Launch Date
Completion Date
RERA ID
25.390269
82.981039
Not Applicable.
Elegant design integrated with security rails and patterns as per approved building plan.
Peripheral loop of road connect to each retail entry points with dedicated drop off plaza for cars to stop and drop the visitors.
Network of footpaths connected the various part in the landscape, building and gardens as per the approved building plan.
Varanasi Nagar Nigam and Jal Nigam shall provide water supply to entire society. Further water will be treated and supplied at customer premisethrough piping pump in and out.
Centralized STP to treated the sewage and building having its own down corner connected to the main seserage line as per approved drawing.
Centralized STP to treated the sewage and building having its own down corner connected to the main sewerage line as per approved drawing.
As per approved master plan.
As per approved master plan.
Single feeder shall be obtain from UPPCL and connect to central substation and entire project shall have street lighting.
Not Applicable
Central STP for entire project and building shall be connected to STP.
Project shall have waste segregation area and OWC for treatment of Organic Waste.
Adequate number of Recharge Pits shall be made.
LED Lights and Solar Light Pannels shall be used for efficient energy management.
Provided
Common Social Infrastructure shall be provided as per approved building plan.
Exit signage in common area shall be provided.
Not Applicable.
Showing 1 blocks with 114 units
Total Carpet Area
17813.71 m²
191744.99 ft²
Total Units
139
2 different types
Blocks & Floors
1
5 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
14239.01 m²
153267.28 ft²