Launch Date
Completion Date
RERA ID
27.208068
77.94275
We have total 15 plots of different sizes, from 111 sqmtr, to 148 sqmtr in this part of the project.
Boundary wall has been completed in the project.
From the main entrance gate we have proposed RCC concrete road work throughout the entire project.
Wide footpath in thick concrete pavers or equivalent finishes.
Ground water supply facility to be arranged.
Centralized sewerage system shall be provided.
Drains shall be connected with all units and all link drains shall be connected with a main drain, it shall be connected with nearest municipal drain.
Not Applicable.
We will provide many types of trees in the entire project site.
We will design and implement in the system as per local electricity board and will consider centralized transformer, HT panel, LT panel,Feeder pillar and DG back for common services like external lightning, Fountain, STP , Pump room etc.
Not applicable
Not applicable
Not applicable
Rain water harvesting system shall be provided for the whole building complex to conserve water.
Not applicable
Not applicable,
Not applicable
Not applicable.
Not applicable.
Total Area
2394.48 m²
25773.94 ft²