DEMARCATION OF PLOTS WILL BE DONE AS PER THE SANCTION MAP WITH PROPER SET BACKS.
BPUNDARY WALL AT SITE WILL BE MADE FLY ASH/CLAY BRICKS WITH COLUMN BEAMS STRUCTURE. THE HEIGHT OF THE BOUNDARY WALL WILL BE 6 FT , PLASTER WILL BE DONEON THE BOTH BOUNDARY WALL AFTER THAT TWO COAT OF PAINTS WILL BE COATED.
CONCRETE/APEX ROAD WILL BE MADE AT THE SITE .THE BASE OF THE ROAD WILL BE FILLED BY RED MURUM AFTER THAT TWO LAYER OF AGGREGATE WILL BE LAYEDTO MAKE SURE THAT THE ROAD IS UPTO THE MARK, AFTER THIS THE TOP LAYER WILL BE COLOURED, BLACK WHITE APEXROAD WILL BE 7.5 MTR TO 12 MTR WIDE.
FOOTHPATH WILL BE MADE BY INTERLOCKING TYPE B CONCRETE BLOCKS WITH A MINIMUM PATH WIDTH 1.5MTR, LAYING OF INTERLOCKING PAVERS OF 40MM OVER WELL COMPACTED SUBGRADE WITH GSB PAYERS.
FOR WATER SUPPLY WE HAVE A PROVISION OF BOARING WATER SUPPLY PROVISION WILL BE PROVIDED VIA SYSTEM OF PUMPS AND PIPES. WATER WILL GET STORED IN UNDERGROUND TANKS FROM THERE WILL GET SUPPLIED TO INDIVIDUAL UNITS PERSONAL TANKS. THIS WATER WILL BE USED FOR DRINKING AND DAILY USE PURPOSE.
LAYING OF DWC PIPES AND MAKING OF CIRCULAR MANHOLES OF REQUIRED SIZE EG..(600 X 600MM ) IN BRICKD MASSONERY WITH MANHOLES COVERS AS PER MEP DESIGN.
LAYING OF DWC PIPES AND MAKING OF CATCH BASINS OF REQUIRED SIZE EG. (450 X 450MM) IN BRICKS MASSONARY WITH MANHOLES COVERS AS PER MAP DESIGNS.
LAND SCAPING OF THE PARKS WITH PLANTATION INCLUDING TREES, SHRUBS AND GROUND COVERS AND RECREATIONAL AREAS WITH BENCHES, WALKWAYS ETC.
TREE WILL BE PLANTED AROUND 200 IN NUMBERS ALL OVER THE PROJECTS AND IN THE GARDEN WAS WELL.
IRONS POLES WITH STREET LIGHTS WILL BE PLACES ALL OVER THE PROJECT AND PROPER ELECTRIFICATION WITH TRANSFORMER AND WIRING WILL BE DONE AS SHOWN IN THE LAYOUT, ELECTRIFICATION WILL BE DONE IN ALL PLOTS AREA ALSO WITH ISI MARK WIRES, MODULAR SWITCHES WITH PROPER EARTHING ARRANGMENTS.
NA
TREATMENTS AND DISPOSAL SYSTEM OF SEWAGE AND SULLAGE WATER WILL BE RPOVIDED BY CONSTRUCTING SMALL STPPLANTS . THIS ALL WATER WILL BE COLLECTED FROM DIFFRENTS SOURCES OF PLOTS WILL BE COLLECTED AT ONE PLACEAND RECYCLE THE SAME AND WILL BE USED FOR OTHER WORKS LIKE GARDENING WASHING THE COMMON AREAS ETC.
DESIGNATED AREA FOR COLLECTION AND LOADING OF GARBAGE WITH DUSTBINS HAS BEEN PROVIDED.
INSTALLATION OF RAIN WATER HARVESTING SYSTEM FOR PERCOLATION OF RAINWATER TO MAINTAIN THE LOCAL GROUND WATER LEVELS AS PER APPROVDED NORMS AND MAP DRAWINGS.
NA
NA
PROVIDING TODDLERS PARK, CHILDREN PLAY STATION, SIT OUT AREA LUSH GREEN GARDEN.
NA
NA
Showing 1 blocks with 2 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
4187.00 m²