Have queries on this Project?
25.473296
78.617234
Total Area
122760.00 m²
1321376.36 ft²
complete
85 percent complete-RCC Column , beam and Brick work height -1.80m and 230mm thick wall boundary wall
70 percent complete-7.50m 9.00m 12.00mm 18.00mm and 34.00 meter Road as per Layout , Sub-base -125mm to 175mm , and 250mm thick WMM . Top coat - 40mm DBM ,20mm BC
as per specification of up awas ewam vikas parishad .Levelling and dressing.
as per design - 100mm to 150mm dia PVC pipe .400KL Over head tank .110KL CWR. As per MOU with UP JAl Nigam -1MLD Water will be provide under Amrat Yojna . till the end of 2022
as per design 250mm , 300mm,350mm,400mm ,450mm and 500 mm dia NP-3 pipe with chamber and Manhole . disposal by 1MLD Sewer treatment Plant.
as per design CK, C1 , C2to C10 and U Type Brick work and RCC drain .
as per specification. Park -toe wall 230 mm thick and 900mm height brick work. and grill (second phase) and plantation
as per require in Park. and patry
As per layout Electric Sub station (ESS) area has proposed 1791.17 sqm .where 2-5Mva transfer 330 substation. 5 nos -400 kva transfermer ,11 meter 8.5 meter PCC Pole and Over head line and Cable as per required will be constructed by up awas vikas parishad and will be test and handed over to uppcl.
yes PLOT Area community center 2250.00 sqm has reserved for its
planned sewer line network and 1MLD STP shall be constructed. and treated water disposed to Nagar Nigam Nala
Collected door to door by Nagar Nigam Vehicle . disposed same .
Rain water harvesting as per Government rule.
Solar panel in individual plots and houses in lie with the building by laws to be adopted.
fire hydrant provided in line with fire norms.
yes
in line with the government guidelines.
in accordance with registration booklet.