RERA Received Date
Completion Date
RERA ID
27.873204
79.931631
The entire plot is surrounded by boudary will having total 1 no. of entry gate and 1no. of exit gate from the 12m wide front road.
3.0-3.5m high and 225 mm thick Boundary wall designed . Brick Work of 9inches and rcc work in column and beam has been used as per design. MS Broad entrance and exit gates are developed with boundary.
High quality concrete pavers will be used as per deisgn suggeseted by the Architechts for internal road.
All internal roads will have 0.75m wide footpath in 100 mm thick concrete cross pavers or equivalent finishes.
Our overhead Town of 3,50,000 ltr. Capacity shall be provided. Also end user shall be use their individual RO system as per their requirement. Overhead tanks shall be provided on building terrace for distribution through gravity.
Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening and oveflow from the STP shall be connect with the Municiple sewarage system.
Storm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain line.
There are seven parks with play area for childrens and different recretional activities. Facility of Open Gym will be provided as per Architecht designs.
5 types of trees shall be provided as per landscape design.
We have design the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar.
NA
Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening and oveflow from the STP shall be connect with the Municiple sewarage system.
There is a proper garbage collection area provided for the solid waste management.
A well designed rain water harvesting system shall be provided in the project.
We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor.
Since all the buildings are less than 10m in height all the fire norms shall be followed as NBC and approval of fire department.
STP ,Storm water and water supply system shall be Provided. Transfer pumps to fill the domestic overhead tank. Water for domestic use & Flushing go down through gravity from domestic as well as flushing tanks. All Sewgage shall be go to the STP for recycling the water. Storm water for Roof,Roads and other area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain.
NA
NA
Showing 1 blocks with 3 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
77890.00 m²
838400.17 ft²