Overview

Launch Date

01-04-2023

Completion Date

31-03-2028

RERA ID

UPRERAPRJ676964/04/2024

Basic Details

Project TypeNew
Project CategoryMixed
Total area in round figure (Sq.mt.)2033
Project NameCentral Towers
Registration Fee (in Rs.)23250
AddressArazi No.: 101 Mi, Aarazi Chavni, Sadar, Gorakhpur
Village/Locality/Sector etc.Village- Aarazi Chavni, Gorakhpur
StateUttar Pradesh
Project Duration (In month)60
DistrictGorakhpur
Original Start Date-
TehsilGorakhpur
Proposed Start Date01-04-2023
Sanctioning Competent AuthorityGorakhpur Development Authority
Project Cost (in Lacs)2429
Proposed Completion Date31-03-2028

Location

Latitude

26.7535575

Longitude

83.3744207

Bank Details

Account Details
Name of the AccountAisshpra Developers Pvt Ltd Collection Account Central Towers
Account Number45202000001654
Bank NameIndian Overseas Bank
Branch NameMain Branch
Branch AddressVijaya Chowk, Gorakhpur
Branch StateUttar Pradesh
Branch DistrictGorakhpur
IFSC CodeIOBA0000452
Branch Email Addressgrkprbr@lucsco.iobnet.co.in
Separate Account Details
Name of the AccountAisshpra Developers Pvt Ltd Separate Bank Account Central Towers
Account Number45202000001653
Bank NameIndian Overseas Bank
Branch NameMain Branch
Branch AddressVijaya Chowk, Gorakhpur
Branch StateUttar Pradesh
Branch DistrictGorakhpur
IFSC CodeIOBA0000452
Transaction Account Details
Name of the AccountAisshpra Developers Pvt Ltd Transaction Account Central Towers
Account Number45202000001655
Bank NameIndian Overseas Bank
Branch NameMain Branch
Branch AddressVijaya Chowk, Gorakhpur
Branch StateUttar Pradesh
Branch DistrictGorakhpur
IFSC CodeIOBA0000452

Development Works

Demarcation of Plots

We have plot of size 2033.38 sq. mtr.having 1 main entrance gate from the 30 m wide front road.

Boundary Wall

2 m high and 230 mm thick Brick work and rcc work in column and beam. At the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall.

Road Work

From the main entrance gate we have 80 mm thick interlocking brick /RCC road through out the project. Whose wideness starts from 10 mtr.

Footpaths

We would not provide any footpath

Water Supply Including Drinking Water Facilities

We will provide Two nos. of pump for the requirement of blocks through underground pipelines.

Sewer System

Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.when come into force.

Drain

Storm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.

Parks

We will provide green area with the different activities and the green area will have gaming facilities for kids.

Tree Planting

We will provide many type of trees all along the boundary wall & green area

Design For Electric Supply Including Street Lighting

We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc.

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force.

Solid Waste Management And Disposal System

There are a proper garbage collection area provided for the solid waste management.

Water Conservation System

We will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.

Energy Management System Including Use of Renewable Energy

We will use LED lights fitting in external area as well as solar lights and we will suggest to individual also to use.

Fire Protection And Fire Safety System

We will provide Fire Fighting facility in common areas as per NOC norms.

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

We will provide fire staircases and emergency exit in our project for emergency evacuation services

Other Miscellaneous Work

NA

Documents

Registry Document

No: 7450 | Date: 21-05-2022

Extract of Khatauni

No: 1402 | Date: -

Sale Deed

No: 5147 | Date: 29-07-2008

Sale Deed

No: 1582 | Date: 12-02-2013

Sale Deed

No: 9317 | Date: 02-09-2013

Extract of Khatauni

No: Superimposed Sajra Plan | Date: -

Extract of Khatauni

No: Superimposed Sajra Plan | Date: -

Details of Encumbrances

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

CA CERTIFICATE

ARCHITECT CERTIFICATE

Details of Encumbrances

Uploaded: 22-02-2024

Commencement Certificate

Uploaded: 14-12-2023

Other Plan(If Any)

Uploaded: 07-02-2024

Proforma of Application Form

Uploaded: 14-12-2023

Proforma of Allotment Letter

Uploaded: 30-01-2024

Proforma of Conveyance Deed

Uploaded: 30-01-2024

Waste Disposal Plan

Uploaded: 07-02-2024

Water Supply Plan

Uploaded: 07-02-2024

Electricity Supply Plan

Uploaded: 07-02-2024

Development Work Plan

Uploaded: 07-02-2024

Affidavit

Uploaded: 17-01-2024

CA CERTIFICATE

Uploaded: 28-02-2024

ARCHITECT CERTIFICATE

Uploaded: 07-02-2024

ENGINEERS CERTIFICATE

Uploaded: 17-01-2024

Other

Uploaded: 14-12-2023

Proforma of Agreement for Sale

Uploaded: 30-01-2024

Permits

Orignal Permit NoResiComm Building/03114/GKDA/BP/22-23/0883/14092022
Orignal Permit Date31-03-2023
Valid Upto30-03-2028
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto30-03-2031
End Date31-03-2028
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)Padmakar Tripathi C/o Avayava Construction Company
Contractor AddressA-4 New Nandi Vihar Colony Chinhat Lucknow
Architect NameAshish Shrivastava
Architect Address935/D, Matri Anchal, Gorakhnath Railway Crossing, Gorakhpur (U.P.).
Architect Licence NumberCA/97/21613
Structural Engineer NameAyush Singh
Structural Engineer AddressH.No-48C, Indiranagar, Rasoolpour, Post- Shiv Puri New Colony,Gorakhpur
Mobile number(Project Co-ordinator)9795158881

Land Details

AFS

Showing 1 blocks with 41 units

Property Summary

Total Carpet Area

5188.24

55845.70 ft²

Total Units

41

4 different types

Blocks & Floors

1

11 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:126.54
Balconies:77
Parking ratio:0.00 per unit

Block TOWER 1

41 units

Khasra Details

Total Area

2033.38

21887.10 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No101 Mi
Area(In Sq. Mt.)2033.38

Other Details

Contractor Name (if any)Padmakar Tripathi C/o Avayava Construction Company
Contractor AddressA-4 New Nandi Vihar Colony Chinhat Lucknow
Architect NameAshish Shrivastava
Architect Address935/D, Matri Anchal, Gorakhnath Railway Crossing, Gorakhpur (U.P.).
Architect Licence NumberCA/97/21613
Structural Engineer NameAyush Singh
Structural Engineer AddressH.No-48C, Indiranagar, Rasoolpour, Post- Shiv Puri New Colony,Gorakhpur
Mobile number(Project Co-ordinator)9795158881