Have queries on this Project?
25.473296
78.617234
Showing 1 blocks with 2 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
23610.00 m²
254135.68 ft²
As per approved layout Plan .The Plot shall be Demarcated by means of T S
Boundary wall has been constructed as per Yojna no -03
As per specificatios of UP awas Ewam Vikass prishad ( Chief Enginner office Order no-685/M-4/2017 at 19-03-201 and others ). Work shall be carried out as per Utter Pradesh Public department ( UPPWD. ) SOR And Specifications . SOR 2019-2020
As per specifications of UP Awas Ewam Vikash Parishad and Inline with approved map ( Chief engineer office order no 685/M-4/2017 at 19-03 -2017 and other ) . Work shall be carried out as per Utter pradesh Public work ( UP PWD) SOR and Specification 2019-2020.
Provided / shall be provided as per Norms and specifications of UP Jal Nigam . The Network consist of Trunk Water line laid in trunk road cross section with OHT And CWR in Sector to cater to the plots
The under ground sewer network with Manhole with Chambers shall be provided in accordance with UP Jal Nigam specifications . and Chief Engineer order no -912/M-1/94 date 20-102005 .
Open Channel Water drainage Network shall be provided . Drain shall be of type C1-C2 C3.......C 11 etc. The construction shall be as per UP PWD. Specification and SOR 2019-2020 .
Parks shall be provided as shown in approved Lay-out .The construction and development shall be in accordance with Office order no 878/ISO dt-05-04-2007.
provided as per Side of Roads and parks as per approved Layout.
Shall be done UPAVP and Will be Handed over to UPPCL. for issuing individual Electric Connection.
As per approved layout .
Planned sewer network and STP shall be constructed .
door to door collection of solid waste will be done . and shall be disposed as per guidelines .
Rain water harvesting in individual plots inline with the building by laws to be done by concerned allottes.
solar panels in individual plots in line with the building by laws to be done by concerning allotte
fire hydrant provided in line with fire norms
as per approved layout plots for school, facility aanganbari etc are reserved
in line with the govt guidelines
in accordance with registration booklet