Have queries on this Project?
27.595309
81.638978
Showing 4 blocks with 16 units
Total Carpet Area
4371.84 m²
47058.05 ft²
Total Units
192
1 different types
Blocks & Floors
4
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
4509.00 m²
48534.43 ft²
Demarcation of Plots As per Layout Plan, Block No- 1,2,3,4, wiil be done by U.P.A.V.P.
Not Applicable
Yet to be started as per Layout Plan. Internal Road work will be done by UPAVP and External Road work will done by U.P. P.W.D as per GO No-1878/Aath-1-16-80/Miscellaneous/2010 Date-17/10/2018
Not Applicable.
Yet to be started as per Layout Plan. Internal water supply including Drinking water facilities work will be done by U.P.A.V.P and External water supply including Drinking water facilities work will be done by U.P. JAL NIGAM as per GO No- 1878/Aath-1-16-80/Miscellaneous/2010 Date-17/10/2018
Yet to be started as per Layout Plan.Internal sewer system work will be done by U.P.A.V.P and External sewer system work will be done by U.P. JAL NIGAM as per GO No- 1878/Aath-1-16-80/Miscellaneous/2010 Date-17/10/2018
Yet to be started as per Layout Plan. Internal Drain system work will be done by U.P.A.V.P and External Drain System work will done by U.P. Local Bodies as per GO No- 1878/Aath-1-16-80/Miscellaneous/2010 Date-17/10/2018
Yet to be started as per Layout Plan by U.P.A.V.P
Yet to be started as per Layout Plan by U.P.A.V.P
Yet to be started as per Layout Plan. Internal Electric supply system work will be done by U.P.A.V.P and External Electric supply system work will be done by U.P. P.C.L as per GO No- 1878/Aath-1-16-80/Miscellaneous/2010 Date-17/10/2018
Not Applicable.
After completion of Project will be handed over to Local Authority. Sewarage and sullage waste Point is situated in Proposed Scheme.
After completion of Project will be handed over to Local Authority. Solid waste Point is situated in Proposed Scheme.
Not Applicable
Not Applicable
Not Applicable.
Not Applicable
Not Applicable
As per Layout Plan and given direrction of according to U.P.A.V.P.
Construction Of 48 Nos. (G+3) Ews Houses Under Pradhanmantri (Shahri) Awas Yojna, At Bahraich Bhinga Marg Yojna, Bahraich. is located in Bahraich.
Yes. Construction Of 48 Nos. (G+3) Ews Houses Under Pradhanmantri (Shahri) Awas Yojna, At Bahraich Bhinga Marg Yojna, Bahraich. is registered under UPRERAPRJ772651 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Construction Of 48 Nos. (G+3) Ews Houses Under Pradhanmantri (Shahri) Awas Yojna, At Bahraich Bhinga Marg Yojna, Bahraich. is 30 March 2025.
Construction Of 48 Nos. (G+3) Ews Houses Under Pradhanmantri (Shahri) Awas Yojna, At Bahraich Bhinga Marg Yojna, Bahraich. is developed by U.P. AWAS EVAM VIKAS PARISHAD.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.