Launch Date
Completion Date
RERA ID
26.43
80.56
Demarcation of proet to be done at site as per approved layout site is surronded by 18 mtr road from north, kisan path road from South and other plots by east and master plan road in west.
1.5 - 2.4 m high and 200 mm thick boundary wall designed or with MS Railing as poer approved design. Brick work of 9 inches adn rcc work in column and beam may be used as per design.
7.5 mtr wide drive-way, 6 mtr wide fire tender path by bitumen road/cc will be constructed as per approved layout or as per requirement and designed by promoter.
Both side of road, footpath will be developed, width 1.0 to 1.5 mtr. with tiles pavers or equivalent finishes or as per requirement of landscape design.
All floors must be equipped with domestic water for sanitary activities and STP (Sewae Treatment Plant) treated water for the flushing system. Individuals may utilize an RO (Reverse Osmosis) system as per their specific requirements for potable designated for fire water.
The building will be equipped with a centralize sewerage system, ensuring all sewage water is directed to the sewage
A stormwater system will be implemented to manage stormwater from roads and other landscaped areas. The stormwater will be directed to the stromwater drain chennel, while rooftop stormwater will be channeled to a rainwater harvesting pit to recharge the grounwater. This approach effictively mitigates the impact of stormwater runoff and contributes significantly to sustainable water management practices
There is a significant green area beside building for different recreational activities.
The trees of category ornamental, shady and native species shall be planted in the entire project as per the species recommended in the landscape in order to maintain greenery and natural view..
Common ESS developed for Metrocity Township. Electric supply will be provided from ESS. Street lights will be fixed at road berms as per requirement and design.
Common Community building as per approved layout, will be provided for GH-2
Centralized sewerage system for entire Group housing shall be connected to STP. All sewerage water after treatment shall be used in Irrigation of green areas and as per govt. norms.
Project shall have waste segregation area. The solid waste shall encouraged for segregation with in all apartments. The dustbins shall be provided for segregated waste in the common areas.
A well designed rain water harvesting system as per govt. norms shall be provided for the
Energy management system will be provided as per Govvt. Norms
All fire norms shall be followed as per NBC code and approval of fire department. Fire sprnklers, smoke detectors with pumps are provided as per norms.
NA
Fire staircase is provided in the each building with fire resistant doors and adequate signage is also provided.
NA
Showing 1 blocks with 6 units
Total Carpet Area
6426.00 m²
69168.82 ft²
Total Units
204
1 different types
Blocks & Floors
1
3 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3625.00 m²
39019.14 ft²