Total Area
1401.00 m²
15080.22 ft²
As per Approved Layout Plan. The Plot shall be demarcated by means of Dagbelling.
Parishad shall not provide any Boundary wall.
Yet to be started as per Layout plan.Internal Road & Footpath work will be done by UPAVP as per Parishad specification. Providing and Laying one coat of WBM (45-90) in depth of 0.09 M and second coat of WBM (45-63) in depth of 0.075 M. Third coat of WMM in depth of 0.075 m . After all three layers two layers of Bituminous concrete laid as per MORTH guidelines with total thickness of 6.50 cm.
Not Provided As per Specifications of UP Awas Evam Vikas Parishad and inline with approved map. (Chief Engineer Office order No 685/M-4/2017 dt 19.03.2017 and others ). Work shall be carried out as per Uttar Pradesh Public work departments shedule of rates (Specifications ) .
Yet to be started as per Layout plan.water supply work will be done by UPAVP. Supply and laying of 90 mm dia PVC pipe (ISI mark) as per layout plan. Making water connection joints as per layout plan including all fittings.
Yet to be started as per Layout plan.Sewarage work will be done by UPAVP as per parishad specifications. S.W.R 110 dia pipe will be provided as per specifications.Manhole and regulating shaft proving in Brick masonary.and also providing RCC manhole cover as per layout plan.
Yet to be started as per Layout plan.Storm water work will be done by UPAVP as per Parishad specifications.Open channeled drain of Class 150 brick work in 1:6 including base of Plain cement concrete of 1:6:12.The size of drain will be 9"X9" . Depth of drain shall be vary as per site slope and other conditions.
Not Provided as shown in approved layout .
By side of the Roads and in Parks As per Approved Layout.
Shall be done in house (by UPAVP) and shall be handed over to UPPCL for issuing individual connections .
No any provision for Community Buildings.But many community buildings are also avilable in Parishad scheme.
No any provision for Treatment and disposal of sewage and sullage water by UPAVP. But after completion the project Nagar Palika Parishad Barabanki shall be provided facility of Treatment and disposal of sewage and sullage water because Yojna is handed to Nagar Palika Parishad Barabanki.
No any provision for Solid Waste management & Disposal by UPAVP. But after completion the project Nagar Palika Parishad Barabanki shall be provided facility of Solid Waste management & Disposal because Yojna is handed to Nagar Palika Parishad Barabanki.
No any provision for Water conservation .
No any provision for Energy management System Including Use of Renewable Energy.
No any provision for Fire protection and fire safety requirements
No any provision for Social Infrastructure And Other Public Amenities Including Public Health Services.But in Parishad scheme many social infrastructures are available.
No any provision.
No any provision.