27.301024
78.029320
Plot Demarcation Already done on Site and demarcated by the Temporary Foundry wall
6 feet height boundary wall with RCC column and Brick Work
bitumen finish metal road
footpath proposed in park and one side of road with concrete tiles
Water Supply to the flats from overhead water tank that which will fill direct from the under ground water tank
sewer line of concrete pipe that connect to STP
semi closed drainage at one side of the Road
9296 Sqf central park that have proposal of some fruit trees and flowering plants, 6 feet wide jogging track
Tree planting proposed in park and outer periphery of boundary Wall
yes
Temple, community hall in semi basement
STP proposed on site
yes
Rain Water Harvesting pit proposed at site
Solar Lights proposed on site
External fire safety with underground water tank proposed on site and All Stairs are one side open
Public park, Community hall, Shops
yes
Entrace Gate, Temple, Electric Suplly , Gaurd room, landscape , fountain and water bodies
Showing 3 blocks with 26 units
Total Carpet Area
7089.34 m²
76308.95 ft²
Total Units
142
2 different types
Blocks & Floors
3
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
5150.00 m²
55434.08 ft²