NewActive

BANSURI HOMES-1

Agra, Uttar Pradesh
01-08-2024
Launch Date
New
Type
15-07-2029
Completion Date

Overview

Launch Date

01-08-2024

Completion Date

15-07-2029

RERA ID

UPRERAPRJ534633/11/2024

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)8686
Project NameBANSURI HOMES-1
Registration Fee (in Rs.)48500
AddressOn Khsra No. 98, 99
Village/Locality/Sector etc.Mauja Kalwari
StateUttar Pradesh
Project Duration (In month)60
DistrictAgra
Original Start Date-
TehsilAgra
Proposed Start Date01-08-2024
Sanctioning Competent AuthorityAgra Development Authority
Project Cost (in Lacs)2087
Proposed Completion Date15-07-2029

Location

Latitude

27.181912

Longitude

77.939068

Bank Details

Account Details
Name of the AccountBEE PEE GEE PEE HOUSING BH1 COLLECTION A/C
Account Number120029163540
Bank NameCANARA BANK
Branch Name192 AGRA MG ROAD 282002
Branch AddressNO. 71, MG ROAD, NEHRU NAGAR AGRA
IFSC CodeCNRB0000192
Branch DistrictAgra
Branch StateSelect
Branch Email AddressCB0192@CANARABANK.COM
Separate Account Details
Name of the AccountBEE PEE GEE PEE HOUSING BH1 SEPARATE A/C
Account Number120029192515
Bank NameCANARA BANK
Branch Name192- AGRA M G ROAD 282002
Branch Address71 - M G ROAD, NEHRU NAGRA AGRA 282002
Branch StateUttar Pradesh
Branch DistrictAgra
IFSC CodeCNRB0000192
Transaction Account Details
Name of the AccountBEE PEE GEE PEE HOUSING BH1 TRANSACTION A/C
Account Number120001125816
Bank NameCANARA BANK
Branch Name192- AGRA M G ROAD 282002
Branch Address71, NEHRU NAGRA M G ROAD , AGRA 282002
Branch StateUttar Pradesh
Branch DistrictAgra
IFSC CodeCNRB0000192

Development Works

Demarcation of Plots

All the plots will be demarcated as per the orientation and dimension. In addition to this all the project amenities will also be as per the specified size and dimension including of roads , drains and park.

Boundary Wall

The boundary wall will constructed at the required locations to keep the project to single point entry. The height of the wall will be 6 to 8 feet high with foundation 4 feet deep. the wall will be constructed in brick and mortar and will be plastered and painted.

Road Work

the total of 2455 square meter of the project area will be covered with the 9 and 7.5 m wide road. The wearing course will be the interlocking-paving tiles. The paving tiles of minimum 80 mm will be laid over the sand band of 30-50 mm. The Granular sub-base will be compacted to the required density and also the subgrade.

Footpaths

The interlocking paver blocks will be laid over the compacted subgrade and the sand bed of 30-50 mm. The paver block will be of min. 60mm depth.

Water Supply Including Drinking Water Facilities

The total demand of water for the project is estimated at 230 cu-m approx per day. The ground water will be pumped through submersible pump to the the OHT and will be delivered through the PVC pipe system to the all units of the project.

Sewer System

The waste water flow is estimated to 90 cu/m at peak. The underground Pipes of minimum 600 mm will be laid to cater for the domestic sewer. The manholes will be constructed at all locations as per design to ensure continuous flow of waste water and maintenance if required

Drain

The trapezoidal drains lined and covered will be constructed in the project . The iron grill will be used at crossings. the minimum height of the drain will be 300mm and the top width also 300mm. The base of the drain will be 100mm concrete.

Parks

Total area under park is 1303 square meter in the park . Total of two parks with kids and elder people facilities will be developed in the project.

Tree Planting

Tress will be planted along the periphery of the parks and at all suitable location. The all weather trees suitable to the local environment will be selected and planted in the project.

