NewActive

DPS PALLADIO

Lucknow, Uttar Pradesh
05-11-2024
Launch Date
New
Type
04-11-2029
Completion Date

Overview

Launch Date

05-11-2024

Completion Date

04-11-2029

RERA ID

UPRERAPRJ717338/01/2025

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)10967
Project NameDPS PALLADIO
Registration Fee (in Rs.)60000
AddressPINTAIL PARK CITY - PHASE 3
Village/Locality/Sector etc.MASTEMAU
StateUttar Pradesh
Project Duration (In month)60
DistrictLucknow
Original Start Date-
TehsilMohanlalganj
Proposed Start Date05-11-2024
Sanctioning Competent AuthorityLucknow Development Authority
Project Cost (in Lacs)16715
Proposed Completion Date04-11-2029

Location

Latitude

26.4724

Longitude

81.0202

Bank Details

Account Details
Name of the AccountBP Infra India LLP- Coll Ac- DPS Palladio
Account Number20200072886935
Bank NameBandhan Bank
Branch NameGomtinagar
Branch Address15, Vivek Khand, Gomti Nagar, Lucknow, Uttar Pradesh
IFSC CodeBDBL0001908
Branch DistrictLucknow
Branch StateSelect
Branch Email Address[email protected]
Separate Account Details
Name of the AccountBP Infra India LLP - SEP AC- DPS Palladio
Account Number20100034472134
Bank NameBandhan Bank
Branch NameGomtinagar
Branch Address15, Vivek Khand, Gomti Nagar, Lucknow, Uttar Pradesh
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeBDBL0001908
Transaction Account Details
Name of the AccountBP Infra India LLP-Trans AC- DPS Palladio
Account Number20100034472121
Bank NameBandhan Bank
Branch NameGomtinagar
Branch Address15, Vivek Khand, Gomti Nagar, Lucknow, Uttar Pradesh
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeBDBL0001908

Development Works

Demarcation of Plots

We have one plot of size 10966.71 sq. mtr.having 1 main entrance gate from the 30 m wide front road.

Boundary Wall

1.8 m high and 230 mm thick Brick work and rcc work in column and beam. At the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall.

Road Work

From the main entrance gate we have 6.0 mtr wide driveay of 80 mm thick interlocking Pavers /RCC road through out the project.

Footpaths

We would not provide any footpath

Water Supply Including Drinking Water Facilities

We will provide 3 nos. of pump (2 working & 1 standby) for the requirement of blocks through underground pipelines.

Sewer System

Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.when come into force. The capacity of STP will be 220 KLD.

Drain

Storm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.

Parks

We will provide green area with the different activities and the green area will have gaming facilities as/ sanctioned layout.

Tree Planting

We will provide many type of trees all along the boundary wall & green area as/sanctioned layout

Design For Electric Supply Including Street Lighting

We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG backup for all DUs & common service like External lighting, Fountain, STP, Pump room etc.

Community Buildings

Community facilities with Gym, Games room, Party Hall and Activity hall would be provided

Treatment and Disposal System of Sewage and Sullage water

Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force. The capacity of STP will be 220 KLD.

Solid Waste Management And Disposal System

There are a proper garbage collection area provided for the solid waste management.

Water Conservation System

We will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.

Energy Management System Including Use of Renewable Energy

We will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.

Fire Protection And Fire Safety System

We will provide Fire Fighting facility in common areas while Individual owner can install their own system as per their and local authorities requirement.

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

We will have staircases which will be provided with emergency exits

Other Miscellaneous Work

NA

Documents

Sale Deed

No: 21587 | Date: 08-07-2024

Details of Encumbrances

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 26-11-2024

Commencement Certificate

Uploaded: 26-11-2024

Proforma of Application Form

Uploaded: 29-11-2024

Proforma of Allotment Letter

Uploaded: 29-11-2024

Proforma of Conveyance Deed

Uploaded: 26-11-2024

Waste Disposal Plan

Uploaded: 26-11-2024

Water Supply Plan

Uploaded: 26-11-2024

Electricity Supply Plan

Uploaded: 26-11-2024

Development Work Plan

Uploaded: 26-11-2024

Affidavit

Uploaded: 26-11-2024

CA CERTIFICATE

Uploaded: 17-12-2024

ARCHITECT CERTIFICATE

Uploaded: 03-12-2024

ENGINEERS CERTIFICATE

Uploaded: 03-12-2024

Other

Uploaded: 03-12-2024

Proforma of Agreement for Sale

Uploaded: 26-11-2024

Permits

Orignal Permit NoGroup Housing/13035/LDA/BP/24-25/1625/22082024
Orignal Permit Date05-11-2024
Valid Upto04-11-2029
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto04-11-2032
End Date04-11-2029
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)Self
Contractor AddressSelf
Architect NameMR. RAKESH KUMAR SHARMA (K-DESIGN)
Architect Address405, Avalon Appt., New Mangalpuri, New Delhi-110030
Architect Licence NumberCA/9113596
Structural Engineer NameM/S. AKB CONSULTANTS
Structural Engineer AddressFirst Floor, 503/2, Old M.G. Road, Patel Nagar, Gurugram-122001
Mobile number(Project Co-ordinator)9452116666

Land Details

AFS

Showing 4 blocks with 154 units

Property Summary

Total Carpet Area

28627.04 m²

308138.60 ft²

Total Units

309

4 different types

Blocks & Floors

4

15 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:92.64 m²
Balconies:515
Parking ratio:0.00 per unit

Block TOWER - A

42 units

Block TOWER - B

43 units

Block TOWER - C

41 units

Block TOWER - D

28 units

Khasra Details

Total Area

10966.71 m²

118044.57 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGH 4 Pintail Park City
Area(In Sq. Mt.)10966.71

Other Details

Contractor Name (if any)Self
Contractor AddressSelf
Architect NameMR. RAKESH KUMAR SHARMA (K-DESIGN)
Architect Address405, Avalon Appt., New Mangalpuri, New Delhi-110030
Architect Licence NumberCA/9113596
Structural Engineer NameM/S. AKB CONSULTANTS
Structural Engineer AddressFirst Floor, 503/2, Old M.G. Road, Patel Nagar, Gurugram-122001
Mobile number(Project Co-ordinator)9452116666