Have queries on this Project?
25.9082771
83.5619976
Showing 1 blocks with 55 units
Total Carpet Area
5963.64 m²
64192.02 ft²
Total Units
52
2 different types
Blocks & Floors
1
9 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
4098.00 m²
44110.46 ft²
North- 93.87 mtr, South- 97.25 mtr, East- 41.72 mtr, West- 44.72 mtr with area under development for approval is 4097.73 sqmt.
Approximately 250 mts long boundary with Elegant Design Integrated with security rails and patterns shall be provided.
Peripheral loop of road connect to each retail entry points with dedicated drop off plaza for cars to stop and drop the visitors.
Not Applicable.
Shall be provided through concerned local authorities keeping in view that supply facility shall be provided as per calculation based upon the NBC. The potable water will be delivered through overhead tanks.
Centralized STP (75 KLD) to treat the sewage and building having its own down comer connected to the main sewerage line as per Approved Drawing. It will be connected through manholes laid along the building.
Centralized STP (75 KLD) to treat the sewage and building having its own down comer connected to the main sewerage line As per Approved Drawing.
Not Applicable.
Trees will be planted along the periphery of the project.
Single Feeder shall be obtained from UPPCL and connect to the central substation and entire project shall have street lighting.
Not Applicable .
Central STP for entire project and building shall be connected to STP.
Project shall have waste segregation area and OWC for treatment of Organic Waste .
Adequate number of Recharge Pits shall be made with multilayered filter system to collect rainwater and allow percolation through perforated pipe to assist ground water recharge.
LED lights and solar light panels shall be used for efficient energy management.
Wet riser will be installed in the project with dedicated water storage tank. The hydrants will also be placed at the required norms as per building codes.
Not Applicable.
Exit signage in common areas shall be provided followed by evacuation plan to assist the occupants, emergency light and general awareness boards will be placed in the project.
As per project requirement.