system, as per norms of electricity Board, will be in place along with centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, STP, Pump room etc. 20% of street lighting shall have a solar panel.
Club Building With Basic Recreational Facilities Like Gym, Library And Common Room And Pool Facility. The Said Facility Will Be Shared By The Allottees Of Phase 2 Also.
Centralized Sewerage system shall be Provided. All Sewerage disposal shall go to the STP for treatment and after treatment, water shall be recycled and will be used in gardening, washing and flushing system . Overflow from the STP shall be connected with the Municipal sewerage system.
"Proper garbage disposal/collection point has been proposed. Nagar Nigam to collect garbage from this point. for solid waste management."
A well-designed rainwater harvesting system has been planned along with 6 no. recharge pits for the whole building complex to conserve water. Rainwater from internal roads, rooftops and gardens shall be directed towards recharge pits through drain channels and pipes.
We will use LED light fittings in external and common areas as well as 20% solar street lights. In the STP and Pump room all the equipment shall have energy efficient motors/pumps.
Since the building is less than 45m in height all the fire norms shall be followed as NBC with the approval of the fire department. A dedicated pipeline along with hydrants will be connected to wet risers. Terrace tanks shall have a separate storage facility to store water for fire fighting.
A creche for the children of labours during the construction period with play and study facility. Temporary toilets for workers during the construction period and an emergency medical kit.
Exits from each and every point have been planned and proposed as per norms in case of emergency.
N.A.
Showing 4 blocks with 48 units
Total Carpet Area
19189.44 m²
206553.21 ft²
Total Units
192
2 different types
Blocks & Floors
4
12 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
12848.80 m²
138303.20 ft²