Have queries on this Project?
27.564410
77.683684
Showing 1 blocks with 107 units
Total Carpet Area
4797.11 m²
51635.61 ft²
Total Units
106
4 different types
Blocks & Floors
1
9 floors across all blocks
Parking
0
0 garages, 0 open
No: DOCUMENT NUMBER 12025 IN BOOK NO. 1, VOLUME NO. 10687 AT PAGES 3572 TO 370 | Date:
Total Area
2286.00 m²
24606.28 ft²
Covered Boundary walls. Plot demarcated upto plinth level of 0.9 meter and in observation of technical person.
R.C.C Column, beam and traditional bricks as per drawings. Boundary in bricks upto 1.2 meter with MS or terracotta jaali upto 2.125 meter from plinth level.
Cement concrete road/interlocking pavers. 6 meter wide and 165 meter in length internal road of cement and concrete and reinforcement with ratio of 1-1.5-3 (cement, sand and aggregate).
Interlocking pavers and stone pavers. 1.5 meter pathway in 6 meter wide road in cement stamping or in stone cobbels.
Ground water discharge/Municiple water supply with chlorine dozer. Water intake from borewell and from municipal supply line which further stored in underground tanks of fire and domestic. Store water further supply to overhead tanks for daily supply to all flats. Total water required for UGT is 52 KL.
Soil waste pipe and waste water lay separately in tower. Connected to manhole through hanging line in basement. The length of the main line is 165 meter.
Separate drain pipes for terrace and internal roads for rain water harvesting pits. The length of the main storm water line is 165 meter.
No park facility in project.
Native trees for plantation as per requirements for building bye laws. 30 native trees of Alstonia scholaris, silver oak tree, Ficus infectoria and Delonix Regia.
Electric substation for H.T. to low tension power supply which is further connected to DG set for power backup. Two transformer of 315 kva and 250 kva. DG set of 500 kva.
No community buildings requirement as per MVDA.
Sewer line connected to municiple main line for treatment. 50 KLD sewage treatment plan.
Door to door collection and further it will be stored in garbage collection room on ground and then disposed through municipal vehicle. 15 sq. mt. garbage accumulation room on stilt floor.
Rain water harvesting pits for water conservation. 50 KLD sewage treatment plan to treat waste water to use in flushing.
Door to door segregation, common DG to save energy in Emergency, Reflectors for signages.
Fire hose case/reel on each floor with wet riser connected to overhead the underground water tanks.
Gymnasium and indoor games on stilt floor.
Fire alarm system and separate stairs for emergency evacuation through ground or terrace.
N/A