Have queries on this Project?
27.132670
81.939865
Showing 1 blocks with 4 units
Total Carpet Area
5464.80 m²
58822.56 ft²
Total Units
240
1 different types
Blocks & Floors
1
4 floors across all blocks
Parking
0
0 garages, 0 open
No: 101/NAJOOL VIBHAG/BHU. HASTA./2018 | Date: 06-08-2018
Total Area
5503.00 m²
59233.74 ft²
BAs per Layout Plan. BLOCK NO -B5,B6,B9,B10,B11
Not Applicable
Yet to be started as per Layout plan.Internal Road work will be done by UPAVP and External Road work will be done by UPPWD as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
Yet to be started as per Layout plan.Internal Footpath work will be done by UPAVP and External Footpath work will be done by UPPWD as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
Yet to be started as per Layout plan.Internal Water Supply Including Drinking Water Facilities work will be done by UPAVP and External Water Supply Including Drinking Water Facilities work will be done by UP JAL NIGAM as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
Yet to be started as per Layout plan.Internal Sewer System work will be done by UPAVP and External Sewer System work will be done by UP JAL NIGAM as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
Yet to be started as per Layout plan.Internal DRAIN System work will be done by UPAVP and External DRAIN System work will be done by UP LOCAL BODIES as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
Yet to be started as per Layout plan by UPAVP.
Yet to be started as per Layout plan by UPAVP.
Yet to be started as per Layout plan.Internal ELECTRIC SUPPLY System work will be done by UPAVP and External ELECTRIC SUPPLY System work will be done by UP PCL as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
Not applicable.
After completion of project will be handed over to local authority.Sewarage and sullage waste Point is situated in Proposede scheme.
After completion of project will be handed over to local authority.Solid Waste Point is situated in Proposede scheme.
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
As per Layout Plan.
Construction of 132 Nos. PMAY (URBAN) Block B6, B9 & B10 at First Phase in Gonda is located in Gonda.
Yes. Construction of 132 Nos. PMAY (URBAN) Block B6, B9 & B10 at First Phase in Gonda is registered under UPRERAPRJ375818 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Construction of 132 Nos. PMAY (URBAN) Block B6, B9 & B10 at First Phase in Gonda is 30 March 2025.
Construction of 132 Nos. PMAY (URBAN) Block B6, B9 & B10 at First Phase in Gonda is developed by U.P. AWAS EVAM VIKAS PARISHAD.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.