Total Units
192
1 unit type
Carpet Area
47,058 ft²
4,371.84 m² · carpet only, excludes balcony
Blocks & Floors
1
4 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 245 ft² (22.77 m²)Balconies 192Parking per unit 0.00
All blocks
Showing 4 of 4 rows · 9 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit | Balconies | Balcony Areatotal | Verandahs | Verandah Areatotal |
|---|---|---|---|---|---|---|---|---|
| A B C D | GF | OTHER | 48 | 245 ft²22.77 m² | 48 | 701 ft²65.09 m² | 2 | 557 ft²51.75 m² |
| A B C D | 1 | OTHER | 48 | 245 ft²22.77 m² | 48 | 701 ft²65.09 m² | 2 | 557 ft²51.75 m² |
| A B C D | 2 | OTHER | 48 | 245 ft²22.77 m² | 48 | 701 ft²65.09 m² | 2 | 557 ft²51.75 m² |
| A B C D | 3 | OTHER | 48 | 245 ft²22.77 m² | 48 | 701 ft²65.09 m² | 2 | 557 ft²51.75 m² |
Total Plot Area
3.84 acres
15,552.00 m² · plot area
The plot is clearly demarcated in Spining Mill Awasiya Yojna Etawah
At present time boundary wall is not required
Will be started after major structural work of building is about to be completed
Will be started after major structural work of building is about to be completed
Will be started after major structural work of building is about to be completed
Will be started after major structural work of building is about to be completed
Will be started after major structural work of building is about to be completed
Will be started after major structural work of building is about to be completed
Will be started after major structural work of building is about to be completed
Will be started after major structural work of building is about to be completed
Community building is proposed in layout of Spining Mill Awasiya Yojna Etawah. Which is not too far away from this project.
Treatment and Disposal System of Sewage and Sullage water is proposed in layout of Spining Mill Awasiya Yojna Etawah. Which is not too far away from this project.
Solid Waste Management And Disposal System is proposed in layout of Spining Mill Awasiya Yojna Etawah. Which is not too far away from this project.
Not Applicable.
In the present proposed PMAY Housing scheme energy management system including use of renewable energy is not proposed in the approved DPR
As per NBC guidelines not required for this project.
Public Amenities such as schools, hospitals etc are available in nearby vicinity.
Sufficient No. of staircases is being proposed in the building
Ample amount of open areas, park etc are available in the Spining Mill Awasiya Yojna Etawah
Construction of 192 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) At Spining Mill Awasiya Yojna Etawah is located in Etawah.
Yes. Construction of 192 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) At Spining Mill Awasiya Yojna Etawah is registered under UPRERAPRJ303513 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Construction of 192 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) At Spining Mill Awasiya Yojna Etawah is 30 September 2022.
Construction of 192 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) At Spining Mill Awasiya Yojna Etawah is developed by U.P. AWAS EVAM VIKAS PARISHAD.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.