Have queries on this Project?
25.23120
82.54055
Showing 1 blocks with 65 units
Total Carpet Area
2529.42 m²
27226.42 ft²
Total Units
65
2 different types
Blocks & Floors
1
9 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
1257.05 m²
13530.76 ft²
We have a plot with an area of 1417.47 sq. m (Net plot 1257.05 sq. m.), and the main entrance is from a 24-meter-wide road on the north side.
A 1.5 m high and 230 mm thick brick boundary wall is proposed, along with RCC columns and beams. A project logo / branding will be provided at the center of the front face of the boundary wall.
Around the building periphery, a 6.0 m wide driveway is proposed, to be constructed in cement concrete with a cobblestone pattern finish.
NA
We will provide one nos. of pump for the requirement of water through underground pipelines.
All building wastewater, including that from kitchens and toilets, shall be conveyed to the STP, of capacity 21 KLD, through a network of channels, and any overflow will be connected to the municipal sewerage system.
Storm water shall be discharged into the rainwater harvesting pit through storm water drains, which will help in recharging the groundwater table. Any overflow shall be discharged into the municipal drain line.
NA
Various types of trees will be provided along the boundary wall.
The electrical system will be designed and implemented as per the local Electricity Board norms, with provision for a centralized transformer (capacity 400 KVA), HT panel, LT panel, feeder pillar, and DG backup (capacity 160 KVA) for common services such as external lighting, STP, and the pump room.
NA
All building wastewater, including that from kitchens and toilets, shall be conveyed to the STP, of capacity 21 KLD, through a network of channels, and any overflow will be connected to the municipal sewerage system.
One no of dustbin for dry and one for wet waste collection would be provided.
The units will be equipped with low-flow fixtures. Treated water from the STP, of capacity 21 KLD, will be used for flushing and gardening, and rainwater will be utilized to help improve the groundwater table.
LED light fittings will be used for both internal and external lighting. Provision for a solar water heating pump is also made, which will help reduce the overall energy consumption of the building.
Firefighting facilities have been provided in the common areas as per the requirements of NBC 2016.
NA
Staircases have been provided with emergency exit doors and emergency exit gates.
NA
Coral Studios is located in Varanasi.
Yes. Coral Studios is registered under UPRERAPRJ369951/03/2026 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Coral Studios is 14 November 2030.
Coral Studios is developed by CORAL GREENS BUILDTECH PRIVATE LIMITEDKRIPAKAR DUBEYREKHA DUBEY.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.