Have queries on this Project?
26.796970
79.010326
Showing 1 blocks with 4 units
Total Carpet Area
1092.96 m²
11764.51 ft²
Total Units
48
1 different types
Blocks & Floors
1
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
15552.00 m²
167400.17 ft²
The Plot is clearly demarcated in Spining Mill Awasiya Yojna Etawah. As per the sanctioned layout the plot is situated facing 18.00 m wide road in layout. Apart from 18.00 m wide road 5.00 m wide road and 6.00 m wide road are also proposed in layout encompassing this plot.
Boundary wall is not included in the proposed projected. It will be constructed seprate project.
Road work for the whole scheme is completed. In the proposed project of 48 Nos. of houses 5.00 meter wide road 48.00 meter in length 6.00 meter wide road 74.00 meter length which is shown in layout is to be constructed as seperate project.
Footpaths are not proposed in the sanctioned layout plan of the project.
Over head tank and Water supply distribution system is already laid for the whole scheme. Only connection with main line is required for this project which will be done at completion stage as seperate project.
Main Sever Line of whole scheme had been completed. Only connection with main sewer line is required for this project which will be done at completion stage as seperate project.
Drainage system of whole scheme are in under project which is likely to be completed November 2020. Internal drain approx 74.00 meter length to be constructed as seperate project.
Construction of boundary wall/RCC grill of the proposed park in the scheme is already completed. For the particular project as per layout park is loacted at with in the vicinity of hardly 80.00 m from the proposed project.
Tree plantation in the scheme is under progress which will be done on roads and parks of the scheme. For the mentioned plot of PMAY 48 Nos. of houses plantation on 5.00 m and 6.00 m wide road will be done after drain and road work.
Electric supply including street lighting is not included in the proposed projected. It will be constructed seprate project.
Community building is proposed in layout of Spining Mill Awasiya Yojna Etawah. Which is not too far away from this project.
Treatment and disposal system of sewage and sullage water is proposed in layout of Spining Mill Awasiya Yojna Etawah. Which is not too far away from this project.
Solid waste management and disposal system is proposed in layout of Spining Mill Awasiya Yojna Etawah. Which is not too far away from this project.
In the presence proposed PMAY housing scheme unit area of individual flat is very small thus water conservation system is not the part of this project.
In the present proposed PMAY Housing scheme energy management system including use of renewable energy is not proposed in the approved DPR.
In the present proposed PMAY Housing scheme Fire proctetion and fire safety system is not the part of approved DPR.
Public Amenities such as schools, hospitals etc are available in nearby vicinity
Sufficient No of staircases is being proposed in the building
Ample amount of open areas park etc are available in the Spining Mill Awasiya Yojna Etawah