Launch Date
Completion Date
RERA ID
28.393488
79.474691
Demarcation of the plot on which affordable housing is planned has been done as per the sanction map with proper set back.
Boundary wall on both the sides has been done and very soon the back wall shall be completed, the height of the boundary wall 6 feet plaster done both side of the boundary wall .and paints will be coated.
6 mts wide RCC road has been planned through out the project, it ensures the fire complaince too. two layer of aggregate will be layed to make sure that the road is upto the mark.
foothpats on both the sides of the tower has been designed and will be made by interlocking type B concrete blocks pavers
Water connection from the local body wound be provided . A large water storage tank is planned for the emergency times.water will get stored in underground tanks from therewill be supplied to indicidual unites personal tanks. the water will be usedfor drinking and daily use purpose.
Underground sewer line with manholes at every 6m has been planned, all water drain waste drains will come connect in the sewage treatment plant.
Drainage would be underground with the enough openings for the cleaning purpose. drain will be made below the foothpaths with chambers. drain will be made with brickwork and pv pipe of diffrent dia.
2 parks are provided of around 1600 sq mts .parks areprovided in the colony . these parks can be used a childrens
Enough tree planting is planned which is more than the required numbers
All the electric supply would be underground with a small sub station in the front of the project.iron poles with steet lights will be places all over the campus and proper electricfication with tranformer and wiring will be done as shown in the layout
A community centre is planned at the stilt level
STP with more than the desired capacity shall be made for this. treatment and disposal system of sewage and sullage water will be provided by construction STP Plants.
Enough space for the garbage collection is planned, same would be disposed with the help of local body.
Rain water harvesting is planned.
Solar panels would be used to fulfil this
Sprinklers, alarms and fire exits have been planned on every floor.
The proposed commercial space would be utilised for the same
Yes, it is present according to the norms
Proposed according to plan
Showing 2 blocks with 372 units
Total Carpet Area
20104.26 m²
216400.24 ft²
Total Units
372
5 different types
Blocks & Floors
2
10 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
10910.00 m²
117434.15 ft²