RERA Received Date
Completion Date
RERA ID
28.942041
77.750446
Demarcated by RCC flag stone in located area
NA
102.84 Metre Long 9.00 M wide Road already constructed by WMM, BM and SDBC in located area
Footpath constructed by I Shaped interlocking Cement Concrete Paver Blocks
102.84 Metre Lenth Water supply line 100mm dia, 150 mm dia, 200mm dia PVC Pipe already laid in whole area, water supply by OHT at Sector 5
102.84 Metre Lenth Sewer Line 250 mm NP-3 RCC Hume Pipe, already laid and jointed to the trunk sewer line
205.68 Metre Lenth CK type drains already constructed Class M-150 bricks and cement mortar and Three Culvert also constructed in RCC 1, 1.5 ,3 complete in all respect
03 nos Parks already constructed in sec 5 and one of these three park also located in front of proposed houses
Trees are planted under the scheme every year characteristics determined by the Govt
Electricity Supply line already in working condition in located area and street light also
Community Center Proposed in Layout and Developed in Future
Sewer Disposal by sewer treatment plant in parishad scheme STP
Disposal By UP Awas Vikas Parishad
NA
Energy Management System including the use of Renewable Energy will be used by the installing solar power plants on the roof of Community Centres, power houses and other site offices to be constructed by UP Awas Vikas Parishad
For Fire Protection provision fire hydrants has been made in water supply line
Social Infrastructure and Other Public Amenities Including Public Health Services Provided in layout
NA
NA
Total Area
2184.00 m²
23508.36 ft²