As per approved layout.
Boundary wall will be around 6 feet high with lower portion of brick wall and upper 2 ft. in MS grill.
The internal road will be 7.62 mtr and 9.14 mtr wide tar road with pedestrian on either side with storm water drainage below it.
The footpath will be concrete paver block.
The water supply to the individual plots will be through hydro pneumatic system with centralized location of underground water tank.
Centralized STP system will be provided to cater for the entire sewage generated within the project with zero discharge.
Storm water drain under footpath will be strategically connected to rain water harvesting pits.
Approx 70 percent of plot area is the part of open green and park spaces.
Ample tree plantation will be done in according to the climatic condition of the area.
Electric supply will be provided through the central feeder. Energy efficient street lighting will be used in combination of solar operated lighting system
Project is proposed to be facility with community building space for shopping center.
Zero discharge STP planned for the project and for storm water, ample rain water harvesting pits.
Space for Solid waste management and disposal system allocated in the project where proper segregation will be done.
Rain water harvesting pits have been provided at the appropriate location.
Street lighting will be time based which would be automatically controlled. Common area will be powered through solar panel as per norms which will be automatically controlled.
Fire protection and fire safety system will provide as per NBC guidelines, 2016.
Site is well connected to social infrastructure line, school, college, hospital and haat bazar.
Sufficient open space and park which can be used for emergency evacuation in case of any natural calamity.
Plotting and construction of the project with appropriate green area norms.
Total Area
23165.00 m²
249345.74 ft²