Have queries on this Project?
26.817222
83.391169
Showing 32 blocks with 125 units
Total Carpet Area
34905.00 m²
375713.93 ft²
Total Units
1500
1 different types
Blocks & Floors
32
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
53470.00 m²
575545.73 ft²
AREA HAS BEEN DEMARCATED
THERE IS NO PROVISION OF BOUNDARY WALL IN THE PROJECT
BITUMINOUS ROADS HAVE BEEN PROVISIONED
FOOTPATH SHALL BE CONSTRUCTED ALONG WITH ROADS
DRINKABLE WATER SHALL BE SUPPLIED THROUGH BORED WELL
SEWERAGE NETWORK AS PER DESIGN SHALL BE SET UP
DRAINS AS PER DESIGN SHALL BE CONSTRUCTED
PARKS SHALL BE DEVELOPED INN THE SCHEME
TREES SHALL BE PLANTED WITHIN OPEN SPACES AND PARKS
ELECTRICAL LOAD AS PER SANCTIONED UPPCL DRAWING SHALL BE INSTALLED
N/A
SEWER SHALL BE TREATED AT STP
GARBAGE COLLECTION CENTRES HAVE BEEN PROVISIONED AND MUNICIPAL CORPORATION WILL HANDLE THE GARBAGE
N/A
N/A
N/A
N/A
N/A
N/A
Construction of 1500 (G+3) EWS houses in Raptinagar Extension scheme under PMAY is located in Gorakhpur.
Yes. Construction of 1500 (G+3) EWS houses in Raptinagar Extension scheme under PMAY is registered under UPRERAPRJ15669 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Construction of 1500 (G+3) EWS houses in Raptinagar Extension scheme under PMAY is 29 June 2021.
Construction of 1500 (G+3) EWS houses in Raptinagar Extension scheme under PMAY is developed by GORAKHPUR DEVELOPMENT AUTHORITY.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.