NewActive

DINESH NAGAR TOWER 30,31

Hapur, Uttar Pradesh
15-01-2019
RERA Received Date
New
Type
30-06-2023
Completion Date

Overview

RERA Received Date

15-01-2019

Completion Date

30-06-2023

RERA ID

UPRERAPRJ405645

Location

Latitude

28.721809

Longitude

77.667882

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)1310
Project NameDINESH NAGAR TOWER 30,31
Registration Fee (in Rs.)12000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)54
DistrictHapur
Original Start Date-
TehsilDhaulana
Proposed Start Date15-01-2019
Sanctioning Competent AuthorityHapur Pilkhuwa Development Authority
Project Cost (in Lacs)337
Proposed Completion Date30-06-2023

Bank Details

Account no.628605014772
Name Of Account HolderPlatina Real Estate Pvt. Ltd.
Bank NameICICI Bank
Branch AddressR1/88, Raj Nagar Ghaziabad
Branch NameRaj Nagar Ghaziabad
IFSC CodeICICI0006286

Development Works

Demarcation of Plots

DINESH NAGAR Group Housing PROJECT pabla Modinagar Road near Pilkhuwa Railway station Pilkhuwa.

Boundary Wall

Brick work Boundry wall

Road Work

Interlocking block have been provided at road area.

Footpaths

Interlocking block have been provided at foothpath.

Water Supply Including Drinking Water Facilities

Overhead Water Tank of 350 KL capacity.

Sewer System

Underground System using RCC (NP-2) Sewer pipes.

Drain

Open Drainage System with cover blocks.

Parks

Parks , Green Area Provided as per approved drawings by H.P.D.A.

Tree Planting

Ashoka and kadamn trees already planted.

Design For Electric Supply Including Street Lighting

Transformer (Compact Sub station) of 400 KVA, 11 / 0.4 KV capacity shall be used along with necessary switch-gear for distributing electricity at LT voltage. All street / landscape lighting shall be LED based.

Community Buildings

Not applicable as per approved drawings by H.P.D.A.

Treatment and Disposal System of Sewage and Sullage water

STP already existed. Treated water shall be used for irrigation, carwash, pathway cleaning & excess water shall be discharged into the Municipal drain out side complex.

Solid Waste Management And Disposal System

Solid waste collection chamber proposed on sites as per approved drawings by H.P.D.A. Waste will be disposed through a local Nagar Palika.

Water Conservation System

Rain Water Harvesting facilities shall be provided.

Energy Management System Including Use of Renewable Energy

Not applicable

Fire Protection And Fire Safety System

Fire NOC received from Hapur pilakhuwa development authority.Fire UID No.-2014/3010/HAPU/Hapur/50/CFO. Fire fighting system along with pumps & water storage tanks shall be provided as per NBC & NOC from Fire Department.

Social Infrastructure And Other Public Amenities Including Public Health Services

Shopping complex already exist within group Housing Project.

Emergency Evacuation Services

Not applicable

Other Miscellaneous Work

No

Documents

Extract of Khatauni

No: 1416-1421 | Date: -

Registry Document

No: 9275,15309,7528 | Date: 14-06-2010

Registry Document

No: 8820,13182,13922 | Date: 30-06-2009

Registry Document

No: 2051,10347 | Date: 27-07-2007

Details of Encumbrances

Uploaded: 02-03-2019

Commencement Certificate

Uploaded: 02-03-2019

Other Plan(If Any)

Uploaded: 02-03-2019

Proforma of Application Form

Uploaded: 02-03-2019

Proforma of Allotment Letter

Uploaded: 02-03-2019

Proforma of Conveyance Deed

Uploaded: 02-03-2019

Waste Disposal Plan

Uploaded: 02-03-2019

Water Supply Plan

Uploaded: 02-03-2019

Electricity Supply Plan

Uploaded: 16-03-2019

Development Work Plan

Uploaded: 02-03-2019

Affidavit

Uploaded: 05-03-2019

CA CERTIFICATE

Uploaded: 05-03-2019

ARCHITECT CERTIFICATE

Uploaded: 02-03-2019

ENGINEERS CERTIFICATE

Uploaded: 02-03-2019

Permits

Orignal Permit No153/MAP/HPDA/15-16
Orignal Permit Date20-08-2015
Valid Upto19-08-2020
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto19-08-2023
End Date31-12-2022
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)ASIF CONTRACTOR
Contractor AddressVILLAGE-NAHALI,MODINAGAR ROAD,TEHSIL-MODINAGAR GHAZIABAD
Architect NameSHILPA AGARWAL
Architect AddressSHILP KRITI ARCHITECTS A-47 SECTOR-65 NOIDA
Architect Licence NumberCA/97/21784
Structural Engineer NameASRAF TAJUDDIN
Structural Engineer AddressKEEN ASSOCIATES PVT.LTD - H-53 SEC-63 NOIDA
Mobile number(Project Co-ordinator)8859100805

Land Details

AFS

Showing 2 blocks with 24 units

Property Summary

Total Carpet Area

2112.40

22737.66 ft²

Total Units

48

1 different types

Blocks & Floors

2

4 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:44.01
Balconies:32
Parking ratio:0.00 per unit

Block BLOCK 30

12 units

Block BLOCK 31

12 units

Khasra Details

Total Area

1310.00

14100.71 ft²

3 plots
Khasra
TypeKhasra
Khasra/Plot No759
Area(In Sq. Mt.)916
Khasra
TypeKhasra
Khasra/Plot No760
Area(In Sq. Mt.)329
Khasra
TypeKhasra
Khasra/Plot No761
Area(In Sq. Mt.)65

Other Details

Contractor Name (if any)ASIF CONTRACTOR
Contractor AddressVILLAGE-NAHALI,MODINAGAR ROAD,TEHSIL-MODINAGAR GHAZIABAD
Architect NameSHILPA AGARWAL
Architect AddressSHILP KRITI ARCHITECTS A-47 SECTOR-65 NOIDA
Architect Licence NumberCA/97/21784
Structural Engineer NameASRAF TAJUDDIN
Structural Engineer AddressKEEN ASSOCIATES PVT.LTD - H-53 SEC-63 NOIDA
Mobile number(Project Co-ordinator)8859100805