Total Units
48
1 unit type
Carpet Area
11,765 ft²
1,092.96 m² · carpet only, excludes balcony
Blocks & Floors
1
4 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 245 ft² (22.77 m²)Balconies 48Parking per unit 0.00
All blocks
Showing 4 of 4 rows · 7 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit | Balconies | Balcony Areatotal |
|---|---|---|---|---|---|---|
| T1 | GF | 1 BHK | 12 | 245 ft²22.77 m² | 12 | 175 ft²16.27 m² |
| T1 | 1 | 1 BHK | 12 | 245 ft²22.77 m² | 12 | 175 ft²16.27 m² |
| T1 | 2 | 1 BHK | 12 | 245 ft²22.77 m² | 12 | 175 ft²16.27 m² |
| T1 | 3 | 1 BHK | 12 | 245 ft²22.77 m² | 12 | 175 ft²16.27 m² |
Total Plot Area
1.54 acres
6,250.00 m² · plot area
To be done at time of execution of time
Not Proposed
Internal c c road to be constructed by upavp as per attached layout external road to be constructed as per GO No.1878/eight-1-18-80-vividh/2010 awas evam sahri niyojan anubhag 1 lucknow
Provided as per norms
Internal water line laying and place water storege tank on the roof will be provided by upavp and external water line as per GO No.1878/eight-1-18-80-vividh/2010 awas evam sahri niyojan anubhag 1 lucknow
Internal Sewer line will be laid by UPAVP with connection to septic tank and soakpit.External Sewer facility will be provide by UP JAL NIGAM, as per GO No.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
Internal Drain facility will be Provide by UPAVP and External Drain facility will be provide by UP JAL NIGAM, as per GO No.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
Will be Constructed by UPAVP, Kanpur. As Per GO No.1878/Eight-1-18-80-vividh/2010 awas evam shahri niyojan anubhag lko
Will be Constructed by UPAVP,Kanpur . As Per GO No.1878/Eight-1-18-80-vividh/2010 awas evam shahri niyojan anubhag lko
Internal Electric Supply and Street Lighting will be Provide by UPAVP and External Electric Supply and Street Lighting will be provide by UPPCL, as per GO No.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
Community building like health center, Schools, Anganbaries etc. Will be done by concerning Department as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
Will be done by UP Jal Nigarm, as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
Will be done by UP Jal Nigarm, as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
As Per GO No.1878/Eight-1-18-80-vividh/2010 awas evam shahri niyojan anubhag lko
Will be done by UP Power Corporation,as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
As per NBC guidelines not required for G+3 building.
Social Infrastructure like health center, Schools, Anganbaries etc. Will be done by concerning Department as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
As Per Norms
As Per GO No.1878/Eight-1-18-80-vividh/2010 awas evam shahri niyojan anubhag lko
construction of 48 nos (G+3) Under Pradhanmantri Awas Yozna (AHP) at village-Ladaka Purwa Banda is located in Banda.
Yes. construction of 48 nos (G+3) Under Pradhanmantri Awas Yozna (AHP) at village-Ladaka Purwa Banda is registered under UPRERAPRJ658600 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for construction of 48 nos (G+3) Under Pradhanmantri Awas Yozna (AHP) at village-Ladaka Purwa Banda is 30 September 2025.
construction of 48 nos (G+3) Under Pradhanmantri Awas Yozna (AHP) at village-Ladaka Purwa Banda is developed by U.P. AWAS EVAM VIKAS PARISHAD.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.