Have queries on this Project?
27.132678
81.938976
Showing 9 blocks with 36 units
Total Carpet Area
9016.92 m²
97057.23 ft²
Total Units
396
1 different types
Blocks & Floors
9
4 floors across all blocks
Parking
0
0 garages, 0 open
No: 101/NAJOOL VIBHAG/BHU. HASTA./2018 | Date: 06-08-2018
Total Area
9098.00 m²
97929.96 ft²
As per Layout Plan by UPAVP.
Not Applicable
Yet to be started as per Layout plan.Internal Road work will be done by UPAVP and External Road work will be done by UPPWD as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018. Bituminous road is proposed with Base of WMM/WBM and including GSB.
Yet to be started as per Layout plan.Internal Footpath work will be done by UPAVP and External Footpath work will be done by UPPWD as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018. Footpath prosed as per UPAVP guidelines by Interlocking tiles or SOB Brick soling.
Yet to be started as per Layout plan.Internal Water Supply Including Drinking Water Facilities work will be done by UPAVP and External Water Supply Including Drinking Water Facilities work will be done by UP JAL NIGAM as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018. Water supply proposed as per UPAVP guidelines with rising main.
Yet to be started as per Layout plan.Internal Sewer System work will be done by UPAVP and External Sewer System work will be done by UP JAL NIGAM as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018. Septic tamk and soak pit proposed as per site requirement for sewage disposal.
Yet to be started as per Layout plan.Internal DRAIN System work will be done by UPAVP and External DRAIN System work will be done by UP LOCAL BODIES as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018. Brick work in 1 ratio 6 proposed for drain with pointing.
Yet to be started as per Layout plan by UPAVP.
Yet to be started as per Layout plan by UPAVP.
Yet to be started as per Layout plan.Internal ELECTRIC SUPPLY System work will be done by UPAVP and External ELECTRIC SUPPLY System work will be done by UP PCL as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
Not applicable.
After completion of project will be handed over to local authority.Sewarage and sullage waste Point is situated in Proposede scheme.
After completion of project will be handed over to local authority.Sewarage and sullage waste Point is situated in Proposede scheme.
Not applicable.
Not applicable.
As per Layout Plan
Not applicable.
Not applicable.
As per Layout Plan
Construction of 396 Nos houses under PMAY (U) in second Phase at Gonda. is located in Gonda.
Yes. Construction of 396 Nos houses under PMAY (U) in second Phase at Gonda. is registered under UPRERAPRJ814610 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Construction of 396 Nos houses under PMAY (U) in second Phase at Gonda. is 30 May 2026.
Construction of 396 Nos houses under PMAY (U) in second Phase at Gonda. is developed by U.P. AWAS EVAM VIKAS PARISHAD.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.