Launch Date
Completion Date
RERA ID
25.2878
82.8902
Plot is already demarcated all the development and construction work will be as per sanctioned plan.
Brick made boundary wall combination of RCC is proposed around the project as per sanctioned plan.
6 Meter wide bituminous road has been proposed around the proposed building which will connect the main road.
No footpath will be provided
Water supply including drinking water will be provided using a submersible /tubewell through an overhead tank from which each unit will be connected
A centralizes sewer system will be provided underground sewer line will be constructed which will linked with main dumping.
Strom water system will be provided which will be connected to the main drain line of the city
There is no park is proposed.
Many types of bushes and tree will be planted as per sanctioned plan
Centralize transformer HT Panel, LT panel, Feeder Piller and DG Backup as per electric plan.
There is no community building is proposed.
For treatment and disposal system of sewage and sullage water, STP will be installed as per plan.
The solid waste is collected and disposed through STP.
Rainwater harvesting system will be provided
By using the LED light we could manage the energy.
Firefighting system will be provided as per the sanctioned plan.
N/A
Two stairs have been provided for emergency evacuation.
N/A
Showing 1 blocks with 46 units
Total Carpet Area
4577.34 m²
49270.03 ft²
Total Units
46
5 different types
Blocks & Floors
1
11 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
2163.07 m²
23283.07 ft²