26.96435
81.19780
Showing 1 blocks with 4 units
Total Carpet Area
1092.96 m²
11764.51 ft²
Total Units
48
1 different types
Blocks & Floors
1
4 floors across all blocks
Parking
0
0 garages, 0 open
No: 8/247/Paanch-Bhu.Vyay.-Punargrahan-2018 | Date: 10-08-2018
Total Area
8560.00 m²
92138.98 ft²
As per proposed layout plan of PMAY (U) layout plan of Barel Barabanki of Block B1. Total Ground Coverage of 01 Block is equal to 408.84 sqm.
Not applicable
Yet to be started as per Layout Plan. Internal Road work will be done by U.P.A.V.P and External Road work will be done by U.P.P.W.D. as per G.O.No. 1878/Aath-1-16-80/Miscellaneous/2010 Dated 17.10.2018. Road will be prepared with Bituminous concrete including Base of WMM/WBM and GSB.
Yet to be started as per Layout Plan. Internal Footpath work will be done by U.P.A.V.P and External Footpath work will be done by U.P.P.W.D. as per G.O.No. 1878/Aath-1-16-80/Miscellaneous/2010 Dated 17.10.2018. Footpath will be prepared as per U.P.A.V.P specifications (By Interlocking Tiles or By S.O.B. Brick Soling)
Yet to be started as per Layout Plan. Internal Water Supply Including Drinking Water Facilities work will be done by U.P.A.V.P and External Water Supply Including Drinking Water Facilities work will be done by U.P.Jal Nigam as per G.O.No. 1878/Aath-1-16-80/Miscellaneous/2010 Dated 17.10.2018. For water supply rising main pipe will be laid as U.P.A.V.P specifications.
Yet to be started as per Layout Plan. Internal Sewer System work will be done by U.P.A.V.P and External Sewer System work will be done by U.P.Jal Nigam as per G.O.No. 1878/Aath-1-16-80/Miscellaneous/2010 Dated 17.10.2018. As per site requirement Soak pit and Septic tank will be provided for sewarage system.
Yet to be started as per Layout Plan. Internal Drain work will be done by U.P.A.V.P and External Drain work will be done by U.P. Local Bodies as per G.O.No. 1878/Aath-1-16-80/Miscellaneous/2010 Dated 17.10.2018. Drain will be prepared in Brick work with 1 ratio 6 in cement and coarse sand including pointing of surface in 1 ratio 3.
Yet to be started as per Layout Plan by U.P.A.V.P and also demarked by Boundary wall at site as provision in estimate.
Yet to be started as per Layout Plan by U.P.A.V.P. Trees shall be planted at road side patries . Height of tree shall be upto 5 feet or above 5 feet.
Yet to be started as per Layout Plan. Internal Drain work will be done by U.P.A.V.P and External Drain work will be done by U.P. P.C.L. as per G.O.No. 1878/Aath-1-16-80/Miscellaneous/2010 Dated 17.10.2018.
Not Applicable
After completion of project will be handed over to Local Authority. Sewerage and Sullage Waste point is situated in proposed scheme.
After completion of project will be handed over to Local Authority. Sewerage and Sullage Waste point is situated in proposed scheme.
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
As per Layout Plan