Design For Electric Supply Including Street Lighting

The electrical design will be as per the standards of the electrical board. The electrical poles in the project will be minimum 4.5 m high with the lamp of 130 lux. The separate transformer will be installed for the project. The distribution boxes will be installed at poles and the connection will be given to each unit of the project.

Community Buildings

Not Applicable

Treatment and Disposal System of Sewage and Sullage water

The STP will be installed with multistage treatment for BOD and COD. The first stage will be separation of solid and liquid. The secondary treatment will be treatment of BOD and COD and separation of effluents. Tertiary treatment will be done to make the effluents suitable to dispose as per environmental standards

Solid Waste Management And Disposal System

The dalab ghar will be constructed in the project and the dust bins will be installed at all suitable locations of the project to collect the waste separately

Water Conservation System

The water table is encountered at 24 m depth . The collection chamber of multi layer filtration will be constructed and the perforated covered pipes will be lead to the depth of 25 m . The surface runoff will be collected to recharge the water table

Energy Management System Including Use of Renewable Energy

Not Applicable

Fire Protection And Fire Safety System

Not Applicable

Social Infrastructure And Other Public Amenities Including Public Health Services

Not Applicable

Emergency Evacuation Services

Not Applicable

Other Miscellaneous Work

As per the projects requirements.

Documents

Registry Document

No: 3449 | Date: 12-05-2023

Registry Document

No: 3561 | Date: 12-05-2023

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Other

Details of Encumbrances

Uploaded: 02-10-2024

Commencement Certificate

Uploaded: 08-09-2024

Proforma of Application Form

Uploaded: 09-09-2024

Proforma of Allotment Letter

Uploaded: 09-09-2024

Proforma of Conveyance Deed

Uploaded: 08-09-2024

Waste Disposal Plan

Uploaded: 08-09-2024

Water Supply Plan

Uploaded: 08-09-2024

Electricity Supply Plan

Uploaded: 08-09-2024

Development Work Plan

Uploaded: 08-09-2024

Affidavit

Uploaded: 08-09-2024

CA CERTIFICATE

Uploaded: 20-10-2024

ARCHITECT CERTIFICATE

Uploaded: 20-10-2024

ENGINEERS CERTIFICATE

Uploaded: 26-10-2024

Other

Uploaded: 03-10-2024

Proforma of Agreement for Sale

Uploaded: 09-09-2024

Permits

Orignal Permit NoPlottet Resi Development/Plotted Housing/05751/ADA/LD/23-24/0400/02042024
Orignal Permit Date16-07-2024
Valid Upto15-07-2029
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto14-07-2032
End Date15-07-2029
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)Pramod Singh
Contractor AddressS/o Master Singh, Bahrampur, Agra, Uttar Pradesh, 283202
Architect NameYeshvir Singh
Architect Address22, khandari Road, Bhagirathi Devi Marg, Khandari, Agra
Architect Licence NumberCA/2000/25908
Structural Engineer NameA K UPDHYAY
Structural Engineer Address56, JAIPUR HOUSE MARKET, AGRA 282010
Mobile number(Project Co-ordinator)8171276216

Khasra Details

Total Area

9590.00

103225.80 ft²

2 plots
Khasra
TypeKhasra
Khasra/Plot No99, Mauja Kalwari
Area(In Sq. Mt.)4650
Khasra
TypeKhasra
Khasra/Plot No98, Mauja Kalwari
Area(In Sq. Mt.)4940

Other Details

Contractor Name (if any)Pramod Singh
Contractor AddressS/o Master Singh, Bahrampur, Agra, Uttar Pradesh, 283202
Architect NameYeshvir Singh
Architect Address22, khandari Road, Bhagirathi Devi Marg, Khandari, Agra
Architect Licence NumberCA/2000/25908
Structural Engineer NameA K UPDHYAY
Structural Engineer Address56, JAIPUR HOUSE MARKET, AGRA 282010
Mobile number(Project Co-ordinator)8171276216